AwardTape / Contracts / W912BV-25-F-A016
W912BV-25-F-A016: $706K Department of the Army Award to Citrine-Olsson JV LLC
Design a 3,800 square foot building addition onto existing b541 to support the additional egress requirements for the t-7a aircraft bed-down at vance air force base, ok.. Contracting activity: W076 ENDIST TULSA. Estimated completion: 2026-06-22.
$706K contract action / $768K cumulative ceiling / COMPETITION NOT STATED / 2026-06-22 completion / W912BV W076 ENDIST TULSA
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912BV-25-F-A016 (unhyphenated: W912BV25FA016) · Parent Vehicle: W9126G-23-D-0008 |
|---|---|
| Prime Contractor (Awardee) |
Citrine-Olsson JV LLC
(Colorado)
FY2024-FY2026 Federal Defense Portfolio: $12.1M obligated across 14 contracts
|
| Obligated Amount | $705,724 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $767,848 |
| USAspending / FPDS Obligation History | Base Record Obligated: $705,724 (signed 2025-07-15, latest FPDS action 2026-05-27) · 8 Issued Delivery/Task Order(s) totaling $8,433,567 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912BV: W076 ENDIST TULSA |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC C1BZ (Architect And Engineering- Construction: Other Airfield Structures) · NAICS 541330 (Engineering Services) |
| Work Locations & Funding | Primary Place of Performance: Colorado |
| Estimated Completion Date | 2026-06-22 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Design a 3,800 square foot building addition onto existing b541 to support the additional egress requirements for the t-7a aircraft bed-down at vance air force base, ok.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Citrine-Olsson JV LLC
- Delivery Runway: Active through 2026-06-22
- Requirement Scope: Design a 3,800 square foot building addition onto existing b541 to support the additional egress requirements for the t-7a aircraft bed-down at vance air force base, ok.
- Federal Supply Class: PSC C1BZ (Architect And Engineering- Construction: Other Airfield Structures)
- BD Action: Reference Prime Contract W912BV-25-F-A016 when contacting Citrine-Olsson JV LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912BV (W076 ENDIST TULSA)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912BV-25-F-A016 (8 shown, $8.4M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W9126G25F0186 | $2.7M | Citrine-Olsson JV LLC | 2025-05-13 / 2026-03-06 | 2026-04-09 | A-e support for code 2, parametric design review and design document development for dona ana base camp expansion - transient training barracks |
| W912BV26FA016 | $1.5M | Citrine-Olsson JV LLC | 2025-12-23 / 2025-12-23 | 2026-10-31 | Ae design for the t-7a allied support at vance air force base, ok |
| W9126G24F0425 | $1.4M | Citrine-Olsson JV LLC | 2024-09-30 / 2026-02-23 | 2026-06-22 | Design bid build package bldg 4012 hvac repair jbsa |
| W9126G26FA136 | $1.4M | Citrine-Olsson JV LLC | 2026-04-13 / 2026-04-13 | 2028-03-28 | The attached statement of work sets forth the performance requirements for the architect-engineer services required for complete design of the non-destructive testing facility at red river ARMY depot, texas. |
| W9126G25F0273 | $669K | Citrine-Olsson JV LLC | 2025-09-30 / 2025-09-30 | 2027-09-29 | Ae services for hangar door expansion, fort hood, tx |
| W9126G24F0391 | $441K | Citrine-Olsson JV LLC | 2024-09-26 / 2025-09-16 | 2027-04-14 | Dbb - dlielc hvac repair |
| W9126G24F0359 | $385K | Citrine-Olsson JV LLC | 2024-09-26 / 2025-09-16 | 2025-10-31 | Ae services- b1735 collection storage, fort bliss, texas |
| W9126G23F0390 | -$3K | Citrine-Olsson JV LLC | 2023-09-27 / 2025-08-27 | 2024-09-19 | A-e military min guarantee |
Recent Contract Actions from Buying Office W912BV (W076 ENDIST TULSA)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-23 | W912BV-25-D-0043 | Bristol Design Build Services, LLC | $495.0M | Jul 24, 2030 | Bristol Design Build Services and 4 others share $495.0M order for each order of the $495,000,000 indefinite-delivery/indefinite-quantity. U... |
| 2026-09-22 | W912BV-26-F-A155 | Gideon Contracting | $14.8M | Sep 21, 2028 | Gideon Contracting wins $14.8M contract for a $14,771,477 firm-fixed-price, indefinite-delivery/indefinite-quantity contract to remodel. U.S... |
| 2026-09-17 | W912BV-26-C-A024 | Gideon Contracting | $15.6M | Dec 11, 2027 | Gideon Contracting wins $15.6M contract. Army Corps of Engineers $15.6M obligated now work through Dec 11, 2027 small business. |
| 2026-09-10 | W912BV-26-C-A023 | Harper Construction | $223.6M | Sep 9, 2030 | Harper Construction wins $223.6M contract for a $223,577,265 firm-fixed-price contract to construct a programmed depot maintenance facility.... |
| 2026-08-14 | W912BV-26-C-A021 | McMillen | $19.6M | May 31, 2030 | McMillen wins $19.6M contract for Webbers Falls Tainter Gate Replacement and Repair project. U.S. Army Corps of Engineers $19.6M obligated n... |
| 2026-03-31 | W912BV-26-C-A014 | McMillen | $19.6M | Jan 31, 2030 | McMillen wins $19.6M contract for Webbers Falls Tainter Gate Replacement and Repair project at Webbers Falls Lock. U.S. Army Corps of Engine... |
| 2026-03-23 | W912BV-25-C-0008 | Barnard Construction | $555.6M | Sep 4, 2033 | Barnard Construction wins $555.6M contract. U.S. Army Corps of Engineers $555.6M obligated now work through Sep 4, 2033. |
| 2026-02-11 | W912BV-26-C-A008 | Marine Solutions | $9.3M | Aug 15, 2027 | Marine Solutions wins $9.3M contract for construction of a replacement alignment cell at W.D. Mayo Lock and Dam, Oklahoma. U.S. Army Corps o... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912BV-25-F-A016
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗