AwardTape / Contracts / FA2543-24-F-0035
FA2543-24-F-0035: $556K Department of the Air Force Award to Weil Construction Inc
Front range federal installations have a requirement for a macc to support a range of design-bid-build/design-build services up to 100%, maintenance, repair, minor construction work on rp. for more details, see the statement of work dated .... Contracting activity: FA2543 460 CONS. Estimated completion: 2026-07-28.
$556K contract action / $556K cumulative ceiling / COMPETITION NOT STATED / 2026-07-28 completion / FA2543 FA2543 460 CONS
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA2543-24-F-0035 (unhyphenated: FA254324F0035) · Parent Vehicle: FA2517-20-D-0005 |
|---|---|
| Prime Contractor (Awardee) |
Weil Construction Inc
(Colorado)
FY2024-FY2026 Federal Defense Portfolio: $13.5M obligated across 62 contracts
|
| Obligated Amount | $555,569 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $555,569 |
| USAspending / FPDS Obligation History | Base Record Obligated: $555,569 (signed 2024-09-13, latest FPDS action 2026-02-04) · 15 Issued Delivery/Task Order(s) totaling $7,684,927 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA2543: FA2543 460 CONS |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Colorado |
| Estimated Completion Date | 2026-07-28 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Front range federal installations have a requirement for a macc to support a range of design-bid-build/design-build services up to 100%, maintenance, repair, minor construction work on rp. for more details, see the statement of work dated ...
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Weil Construction Inc
- Delivery Runway: Active through 2026-07-28
- Requirement Scope: Front range federal installations have a requirement for a macc to support a range of design-bid-build/design-build services up to 100%, maintenance, repair, minor construction work on rp. for more details, see the statement of work dated ...
- Federal Supply Class: PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract FA2543-24-F-0035 when contacting Weil Construction Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA2543 (FA2543 460 CONS)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA2543-24-F-0035 (15 shown, $7.7M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA251726FC008 | $1.4M | Weil Construction Inc | 2026-03-30 / 2026-03-30 | 2027-01-25 | This project is to upgrade and repair the building 2 atrium. |
| FA461323F0079 | $852K | Weil Construction Inc | 2023-10-30 / 2026-05-22 | 2026-07-31 | Interior renovation bldg 324 (osi)-design build. |
| FA700024F0082 | $742K | Weil Construction Inc | 2024-07-02 / 2025-11-21 | 2026-01-09 | The purpose of this award is for the repair of culverts at the bullseye auxiliary airfield, colorado. |
| FA254323F0025 | $654K | Weil Construction Inc | 2023-10-17 / 2026-05-12 | 2026-07-13 | Future operationally resilient ground evolution (forge) building 442 room 560 fit up |
| FA251726FC007 | $543K | Weil Construction Inc | 2026-03-25 / 2026-03-25 | 2027-04-04 | Replace s6-010 and s5-040 switches |
| FA251726FC016 | $487K | Weil Construction Inc | 2026-03-31 / 2026-03-31 | 2027-02-21 | Powerpro b1328 renovate offices |
| FA251725F0050 | $483K | Weil Construction Inc | 2025-05-27 / 2025-12-05 | 2026-02-17 | Frmacc at cheyenne mountain space force station, co for: saxc 11-1028 repair exterior b101 |
| FA461324F0012 | $428K | Weil Construction Inc | 2023-11-15 / 2025-03-27 | 2025-04-07 | Replace rooftop dx unit bldg 3650 iaw all attached documents and sow |
| W911RZ24F0050 | $420K | Weil Construction Inc | 2024-06-10 / 2025-02-10 | 2025-09-15 | Civ20-010 cns backup generation b350, 18 |
| FA700024F0050 | $417K | Weil Construction Inc | 2024-04-16 / 2024-04-16 | 2025-01-08 | This award is to sustain and repair the sf ops building 8024. |
| FA461325F0065 | $281K | Weil Construction Inc | 2025-09-30 / 2026-05-08 | 2026-09-30 | Build and construct 90lrs covered parking system |
| FA251725F0075 | $260K | Weil Construction Inc | 2025-06-17 / 2025-09-24 | 2025-10-23 | Roof repair of bldg. 365 on peterson space force base. |
| FA255024F0054 | $246K | Weil Construction Inc | 2024-09-30 / 2024-11-26 | 2025-04-15 | 50 ces has 2 hvac package units located at b715 on schriever space force base that needs to be replaced for hvac system to be 100% operational |
| FA251724F0225 | $217K | Weil Construction Inc | 2024-09-30 / 2025-07-10 | 2025-07-11 | The front range federal installations have a requirement for a multiple award construction contract to support a broad range of design-bid-build/design-build services up to 100% for maintenance, repair and minor construction work on real ... |
| FA700026F0093 | $208K | Weil Construction Inc | 2026-05-01 / 2026-05-01 | 2026-07-07 | The earthen berm at the catm pistol range needs to have the lead and non-lead projectiles removed from the soil to minimize ricochets, down-range hazards, and the potential for lead migration from water run-off and seepage into groundwater. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA2543-24-F-0035
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗