Repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the tyndall afb main airfield. the existing stormwater infrastructure is in degraded condition and needs to be replaced.. Contracting activity: FA4819 325 CONS PKP. Estimated completion: 2027-05-22.
$7.4M contract action / $7.4M cumulative ceiling / COMPETITION NOT STATED / 2027-05-22 completion / FA4819 FA4819 325 CONS PKP
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA4819-26-F-0011 (unhyphenated: FA481926F0011) · Parent Vehicle: FA4819-21-D-0001 |
|---|---|
| Prime Contractor (Awardee) |
Pettibone Concrete Construction Inc
(Florida)
FY2024-FY2026 Federal Defense Portfolio: $14.6M obligated across 13 contracts
|
| Obligated Amount | $7,437,074 ($7.4M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $7,437,074 |
| USAspending / FPDS Obligation History | Base Record Obligated: $7,437,074 (signed 2026-05-13, latest FPDS action 2026-05-13) · 11 Issued Delivery/Task Order(s) totaling $7,147,223 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA4819: FA4819 325 CONS PKP |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings) · NAICS 237310 (Highway, Street, And Bridge Construction) |
| Work Locations & Funding | Primary Place of Performance: Florida |
| Estimated Completion Date | 2027-05-22 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the tyndall afb main airfield. the existing stormwater infrastructure is in degraded condition and needs to be replaced.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Pettibone Concrete Construction Inc
- Delivery Runway: Active through 2027-05-22
- Requirement Scope: Repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the tyndall afb main airfield. the existing stormwater infrastructure is in degraded condition and needs to be replaced.
- Federal Supply Class: PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract FA4819-26-F-0011 when contacting Pettibone Concrete Construction Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA4819 (FA4819 325 CONS PKP)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA4819-26-F-0011 (11 shown, $7.1M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA481923F0037 | $3.1M | Pettibone Concrete Construction Inc | 2023-06-12 / 2026-03-25 | 2027-03-29 | Repair existing storm water drainpipe and drainage structures. |
| FA481926F0003 | $1.3M | Pettibone Concrete Construction Inc | 2026-03-16 / 2026-04-14 | 2026-07-21 | Maintenance of airfield paint and rubber |
| FA481924F0004 | $872K | Pettibone Concrete Construction Inc | 2023-12-21 / 2024-04-17 | 2024-06-15 | Maintain airfield paint markings on the tyndall flightline and remove excess rubber buildup on the main airfield runways. |
| FA481925F0049 | $834K | Pettibone Concrete Construction Inc | 2025-08-15 / 2025-09-11 | 2025-12-23 | Airfield marking repairs and painting |
| FA481924F0030 | $771K | Pettibone Concrete Construction Inc | 2024-06-25 / 2026-01-23 | 2026-01-24 | Repair existing barrier foundations on drone runway |
| FA481924F0014 | $98K | Pettibone Concrete Construction Inc | 2024-04-04 / 2024-04-04 | 2024-05-30 | The government requests a proposal to repair existing taxiway k concrete surface for future e-9 aircraft operations. |
| FA481925F0033 | $95K | Pettibone Concrete Construction Inc | 2025-08-15 / 2025-10-28 | 2025-12-15 | Repair taxiway |
| FA481924F0010 | $62K | Pettibone Concrete Construction Inc | 2024-02-27 / 2024-03-22 | 2024-03-21 | Concrete slab replacement support for research, development, test and evaluation projects at tyndall afb. |
| FA481925F0010 | $28K | Pettibone Concrete Construction Inc | 2025-01-16 / 2025-02-11 | 2025-05-10 | Install six new grounding points at selected areas of the former alert pad apron for temporary e-9 operations per the sow dated 20 nov 2024 . |
| FA481922F0116 | $0 | Pettibone Concrete Construction Inc | 2022-09-27 / 2024-03-01 | 2025-02-20 | The purpose of this project is to repair the airfield pavement located on taxiway a for the center portion of the slabs on tyndall afb. |
| FA481923F0005 | $0 | Pettibone Concrete Construction Inc | 2023-01-05 / 2024-02-08 | 2024-11-28 | Convert pavement and expand taxiway bravo |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA4819-26-F-0011
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗