AwardTape / Contracts / N00019-24-F-1082
N00019-24-F-1082: $5.9M Department of the Navy Award to Northrop Grumman Systems Corporation
The purpose of this procurement is to perform the nonrecurring engineering (nre) required to develop and implement the r2b bit.. Contracting activity: NAVAL AIR SYSTEMS COMMAND. Estimated completion: 2027-05-14.
$5.9M contract action / $6.7M cumulative ceiling / Sole-source / 2027-05-14 completion / N00019 NAVAL AIR SYSTEMS COMMAND
1. Contract Summary & Primary Sources
| Contract Number (PIID) | N00019-24-F-1082 (unhyphenated: N0001924F1082) · Parent Vehicle: N00019-20-G-0005 |
|---|---|
| Prime Contractor (Awardee) |
Northrop Grumman Systems Corporation
$NOC
(Illinois)
FY2024-FY2026 Federal Defense Portfolio: $4.7B obligated across 844 contracts
|
| Obligated Amount | $5,948,340 ($5.9M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $6,658,543 |
| USAspending / FPDS Obligation History | Base Record Obligated: $5,948,340 (signed 2024-08-14, latest FPDS action 2025-05-14) · 15 Issued Delivery/Task Order(s) totaling $898,114,278 |
| Awarding Branch / Agency | Department of the Navy |
| Contracting Command & DoDAAC | N00019: NAVAL AIR SYSTEMS COMMAND |
| Competition & Contract Structure | SOLE-SOURCE · Delivery Order / Cost-Plus-Fixed-Fee (CPFF) |
| Product / Service & Industry Codes | PSC 5865 (Electronic Countermeasures, Counter-Countermeasures And Quick Reaction Capability Equipment) · NAICS 336413 (Other Aircraft Parts And Auxiliary Equipment Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Illinois |
| Estimated Completion Date | 2027-05-14 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The purpose of this procurement is to perform the nonrecurring engineering (nre) required to develop and implement the r2b bit.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Northrop Grumman Systems Corporation
- Delivery Runway: Active through 2027-05-14
- Requirement Scope: The purpose of this procurement is to perform the nonrecurring engineering (nre) required to develop and implement the r2b bit.
- Federal Supply Class: PSC 5865 (Electronic Countermeasures, Counter-Countermeasures And Quick Reaction Capability Equipment)
- BD Action: Reference Prime Contract N00019-24-F-1082 when contacting Northrop Grumman Systems Corporation Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: N00019 (NAVAL AIR SYSTEMS COMMAND)
- Acquisition Method: SOLE-SOURCE
- FOIA Jurisdiction: Naval Air Systems Command (NAVAIR) FOIA (Official Portal)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Issued Task & Delivery Orders under N00019-24-F-1082 (15 shown, $898.1M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| N0001923F2625 | $377.1M | Northrop Grumman Systems Corporation | 2023-09-12 / 2026-06-30 | 2030-02-01 | D6 tcid hardware development |
| N0001923F0041 | $137.4M | Northrop Grumman Systems Corporation | 2023-08-23 / 2026-04-15 | 2029-06-15 | The purpose of this delivery order is to retrofit b9, b10, mb6p into the ifc4.2 configuration. |
| N0001921F0064 | $62.8M | Northrop Grumman Systems Corporation | 2021-01-19 / 2026-04-02 | 2027-08-31 | E-2d aerial refueling retrofit kits and installation |
| N0001924F0571 | $48.1M | Northrop Grumman Systems Corporation | 2024-06-20 / 2026-01-06 | 2029-07-31 | Doplt primary effort |
| N0001921F0889 | $42.4M | Northrop Grumman Systems Corporation | 2021-05-14 / 2026-04-21 | 2028-04-30 | Japan e-2c/e-2d cy21 iss & tech support |
| N0001922F2530 | $37.3M | Northrop Grumman Systems Corporation | 2022-05-26 / 2026-06-05 | 2029-12-31 | Long lead parts supporting the dssc4 retrofit kits |
| N0001923F0029 | $29.3M | Northrop Grumman Systems Corporation | 2022-10-11 / 2026-04-02 | 2028-04-30 | Fatigue article test & teardown |
| N0001924F2597 | $28.1M | Northrop Grumman Systems Corporation | 2023-10-31 / 2026-03-19 | 2028-01-31 | Wcs kit installation |
| N0001923F2501 | $25.8M | Northrop Grumman Systems Corporation | 2023-05-02 / 2025-07-16 | 2026-04-30 | Saa srr phase 0c |
| N0001920F5008 | $23.0M | Northrop Grumman Systems Corporation | 2020-07-01 / 2026-03-09 | 2026-03-31 | Integrated test team (itt) support for the e-2d |
| N0001924F0064 | $20.5M | Northrop Grumman Systems Corporation | 2024-04-25 / 2026-05-28 | 2029-04-30 | Hawkeye sustainment |
| N0001922F0910 | $20.2M | Northrop Grumman Systems Corporation | 2022-06-10 / 2026-03-26 | 2028-02-29 | Full scale fatigue test |
| N0001922F2308 | $15.9M | Northrop Grumman Systems Corporation | 2022-03-31 / 2026-06-01 | 2024-06-30 | Non-recurring engineering |
| N0001921F0806 | $15.2M | Northrop Grumman Systems Corporation | 2021-05-26 / 2025-08-04 | 2028-03-20 | Last time buy |
| N0001921F0013 | $15.1M | Northrop Grumman Systems Corporation | 2021-04-15 / 2026-04-16 | 2022-05-31 | An/aar-47 production |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under N00019-24-F-1082 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by Northrop Grumman Systems Corporation across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| L3harris Technologies, Inc. $LHX | $5.0B | 2023-12-07 | N00383-23-F-S531 (Prime Network ($NOC)) | ELECT BOXES/ENCLOSRE |
| Spirit Aerosystems Inc $SPR | $128.0M | 2026-05-14 | FA8650-21-C-1001 (Prime Network ($NOC)) | B-21 Raider Long-Range Strike Bomber LRIP composite fuselage & structural assemblies |
| L3harris Interstate Electronics Corporation $LHX | $102.2M | 2026-02-26 | W15QKN-13-C-0074 (Prime Network ($NOC)) | ENGINEERING SERVICES |
| Lockheed Martin Corporation $LMT | $72.3M | 2026-01-12 | N00383-25-F-S523 (Prime Network ($NOC)) | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| Raytheon Company $RTX | $40.8M | 2024-03-06 | FA8578-23-F-0001 (Prime Network ($NOC)) | SERVICES |
| Mercury Systems Inc $MRCY | $38.6M | 2026-03-21 | W31P4Q-23-C-0044 (Prime Network ($NOC)) | Integrated Battle Command System (IBCS) & AN/TPS-80 G/ATOR radar ruggedized RF conversion & OpenVPX processing blades |
| Raytheon Company $RTX | $30.7M | 2026-01-21 | FA8690-24-C-B001 (Prime Network ($NOC)) | AIRCRAFT MANUFACTURING |
| Ttm Technologies Inc $TTMI | $29.5M | 2026-02-14 | FA8819-24-C-0002 (Prime Network ($NOC)) | SDA Proliferated Warfighter Space Architecture (PWSA) Tranche 2 Transport & Tracking Layer space-qualified RF PCB assemblies |
| Lockheed Martin Corporation $LMT | $28.7M | 2024-09-16 | N00383-24-F-BH00 (Prime Network ($NOC)) | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| Lockheed Martin Corp $LMT | $26.0M | 2025-12-22 | FA8219-20-C-0006 (Prime Network ($NOC)) | TECHNICAL SERVICES |
Recent Contract Actions from Buying Office N00019 (NAVAL AIR SYSTEMS COMMAND)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-27 | N00019-25-F-0120 | Lockheed Martin Corp. | $13.3M | April 2027 | Lockheed Martin Corp., Fort Worth, Texas, is awarded a $13,259,000 cost-plus-fixed-fee, level-of-effort modification (P00006) to a previousl... |
| 2026-10-27 | N00019-27-C-1010 | Lockheed Martin Corp. | $9.8M | October 2030 | Lockheed Martin Corp., Owego, New York, is awarded a $9,755,583 firm-fixed-price and cost-plus-fixed-fee contract for updated AN/ALQ-230 ele... |
| 2026-10-23 | N00019-27-F-1037 | Lockheed Martin Aeronautics Co. | $114.6M | January 2030 | Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $114,629,966 cost-plus-fixed-fee order (N0001927F1037) against a previously... |
| 2026-10-22 | N00019-23-C-0049 | Saab Inc. | $14.3M | June 2028 | Saab Inc., East Syracuse, New York, is awarded a $14,308,164 firm-fixed-price modification (P00026) to a previously awarded contract (N00019... |
| 2026-10-19 | N00019-23-C-0003 | Lockheed Martin Aeronautics Co. | $9.4M | March 2028 | Lockheed Martin Aeronautics Co., Fort Worth, Texas (N0001923C0003), is awarded a $9,376,464 firm-fixed-price modification (P00029) to a prev... |
| 2026-10-16 | N00019-27-D-1006 | Boeing | $80.0M | - | No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not comp... |
| 2026-10-15 | N00019-22-C-0015 | Lockheed Martin Aeronautics | $18.8M | - | The award record on file for N0001922C0015 shows a $118.71M ceiling and $118.71M obligated, as of the last USAspending load. |
| 2026-10-14 | N00019-26-F-2222 | Lockheed Martin | $16.1M | - | The award record on file for N0001924G0010 shows a $2.00M ceiling, as of the last USAspending load. |
Other Recent Department of War Awards to Northrop Grumman Systems Corporation
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-03-17 | N00024-22-C-6418 | Navy | $12.0M | Mar 31, 2029 | Northrop Grumman Aeronautics Systems gets $12.0M modification for safety, logistics, engineering and depot support for airborne laser mine d... |
| 2025-09-17 | N00019-24-F-0571 | Navy | $9.4M | Jul 31, 2029 | Northrup Grumman Systems gets $9.4M modification for to provide continued support to E-2D Advanced Hawkeye transition efforts from productio... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for N00019-24-F-1082
Routed to Naval Air Systems Command (NAVAIR) FOIA · Official Agency FOIA Portal ↗