AwardTape / Contracts / N00019-20-F-0365
N00019-20-F-0365: Defense Contract Management Agency Award to Raytheon Company
Tomahawk mid-body range safety subsystem (mrss) and flight test kits. Contracting activity: DCMA MISSILES. Estimated completion: 2024-03-29.
$30.3M cumulative ceiling / Sole-source / 2024-03-29 completion / N00019 DCMA MISSILES
1. Contract Summary & Primary Sources
| Contract Number (PIID) | N00019-20-F-0365 (unhyphenated: N0001920F0365) · Parent Vehicle: N00019-15-G-0003 |
|---|---|
| Prime Contractor (Awardee) |
Raytheon Company
$RTX
(Arizona)
FY2024-FY2026 Federal Defense Portfolio: $3.0B obligated across 417 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $30,302,784 |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2020-04-13, latest FPDS action 2026-05-15) · 15 Issued Delivery/Task Order(s) totaling -$214,377 |
| Awarding Branch / Agency | Defense Contract Management Agency |
| Contracting Command & DoDAAC | N00019: DCMA MISSILES |
| Competition & Contract Structure | SOLE-SOURCE · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC 1410 (Guided Missiles) · NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, And Nautical System And Instrument Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Arizona |
| Estimated Completion Date | 2024-03-29 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Tomahawk mid-body range safety subsystem (mrss) and flight test kits
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Raytheon Company
- Delivery Runway: Active through 2024-03-29
- Requirement Scope: Tomahawk mid-body range safety subsystem (mrss) and flight test kits
- Federal Supply Class: PSC 1410 (Guided Missiles)
- BD Action: Reference Prime Contract N00019-20-F-0365 when contacting Raytheon Company Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: N00019 (DCMA MISSILES)
- Acquisition Method: SOLE-SOURCE
- FOIA Jurisdiction: Naval Air Systems Command (NAVAIR) FOIA (Official Portal)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Issued Task & Delivery Orders under N00019-20-F-0365 (15 shown, -$214K obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| N0001919F4153 | $166K | Raytheon Company | 2019-08-22 / 2025-06-03 | 2025-01-31 | Maritime strike tomahawk gts upgrade |
| N0001918F2351 | $7K | Raytheon Company | 2018-05-29 / 2026-04-15 | 2023-10-31 | Technical support for software development&hardware modification |
| 0002 | $0 | Raytheon Company | 2015-12-30 / 2024-01-26 | 2018-07-13 | Retrofit kits gpp3 ecp 6381 |
| 0006 | $0 | Raytheon Company | 2017-03-23 / 2026-05-29 | 2027-12-31 | An/apg-79 config d depot upgrade |
| N0001919F2593 | $0 | Raytheon Company | 2019-06-17 / 2026-05-06 | 2026-04-30 | Tomahawk test equipment upgrades |
| N0001920F0493 | $0 | Raytheon Company | 2020-07-15 / 2026-02-25 | 2024-08-31 | Ttgts update |
| N0042119F0531 | $0 | Raytheon Company | 2019-08-23 / 2024-05-21 | 2024-05-31 | Mv-22, cmv-22, and cv-22 common software |
| N0001918F0491 | -$985 | Raytheon Company | 2018-04-25 / 2024-04-09 | 2019-05-25 | The purpose of this delivery order is to procure the tasks required to provide jsow missing planning software support and sustainment, under basic order agreement (boa) n00019-15-g-0003. igf::ot::igf |
| 4756 | -$1K | Raytheon Company | 2016-10-27 / 2024-10-28 | 2018-02-01 | Cwpe raaf f/a-18 |
| N0001918F6002 | -$1K | Raytheon Company | 2018-01-25 / 2024-09-30 | 2019-07-17 | Operational embedded software |
| N0001919F0309 | -$1K | Raytheon Company | 2019-06-19 / 2024-04-15 | 2022-03-31 | 2019 jsow mission planning |
| 5001 | -$38K | Raytheon Company | 2017-09-01 / 2026-03-09 | 2021-04-30 | Igf::ot::igf; labor&material&odc needed for asr range ext'n and refurbishment. |
| N0001918F2536 | -$63K | Raytheon Company | 2018-08-30 / 2023-12-12 | 2019-09-05 | Engineering support |
| N0001920F0324 | -$68K | Raytheon Company | 2020-08-11 / 2023-12-15 | 2022-01-10 | Repair of repairables&support services |
| N6893619F0613 | -$214K | Raytheon Company | 2019-09-27 / 2024-01-16 | 2021-03-26 | Non-recurring engineering efforts |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under N00019-20-F-0365 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by Raytheon Company across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| Lockheed Martin Corporation $LMT | $242.6M | 2025-02-14 | FA8611-24-C-B001 (Prime Network ($RTX)) | PRECISION MACHINED,OPTICAL ASSEMBLIES,PEDEST&GIMBALPLATFRM. |
| Lockheed Martin Corporation $LMT | $168.6M | 2025-10-07 | FA8611-24-C-B001 (Prime Network ($RTX)) | PRECISION MACHINED,OPTICAL ASSEMBLIES,OTHER TEST EQUIP,TEST EQUIPMENT,PEDEST&GIMBALPLATFRM,GROUND SUPPORT EQUIP. |
| Howmet Aerospace Inc $HWM | $114.5M | 2026-06-15 | N00019-24-C-0003 (Prime Network ($RTX)) | F135-PW-100 Engine Lot 18/19 & Engine Core Upgrade (ECU) single-crystal directionally solidified high-pressure turbine blades & vanes |
| Northrop Grumman Systems Corp $NOC | $101.0M | 2025-12-12 | N00019-24-C-0032 (Prime Network ($RTX)) | ROCKET MOTORS,NRE - ALL. |
| Mercury Systems Inc $MRCY | $68.4M | 2026-04-17 | N00024-24-C-5401 (Prime Network ($RTX)) | AN/SPY-6(V)1 & (V)4 Air and Missile Defense Radar (AMDR) rugged OpenVPX digital receiver/exciter & FPGA signal processing subassemblies |
| Leonardo Drs Inc $DRS | $61.8M | 2026-02-27 | W31P4Q-23-D-0019 (Prime Network ($RTX)) | Army Mobile-LIDS (M-LIDS) Counter-UAS cooled EO/IR thermal imaging gimbals and vehicle power distribution subsystems |
| Mercury Systems Inc $MRCY | $52.1M | 2026-05-08 | W31P4Q-24-C-0012 (Prime Network ($RTX)) | Lower Tier Air and Missile Defense Sensor (LTAMDS) Gallium Nitride (GaN) radar high-speed mixed-signal RF & blade processing modules |
| Ttm Technologies Inc $TTMI | $46.3M | 2026-04-02 | N00024-24-C-5401 (Prime Network ($RTX)) | AN/SPY-6(V) & Next Generation Jammer (NGJ-MB) high-density RF/microwave printed circuit boards and integrated backplane assemblies |
| Moog Inc $MOGA | $39.4M | 2026-03-09 | N00024-24-C-5312 (Prime Network ($RTX)) | Standard Missile-6 (SM-6 Block IA) & ESSM Block 2 electromechanical steering fin control actuation systems (CAS) |
| Raytheon-Rafael Area Protection Systems Llc $RTX | $37.1M | 2025-11-20 | M67854-25-C-0111 (Prime Network ($RTX)) | LAUNCHERS&CANNISTERS. |
Recent Contract Actions from Buying Office N00019 (DCMA MISSILES)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-27 | N00019-25-F-0120 | Lockheed Martin Corp. | $13.3M | April 2027 | Lockheed Martin Corp., Fort Worth, Texas, is awarded a $13,259,000 cost-plus-fixed-fee, level-of-effort modification (P00006) to a previousl... |
| 2026-10-27 | N00019-27-C-1010 | Lockheed Martin Corp. | $9.8M | October 2030 | Lockheed Martin Corp., Owego, New York, is awarded a $9,755,583 firm-fixed-price and cost-plus-fixed-fee contract for updated AN/ALQ-230 ele... |
| 2026-10-23 | N00019-27-F-1037 | Lockheed Martin Aeronautics Co. | $114.6M | January 2030 | Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $114,629,966 cost-plus-fixed-fee order (N0001927F1037) against a previously... |
| 2026-10-22 | N00019-23-C-0049 | Saab Inc. | $14.3M | June 2028 | Saab Inc., East Syracuse, New York, is awarded a $14,308,164 firm-fixed-price modification (P00026) to a previously awarded contract (N00019... |
| 2026-10-19 | N00019-23-C-0003 | Lockheed Martin Aeronautics Co. | $9.4M | March 2028 | Lockheed Martin Aeronautics Co., Fort Worth, Texas (N0001923C0003), is awarded a $9,376,464 firm-fixed-price modification (P00029) to a prev... |
| 2026-10-16 | N00019-27-D-1006 | Boeing | $80.0M | - | No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not comp... |
| 2026-10-15 | N00019-22-C-0015 | Lockheed Martin Aeronautics | $18.8M | - | The award record on file for N0001922C0015 shows a $118.71M ceiling and $118.71M obligated, as of the last USAspending load. |
| 2026-10-14 | N00019-26-F-2222 | Lockheed Martin | $16.1M | - | The award record on file for N0001924G0010 shows a $2.00M ceiling, as of the last USAspending load. |
Other Recent Department of War Awards to Raytheon Company
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-28 | N00019-25-G-0009 | Navy | $21.7M | - | Raytheon Technologies, Raytheon Missiles and Defense wins $21.7M order for non-recurring engineering to mitigate obsolete components. Naval ... |
| 2026-09-28 | N00019-25-G-0009 | Navy | $19.5M | - | Raytheon Technologies, Raytheon Missiles and Defense wins $19.5M order. Naval Air Systems Command $6.6M obligated now. |
| 2026-09-01 | N00019-25-G-0009 | Navy | $42.5M | - | Raytheon Co., managed by Collins Aerospace wins $42.5M order for technical, engineering, and restoration services in support of air traffic ... |
| 2026-07-09 | N00019-25-G-0009 | Navy | $102.0M | - | Raytheon Technologies, Raytheon Missiles and Defense wins $102.0M order for non-recurring engineering for the Capsule Launch System MK 45 pr... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for N00019-20-F-0365
Routed to Naval Air Systems Command (NAVAIR) FOIA · Official Agency FOIA Portal ↗