Command Search (/)DoD & DHS Obligations $1.40T FY24-26Expiring Recompetes 300 $126.8BPalantir Maven 81.6% fill $637.6M / $781.3MAnduril Enterprise $20B IDIQUS Grid Queue 107.8 GW 523 projectsSanctions & UFLPA 432 entitiesContract RecordsUpdated Oct 26, 2026
AwardTape

AwardTape / Contracts / FA4600-26-F-0033

FA4600-26-F-0033: $447K Department of the Air Force Award to Razor Consulting Solutions, Inc

Provide a design-build proposal to remove and replace the low sloped ethylene propylene diene monomer (epdm) roof system at b456 to include all flashing/coping/drip edges, replace all edges and boots around vent stacks and roof mounted .... Contracting activity: FA4600 55 CONS PKP. Estimated completion: 2026-11-23.

$447K contract action / $447K cumulative ceiling / COMPETITION NOT STATED / 2026-11-23 completion / FA4600 FA4600 55 CONS PKP

1. Contract Summary & Primary Sources

Contract Number (PIID) FA4600-26-F-0033 (unhyphenated: FA460026F0033) · Parent Vehicle: FA4600-25-D-0002
Prime Contractor (Awardee) Razor Consulting Solutions, Inc (Nebraska)
FY2024-FY2026 Federal Defense Portfolio: $7.6M obligated across 69 contracts
Obligated Amount $446,993
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $446,993
USAspending / FPDS Obligation History Base Record Obligated: $446,993 (signed 2026-04-20, latest FPDS action 2026-04-20) · 2 Issued Delivery/Task Order(s) totaling $675,505
Awarding Branch / Agency Department of the Air Force
Contracting Command & DoDAAC FA4600: FA4600 55 CONS PKP
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC C1AA (Architect And Engineering- Construction: Office Buildings) · NAICS 236220 (Commercial And Institutional Building Construction)
Work Locations & Funding Primary Place of Performance: Nebraska
Estimated Completion Date 2026-11-23
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract FA460026F0033)

Provide a design-build proposal to remove and replace the low sloped ethylene propylene diene monomer (epdm) roof system at b456 to include all flashing/coping/drip edges, replace all edges and boots around vent stacks and roof mounted ...

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: Razor Consulting Solutions, Inc
  • Delivery Runway: Active through 2026-11-23
  • Requirement Scope: Provide a design-build proposal to remove and replace the low sloped ethylene propylene diene monomer (epdm) roof system at b456 to include all flashing/coping/drip edges, replace all edges and boots around vent stacks and roof mounted ...
  • Federal Supply Class: PSC C1AA (Architect And Engineering- Construction: Office Buildings)
  • BD Action: Reference Prime Contract FA4600-26-F-0033 when contacting Razor Consulting Solutions, Inc Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: FA4600 (FA4600 55 CONS PKP)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under FA4600-26-F-0033 (2 shown, $676K obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
FA460025F0118 $675K Razor Consulting Solutions, Inc 2025-09-26 / 2025-09-26 2026-09-29 This requirement is for the design/build (d/b) of a new river-style ceiling and overhead catwalk in s1.100, b1000, in accordance with the statement of work (sow).
FA460025F0071 $1K Razor Consulting Solutions, Inc 2025-08-08 / 2025-08-08 2025-08-31 This task order is for the initial kickoff/precon meeting for the macc
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Razor Consulting Solutions, Inc Supply Chain / Small Business Liaison referencing contract FA4600-26-F-0033.

Recent Contract Actions from Buying Office FA4600 (FA4600 55 CONS PKP)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-07-22 FA4600-26-F-0050 Spiral Solutions and Technologies $49.1M Aug 5, 2031 Spiral Solutions and Technologies wins $49.1M contract for joint exercise, training, assessment and related support. 55th Contracting Squadr...
2026-03-16 FA4600-26-D-0001 National Strategic Research Institute $0 - Correction to an earlier Air Force award. .
2026-02-13 FA4600-26-D-0001 Nebraska Strategic Research Institute $5.0B - Nebraska Strategic Research Institute wins $5.0B contract for U.S. Strategic Command (USSTRATCOM). 55th Contracting Squadron $1,000 obligate...

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for FA4600-26-F-0033

Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗

Open Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.