W56ZTN-26-F-A052: $306K Department of the Army Award to Mem Contracting, Inc
The scope of this project consists of providing all plant, labor, materials and equipment to perform all work necessary to repair/renovate building 743 to repair the doors, walls and loading dock. this is a design build project. Contracting activity: W6QK ACC-APG DIR. Estimated completion: 2027-02-08.
$306K contract action / $306K cumulative ceiling / COMPETITION NOT STATED / 2027-02-08 completion / W56ZTN W6QK ACC-APG DIR
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W56ZTN-26-F-A052 (unhyphenated: W56ZTN26FA052) · Parent Vehicle: W56ZTN-22-D-0001 |
|---|---|
| Prime Contractor (Awardee) |
Mem Contracting, Inc
(Maryland)
FY2024-FY2026 Federal Defense Portfolio: $25.6M obligated across 54 contracts
|
| Obligated Amount | $306,078 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $306,078 |
| USAspending / FPDS Obligation History | Base Record Obligated: $306,078 (signed 2026-04-29, latest FPDS action 2026-04-29) · 15 Issued Delivery/Task Order(s) totaling $19,199,442 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W56ZTN: W6QK ACC-APG DIR |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Y1JZ (Construction Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Maryland |
| Estimated Completion Date | 2027-02-08 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The scope of this project consists of providing all plant, labor, materials and equipment to perform all work necessary to repair/renovate building 743 to repair the doors, walls and loading dock. this is a design build project
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Mem Contracting, Inc
- Delivery Runway: Active through 2027-02-08
- Requirement Scope: The scope of this project consists of providing all plant, labor, materials and equipment to perform all work necessary to repair/renovate building 743 to repair the doors, walls and loading dock. this is a design build project
- Federal Supply Class: PSC Y1JZ (Construction Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract W56ZTN-26-F-A052 when contacting Mem Contracting, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W56ZTN (W6QK ACC-APG DIR)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W56ZTN-26-F-A052 (15 shown, $19.2M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W56ZTN24F0057 | $2.8M | Mem Contracting, Inc | 2024-04-01 / 2025-06-10 | 2025-08-15 | The purpose of this task order is to provide funding for wr#im0001c3j - building 311 repair water infiltration |
| W56ZTN24F0109 | $2.3M | Mem Contracting, Inc | 2024-06-12 / 2026-02-20 | 2026-09-16 | The purpose of this task order is to provide funding for wr# naf000073j, naf000083j, naf000093j, naf000063j and naf0000a3j - remove/replace playground pip surface. the pop date for this project is 04/11/2025. |
| W56ZTN25FA047 | $2.0M | Mem Contracting, Inc | 2025-08-18 / 2026-05-26 | 2027-02-12 | Renovate the existing cooling and heating system within building 4403. |
| W56ZTN25FA061 | $1.9M | Mem Contracting, Inc | 2025-09-12 / 2025-09-12 | 2026-09-30 | This requirement funds the renovation the existing cooling and heating system within building 2401at aberdeen proving ground, maryland. |
| W56ZTN25FA063 | $1.6M | Mem Contracting, Inc | 2025-09-15 / 2025-09-15 | 2026-10-01 | Upgrade hvac bldg. 112 |
| W56ZTN24F0036 | $1.4M | Mem Contracting, Inc | 2024-02-13 / 2026-02-18 | 2026-05-15 | This task order funds the replacement of 33 fan coil units on the 3rd floor of building 4401 at aberdeen proving ground md, wr# ck000029j-02 |
| W56ZTN25FA036 | $1.2M | Mem Contracting, Inc | 2025-07-30 / 2025-07-30 | 2026-08-19 | The purpose of this project is to remove the existing air-cooled chiller, and two air-handlings units located in two separate roof top penthouses and replace the units with new. |
| W56ZTN23F0086 | $1.0M | Mem Contracting, Inc | 2023-05-31 / 2026-05-20 | 2026-07-15 | Funding to repair water damage at top of the bay, building 30 on aberdeen proving ground, wr# mwb000023j. |
| W56ZTN25FA039 | $871K | Mem Contracting, Inc | 2025-08-12 / 2025-08-12 | 2026-08-24 | This requirement is for the twelfth phase of life-cycle replacement for the replacement or removal of various above ground storage tanks at aberdeen proving ground, maryland. |
| W56ZTN24F0023 | $838K | Mem Contracting, Inc | 2023-12-22 / 2025-01-16 | 2025-07-15 | This task order funds the repair of the chiller at building 4304 at aberdeen proving ground, md. wr# ie000043j |
| W56ZTN25FA053 | $715K | Mem Contracting, Inc | 2025-09-08 / 2026-03-12 | 2026-11-13 | Replace steam/heating water system replacement for building 315 at the intersection of civil rd and gillon st in the aberdeen area of aberdeen proving ground (apg), maryland. |
| W56ZTN25F0084 | $699K | Mem Contracting, Inc | 2025-05-13 / 2025-05-13 | 2025-11-28 | Roof repair for building 6007, aberdeen proving ground. |
| W56ZTN24F0158 | $687K | Mem Contracting, Inc | 2024-08-08 / 2025-04-11 | 2025-11-14 | This project replaces the inside and outside heating, ventilation, and air conditioning systems for building 3074 on aberdeen proving ground. |
| W56ZTN25FA054 | $645K | Mem Contracting, Inc | 2025-09-08 / 2025-09-08 | 2026-09-22 | This requirement funds the replacement of the fire alarm transmitting system at adelphi laboratory center installation. |
| W56ZTN25FA027 | $496K | Mem Contracting, Inc | 2025-07-15 / 2026-01-05 | 2026-07-16 | Repair air handler unit (ahu), air cooled chiller, and centrifugal pumps. |
Recent Contract Actions from Buying Office W56ZTN (W6QK ACC-APG DIR)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-08-05 | W56ZTN-26-D-A010 | - | $16.9M | Mar 1, 2032 | G. A. Mechanical wins $16.9M contract for Unidirectional Hydrant Flushing and Repair Program. Army Contracting Command work through Mar 1, 2... |
| 2026-04-30 | W56ZTN-26-D-A006 | Chimes District of Columbia | $19.5M | Apr 30, 2031 | Chimes District of Columbia wins $19.5M contract for grounds maintenance services for Puerto Rico. Army Contracting Command work through Apr... |
| 2026-03-03 | W56ZTN-26-D-A001 | MAR-LEN Environmental | $16.8M | Aug 31, 2031 | MAR-LEN Environmental wins $16.8M contract for forest resource compliance and forest resource management support services at Aberdeen Provin... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W56ZTN-26-F-A052
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗