This project funds needed repairs to the boiler in the central heating plant building 345 at aberdeen proving ground. the boiler requires a new blowdown system and repairs to the deaerator tank.. Contracting activity: W6QK ACC-APG DIR. Estimated completion: 2025-06-30.
$318K cumulative ceiling / COMPETITION NOT STATED / 2025-06-30 completion / W56ZTN W6QK ACC-APG DIR
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W56ZTN-23-F-0143 (unhyphenated: W56ZTN23F0143) · Parent Vehicle: W56ZTN-22-D-0001 |
|---|---|
| Prime Contractor (Awardee) |
Mem Contracting, Inc
(Maryland)
FY2024-FY2026 Federal Defense Portfolio: $25.6M obligated across 54 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $318,474 |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2023-08-11, latest FPDS action 2024-11-05) · 15 Issued Delivery/Task Order(s) totaling $19,199,442 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W56ZTN: W6QK ACC-APG DIR |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Y1JZ (Construction Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Maryland |
| Estimated Completion Date | 2025-06-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
This project funds needed repairs to the boiler in the central heating plant building 345 at aberdeen proving ground. the boiler requires a new blowdown system and repairs to the deaerator tank.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Mem Contracting, Inc
- Delivery Runway: Active through 2025-06-30
- Requirement Scope: This project funds needed repairs to the boiler in the central heating plant building 345 at aberdeen proving ground. the boiler requires a new blowdown system and repairs to the deaerator tank.
- Federal Supply Class: PSC Y1JZ (Construction Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract W56ZTN-23-F-0143 when contacting Mem Contracting, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W56ZTN (W6QK ACC-APG DIR)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W56ZTN-23-F-0143 (15 shown, $19.2M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W56ZTN24F0057 | $2.8M | Mem Contracting, Inc | 2024-04-01 / 2025-06-10 | 2025-08-15 | The purpose of this task order is to provide funding for wr#im0001c3j - building 311 repair water infiltration |
| W56ZTN24F0109 | $2.3M | Mem Contracting, Inc | 2024-06-12 / 2026-02-20 | 2026-09-16 | The purpose of this task order is to provide funding for wr# naf000073j, naf000083j, naf000093j, naf000063j and naf0000a3j - remove/replace playground pip surface. the pop date for this project is 04/11/2025. |
| W56ZTN25FA047 | $2.0M | Mem Contracting, Inc | 2025-08-18 / 2026-05-26 | 2027-02-12 | Renovate the existing cooling and heating system within building 4403. |
| W56ZTN25FA061 | $1.9M | Mem Contracting, Inc | 2025-09-12 / 2025-09-12 | 2026-09-30 | This requirement funds the renovation the existing cooling and heating system within building 2401at aberdeen proving ground, maryland. |
| W56ZTN25FA063 | $1.6M | Mem Contracting, Inc | 2025-09-15 / 2025-09-15 | 2026-10-01 | Upgrade hvac bldg. 112 |
| W56ZTN24F0036 | $1.4M | Mem Contracting, Inc | 2024-02-13 / 2026-02-18 | 2026-05-15 | This task order funds the replacement of 33 fan coil units on the 3rd floor of building 4401 at aberdeen proving ground md, wr# ck000029j-02 |
| W56ZTN25FA036 | $1.2M | Mem Contracting, Inc | 2025-07-30 / 2025-07-30 | 2026-08-19 | The purpose of this project is to remove the existing air-cooled chiller, and two air-handlings units located in two separate roof top penthouses and replace the units with new. |
| W56ZTN23F0086 | $1.0M | Mem Contracting, Inc | 2023-05-31 / 2026-05-20 | 2026-07-15 | Funding to repair water damage at top of the bay, building 30 on aberdeen proving ground, wr# mwb000023j. |
| W56ZTN25FA039 | $871K | Mem Contracting, Inc | 2025-08-12 / 2025-08-12 | 2026-08-24 | This requirement is for the twelfth phase of life-cycle replacement for the replacement or removal of various above ground storage tanks at aberdeen proving ground, maryland. |
| W56ZTN24F0023 | $838K | Mem Contracting, Inc | 2023-12-22 / 2025-01-16 | 2025-07-15 | This task order funds the repair of the chiller at building 4304 at aberdeen proving ground, md. wr# ie000043j |
| W56ZTN25FA053 | $715K | Mem Contracting, Inc | 2025-09-08 / 2026-03-12 | 2026-11-13 | Replace steam/heating water system replacement for building 315 at the intersection of civil rd and gillon st in the aberdeen area of aberdeen proving ground (apg), maryland. |
| W56ZTN25F0084 | $699K | Mem Contracting, Inc | 2025-05-13 / 2025-05-13 | 2025-11-28 | Roof repair for building 6007, aberdeen proving ground. |
| W56ZTN24F0158 | $687K | Mem Contracting, Inc | 2024-08-08 / 2025-04-11 | 2025-11-14 | This project replaces the inside and outside heating, ventilation, and air conditioning systems for building 3074 on aberdeen proving ground. |
| W56ZTN25FA054 | $645K | Mem Contracting, Inc | 2025-09-08 / 2025-09-08 | 2026-09-22 | This requirement funds the replacement of the fire alarm transmitting system at adelphi laboratory center installation. |
| W56ZTN25FA027 | $496K | Mem Contracting, Inc | 2025-07-15 / 2026-01-05 | 2026-07-16 | Repair air handler unit (ahu), air cooled chiller, and centrifugal pumps. |
Recent Contract Actions from Buying Office W56ZTN (W6QK ACC-APG DIR)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-08-05 | W56ZTN-26-D-A010 | - | $16.9M | Mar 1, 2032 | G. A. Mechanical wins $16.9M contract for Unidirectional Hydrant Flushing and Repair Program. Army Contracting Command work through Mar 1, 2... |
| 2026-04-30 | W56ZTN-26-D-A006 | Chimes District of Columbia | $19.5M | Apr 30, 2031 | Chimes District of Columbia wins $19.5M contract for grounds maintenance services for Puerto Rico. Army Contracting Command work through Apr... |
| 2026-03-03 | W56ZTN-26-D-A001 | MAR-LEN Environmental | $16.8M | Aug 31, 2031 | MAR-LEN Environmental wins $16.8M contract for forest resource compliance and forest resource management support services at Aberdeen Provin... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W56ZTN-23-F-0143
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗