AwardTape / Contracts / FA2835-25-F-0047
FA2835-25-F-0047: $111K Department of the Air Force Award to Cornerstone Construction Services, LLC
In accordance with the statement of work (sow) dated 12 november 2024, this project is intended to insulate water pipes condensing off air handler unit number four (4).. Contracting activity: FA2835 AFLCMC HANSCOM PZI. Estimated completion: 2026-01-31.
$111K contract action / $111K cumulative ceiling / COMPETITION NOT STATED / 2026-01-31 completion / FA2835 FA2835 AFLCMC HANSCOM PZI
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA2835-25-F-0047 (unhyphenated: FA283525F0047) · Parent Vehicle: FA2835-23-D-0003 |
|---|---|
| Prime Contractor (Awardee) |
Cornerstone Construction Services, LLC
(Massachusetts)
FY2024-FY2026 Federal Defense Portfolio: $3.1M obligated across 12 contracts
|
| Obligated Amount | $111,000 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $111,000 |
| USAspending / FPDS Obligation History | Base Record Obligated: $111,000 (signed 2025-07-18, latest FPDS action 2025-12-02) · 4 Issued Delivery/Task Order(s) totaling $373,771 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA2835: FA2835 AFLCMC HANSCOM PZI |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Massachusetts |
| Estimated Completion Date | 2026-01-31 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
In accordance with the statement of work (sow) dated 12 november 2024, this project is intended to insulate water pipes condensing off air handler unit number four (4).
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Cornerstone Construction Services, LLC
- Delivery Runway: Active through 2026-01-31
- Requirement Scope: In accordance with the statement of work (sow) dated 12 november 2024, this project is intended to insulate water pipes condensing off air handler unit number four (4).
- Federal Supply Class: PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract FA2835-25-F-0047 when contacting Cornerstone Construction Services, LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA2835 (FA2835 AFLCMC HANSCOM PZI)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA2835-25-F-0047 (4 shown, $374K obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA283525F0090 | $237K | Cornerstone Construction Services, LLC | 2025-09-18 / 2025-09-18 | 2026-09-17 | In accordance with the statement of work (sow) dated 7 december 2021, this idiq is for a broad range of commercial services, supplies and maintenance, repair, alteration, and minor construction projects on real property. |
| FA283525F0084 | $112K | Cornerstone Construction Services, LLC | 2025-09-15 / 2026-01-06 | 2026-02-13 | In accordance with the revised statement of work sow dated 11 august 2025, this projects intent is to address life safety concerns and install new fire alarms and carbon dioxide detecting systems for eleven cabins at fourth cliff. |
| FA283525F0109 | $13K | Cornerstone Construction Services, LLC | 2025-09-26 / 2025-09-26 | 2025-11-10 | In accordance with the macspo sow - camus boiler repair b1604 amended, this project is intended to repair and start the camus boiler at b1604. |
| FA283525F0022 | $12K | Cornerstone Construction Services, LLC | 2025-02-11 / 2025-02-11 | 2025-06-11 | In accordance with the statement of work (sow) dated, 21 november 2025, this project is intended to remove and dispose of existing flooring and install non-porous vinyl composition tile flooring with vinyl cove base in building 1725. |
Recent Contract Actions from Buying Office FA2835 (FA2835 AFLCMC HANSCOM PZI)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-06-11 | FA2835-26-D-0006 | Campbell Construction Group, LLC | $71.9M | Jun 10, 2031 | Benaka and 4 others share $71.9M contract for a contract vehicle to complete complex construction requirements that involve multiple trades.... |
| 2026-02-18 | FA2835-26-D-0001 | Split Excavating | $35.5M | Feb 17, 2031 | Split Excavating wins $35.49M contract for required demolition, earthwork, and repair/replacement of roadways, curbing and sidewalks. Air Fo... |
| 2025-09-26 | FA2835-25-C-0032 | Veterans Development | $14.6M | Sep 20, 2027 | Veterans Development wins $14.6M contract for repairs to a Child Development Center building. Air Force Life Cycle Management Center $14.6M ... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA2835-25-F-0047
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗