FA3300-25-F-0025: $23K Department of the Air Force Award to Reihart Construction & Services LLC
Prepare and clean all existing painted surfaces to include removal of gravel and grass, repaint existing lane striping, start, finish, and quarter mile markings and realign curves at the east end of track.. Contracting activity: FA3300 42 CONS CC. Estimated completion: 2025-06-12.
$23K contract action / $23K cumulative ceiling / COMPETITION NOT STATED / 2025-06-12 completion / FA3300 FA3300 42 CONS CC
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA3300-25-F-0025 (unhyphenated: FA330025F0025) · Parent Vehicle: FA3300-24-D-0006 |
|---|---|
| Prime Contractor (Awardee) |
Reihart Construction & Services LLC
(Alabama)
FY2024-FY2026 Federal Defense Portfolio: $2.1M obligated across 9 contracts
|
| Obligated Amount | $22,920 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $22,920 |
| USAspending / FPDS Obligation History | Base Record Obligated: $22,920 (signed 2025-04-04, latest FPDS action 2025-04-04) · 4 Issued Delivery/Task Order(s) totaling $2,085,716 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA3300: FA3300 42 CONS CC |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2PA (Repair Or Alteration Of Recreation Facilities (Non-Building)) · NAICS 237310 (Highway, Street, And Bridge Construction) |
| Work Locations & Funding | Primary Place of Performance: Alabama |
| Estimated Completion Date | 2025-06-12 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Prepare and clean all existing painted surfaces to include removal of gravel and grass, repaint existing lane striping, start, finish, and quarter mile markings and realign curves at the east end of track.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Reihart Construction & Services LLC
- Delivery Runway: Active through 2025-06-12
- Requirement Scope: Prepare and clean all existing painted surfaces to include removal of gravel and grass, repaint existing lane striping, start, finish, and quarter mile markings and realign curves at the east end of track.
- Federal Supply Class: PSC Z2PA (Repair Or Alteration Of Recreation Facilities (Non-Building))
- BD Action: Reference Prime Contract FA3300-25-F-0025 when contacting Reihart Construction & Services LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA3300 (FA3300 42 CONS CC)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA3300-25-F-0025 (4 shown, $2.1M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA330026F0050 | $720K | Reihart Construction & Services LLC | 2026-06-01 / 2026-06-01 | 2026-10-31 | Repair streets and replace pavement markings as per drawings and specifications. |
| FA330025F0096 | $625K | Reihart Construction & Services LLC | 2025-09-11 / 2025-09-11 | 2026-05-20 | Phase 2 of the reconstruction of march road on maxwell afb, al |
| FA330024F0138 | $547K | Reihart Construction & Services LLC | 2024-09-30 / 2024-09-30 | 2025-05-13 | Repair misc. parking lots and streets, maxwell afb. |
| FA330024F0073 | $194K | Reihart Construction & Services LLC | 2024-08-02 / 2025-01-24 | 2025-01-25 | Repair of building 804 parking lot (pnqs 24-4806) |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA3300-25-F-0025
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗