AwardTape / Contracts / FA4626-24-F-0086
FA4626-24-F-0086: $628K Department of the Air Force Award to Bry Enterprise, LLC
Work will consist of restoring launch facility (lf) site elevations around support buildings and driving surfaces, cleaning and installing culverts, ditch and driving surface reshaping to ensure proper drainage of surface water from site.. Contracting activity: FA4626 341 CONS LGC. Estimated completion: 2024-12-09.
$628K contract action / $628K cumulative ceiling / COMPETITION NOT STATED / 2024-12-09 completion / FA4626 FA4626 341 CONS LGC
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA4626-24-F-0086 (unhyphenated: FA462624F0086) · Parent Vehicle: FA4626-24-D-0004 |
|---|---|
| Prime Contractor (Awardee) |
Bry Enterprise, LLC
(Montana)
FY2024-FY2026 Federal Defense Portfolio: $5.7M obligated across 9 contracts
|
| Obligated Amount | $627,684 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $627,684 |
| USAspending / FPDS Obligation History | Base Record Obligated: $627,684 (signed 2024-09-16, latest FPDS action 2024-09-16) · 4 Issued Delivery/Task Order(s) totaling $4,980,087 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA4626: FA4626 341 CONS LGC |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2BF (Repair Or Alteration Of Missile System Facilities) · NAICS 238910 (Site Preparation Contractors) |
| Work Locations & Funding | Primary Place of Performance: Montana |
| Estimated Completion Date | 2024-12-09 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Work will consist of restoring launch facility (lf) site elevations around support buildings and driving surfaces, cleaning and installing culverts, ditch and driving surface reshaping to ensure proper drainage of surface water from site.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Bry Enterprise, LLC
- Delivery Runway: Active through 2024-12-09
- Requirement Scope: Work will consist of restoring launch facility (lf) site elevations around support buildings and driving surfaces, cleaning and installing culverts, ditch and driving surface reshaping to ensure proper drainage of surface water from site.
- Federal Supply Class: PSC Z2BF (Repair Or Alteration Of Missile System Facilities)
- BD Action: Reference Prime Contract FA4626-24-F-0086 when contacting Bry Enterprise, LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA4626 (FA4626 341 CONS LGC)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA4626-24-F-0086 (4 shown, $5.0M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA462626F0011 | $1.8M | Bry Enterprise, LLC | 2025-12-22 / 2025-12-22 | 2026-11-11 | Work will consist of restoring launch facility (lf) site elevations around support buildings and driving surfaces, cleaning and installing culverts, ditch and driving surface reshaping to ensure proper drainage of surface water from site. |
| FA462625F0018 | $1.7M | Bry Enterprise, LLC | 2025-02-07 / 2025-02-07 | 2025-11-11 | Work will consist of restoring launch facility (lf) site elevations around support buildings and driving surfaces, cleaning and installing culverts, ditch and driving surface reshaping to ensure proper drainage of surface water from site. |
| FA462624F0049 | $1.0M | Bry Enterprise, LLC | 2024-05-09 / 2024-10-25 | 2024-12-31 | Work will consist of restoring launch facility (lf) site elevations around support buildings and driving surfaces, cleaning and installing culverts, ditch and driving surface reshaping to ensure proper drainage of surface water from site. |
| FA462624F0027 | $495K | Bry Enterprise, LLC | 2024-01-31 / 2024-07-11 | 2024-11-15 | Maintenance and repair of launch facility driving surfaces, culvert replacement, and flood mitigation throughout malmstrom air force base missile complex. |
Recent Contract Actions from Buying Office FA4626 (FA4626 341 CONS LGC)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-25 | FA4626-26-D-0011 | Copper Creek, LLC | $25.0M | Sep 29, 2033 | Copper Creek and 6 others share $25.0M contract for horizontal construction services. 341st Contracting Squadron $500 obligated now work thr... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA4626-24-F-0086
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗