FA3030-23-F-0017: $398K Department of the Air Force Award to CMS Corporation

Repair and renovate dorm. Contracting activity: FA3030 17 CONS CC. Estimated completion: 2025-04-30.

$398K contract action / $6.3M cumulative ceiling / COMPETITION NOT STATED / 2025-04-30 completion / FA3030 FA3030 17 CONS CC

1. Contract Summary & Primary Sources

Contract Number (PIID) FA3030-23-F-0017 (unhyphenated: FA303023F0017) · Parent Vehicle: FA8903-17-D-0016
Prime Contractor (Awardee) CMS Corporation (Texas)
FY2024-FY2026 Federal Defense Portfolio: $522.4M obligated across 77 contracts
Obligated Amount $398,415
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $6,251,735
USAspending / FPDS Obligation History Base Record Obligated: $398,415 (signed 2022-12-15, latest FPDS action 2025-01-27) · 15 Issued Delivery/Task Order(s) totaling $90,891,994
Awarding Branch / Agency Department of the Air Force
Contracting Command & DoDAAC FA3030: FA3030 17 CONS CC
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC Y1JZ (Construction Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction)
Work Locations & Funding Primary Place of Performance: Texas
Estimated Completion Date 2025-04-30
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract FA303023F0017)

Repair and renovate dorm

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: CMS Corporation
  • Delivery Runway: Active through 2025-04-30
  • Requirement Scope: Repair and renovate dorm
  • Federal Supply Class: PSC Y1JZ (Construction Of Miscellaneous Buildings)
  • BD Action: Reference Prime Contract FA3030-23-F-0017 when contacting CMS Corporation Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: FA3030 (FA3030 17 CONS CC)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under FA3030-23-F-0017 (15 shown, $90.9M obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
FA890324F0065 $45.5M CMS Corporation 2024-07-18 / 2026-02-11 2026-10-21 The work to be performed will be in accordance with statement of work (sow), dated 7 march 2024, for repair runway 15c/33c and overruns 15r/33l at sheppard afb, texas.
FA303024F0040 $11.6M CMS Corporation 2024-07-23 / 2026-04-20 2026-04-13 Repair of heating, ventilation and air conditioning (hvac) at building 3453.
FA303024F0004 $10.3M CMS Corporation 2023-10-12 / 2026-05-22 2026-02-09 Repair_b401_cyber_network_processing_center
FA890322F0156 $6.7M CMS Corporation 2022-09-28 / 2026-04-29 2027-10-04 Repair fuel tanks at multiple locations cannon afb, nm ellsworth afb, sd
FA301622F0409 $6.2M CMS Corporation 2022-09-19 / 2025-10-20 2025-11-14 Repairing b2000 chiller
FA890322F0158 $4.9M CMS Corporation 2022-09-22 / 2025-12-09 2026-05-13 Repair fuel tanks 273, 331, 965, 998, 3710 & 21090, api 653 repairs of aboveground storage tanks tinker afb
FA254321F0003 $1.9M CMS Corporation 2020-11-09 / 2026-04-23 2026-09-30 Repair by replace power plant controls
FA890323F0114 $1.6M CMS Corporation 2023-08-23 / 2025-09-09 2026-07-03 Request for contracting support to repair tanks at sioux city ang, ia
FA890323F0127 $1.5M CMS Corporation 2023-09-29 / 2026-04-02 2026-10-25 Repair/renovate student dorm building 10656 at jbsa lackland, tx project no: mpls100004
FA890322F0037 $478K CMS Corporation 2022-02-04 / 2025-07-03 2025-11-07 Api 653 repairs to tank 30001 mcconnell afb, ks
FA890322F0117 $336K CMS Corporation 2022-08-22 / 2025-05-14 2025-07-30 Construction and repair of fuel facilities at minot afb
FA805120F0004 $253K CMS Corporation 2020-03-04 / 2024-08-28 2024-10-31 Constructions services - peterson afb advanced meter reading system
FA303023F0019 $95K CMS Corporation 2023-03-09 / 2024-07-19 2026-02-18 Jp8 fire trainer
FA890322F0093 -$86K CMS Corporation 2022-07-13 / 2024-09-20 2024-09-30 Regional engineering and construction contract (re&c) central region repair (sustain) all american landing zone drainage & pavement/construct (r&m) fence at camp robinson little rock afb, ar for project number: nkak071032a
FA890322F0133 -$570K CMS Corporation 2022-09-23 / 2025-04-23 2024-08-30 Construction and repairs of fuel facilities at malmstrom afb, montana
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact CMS Corporation Supply Chain / Small Business Liaison referencing contract FA3030-23-F-0017.

Other Recent Department of War Awards to CMS Corporation

Date Contract (PIID) Branch Amount Completion Scope Summary
2025-09-24 FA8903-24-F-0035 Army $9.4M Dec 22, 2027 CMS wins $9.4M contract for construction of a sanitary sewer system at the Soo Locks Facility. U.S. Army Corps of Engineers work through Dec...

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for FA3030-23-F-0017

Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗

Open Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.