AwardTape / Contracts / FA4497-25-F-0021
FA4497-25-F-0021: $3.2M Department of the Air Force Award to DCM Architecture & Engineering, LLC
The contractor shall provide construction services for b714 in accordance with the sow dated 16 jan 25, by removing the afff system and installing a wet pipe fire suppression system throughout the hangar and associated structure at dover .... Contracting activity: FA4497 436 CONS LGC. Estimated completion: 2027-04-19.
$3.2M contract action / $3.2M cumulative ceiling / COMPETITION NOT STATED / 2027-04-19 completion / FA4497 FA4497 436 CONS LGC
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA4497-25-F-0021 (unhyphenated: FA449725F0021) · Parent Vehicle: FA4497-21-D-0003 |
|---|---|
| Prime Contractor (Awardee) |
DCM Architecture & Engineering, LLC
(Delaware)
FY2024-FY2026 Federal Defense Portfolio: $6.9M obligated across 5 contracts
|
| Obligated Amount | $3,198,234 ($3.2M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $3,198,234 |
| USAspending / FPDS Obligation History | Base Record Obligated: $3,198,234 (signed 2025-07-18, latest FPDS action 2025-07-18) · 3 Issued Delivery/Task Order(s) totaling $3,705,471 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA4497: FA4497 436 CONS LGC |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2EB (Repair Or Alteration Of Maintenance Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Delaware |
| Estimated Completion Date | 2027-04-19 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The contractor shall provide construction services for b714 in accordance with the sow dated 16 jan 25, by removing the afff system and installing a wet pipe fire suppression system throughout the hangar and associated structure at dover ...
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: DCM Architecture & Engineering, LLC
- Delivery Runway: Active through 2027-04-19
- Requirement Scope: The contractor shall provide construction services for b714 in accordance with the sow dated 16 jan 25, by removing the afff system and installing a wet pipe fire suppression system throughout the hangar and associated structure at dover ...
- Federal Supply Class: PSC Z2EB (Repair Or Alteration Of Maintenance Buildings)
- BD Action: Reference Prime Contract FA4497-25-F-0021 when contacting DCM Architecture & Engineering, LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA4497 (FA4497 436 CONS LGC)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA4497-25-F-0021 (3 shown, $3.7M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA449724F0036 | $1.5M | DCM Architecture & Engineering, LLC | 2024-09-19 / 2025-12-23 | 2026-04-23 | The requirement is to replace exterior doors and boilers at building 3100 on dover afb while maintaining its appearance. work includes all labor, materials, equipment, and adherence to relevant codes and standards. |
| FA449724F0024 | $1.1M | DCM Architecture & Engineering, LLC | 2024-07-02 / 2025-09-09 | 2025-10-03 | The contractor shall replace the hvac boilers at hangar 706 in accordance with sow. these boilers serve to heat the water loop for hangar ahus as well as provide hot water for the wash water heat exchanger located in the mechanical room. |
| FA449724F0037 | $1.1M | DCM Architecture & Engineering, LLC | 2024-09-16 / 2026-05-29 | 2026-07-02 | The contractor shall complete all work identified in the statement of work to demolition and renovate the hvac system at building 122. |
Recent Contract Actions from Buying Office FA4497 (FA4497 436 CONS LGC)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-04-30 | FA4497-26-D-0003 | Ameristar Contracting Group, Inc | $25.0M | Apr 27, 2033 | Ameristar Contracting Group and 2 others share $25.0M contract for simplified acquisition base engineering requirements. 436th Contracting S... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA4497-25-F-0021
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗