FA4686-25-F-0028: $634K Department of the Air Force Award to North Star Construction & Engineering Inc

Construction: upgrade fire pump controllers at b11600, design and construction of a new fire alarm system and fire pump controllers. project also includes installation of a ductless split system air conditioner with programmable thermostat.. Contracting activity: FA4686 9 CONS PK. Estimated completion: 2026-10-31.

$634K contract action / $634K cumulative ceiling / COMPETITION NOT STATED / 2026-10-31 completion / FA4686 FA4686 9 CONS PK

1. Contract Summary & Primary Sources

Contract Number (PIID) FA4686-25-F-0028 (unhyphenated: FA468625F0028) · Parent Vehicle: FA4686-25-D-0007
Prime Contractor (Awardee) North Star Construction & Engineering Inc (California)
FY2024-FY2026 Federal Defense Portfolio: $11.4M obligated across 21 contracts
Obligated Amount $634,394
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $634,394
USAspending / FPDS Obligation History Base Record Obligated: $634,394 (signed 2025-04-23, latest FPDS action 2025-04-23) · 7 Issued Delivery/Task Order(s) totaling $6,405,532
Awarding Branch / Agency Department of the Air Force
Contracting Command & DoDAAC FA4686: FA4686 9 CONS PK
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC Z2NE (Repair Or Alteration Of Water Supply Facilities) · NAICS 236220 (Commercial And Institutional Building Construction)
Work Locations & Funding Primary Place of Performance: California
Estimated Completion Date 2026-10-31
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract FA468625F0028)

Construction: upgrade fire pump controllers at b11600, design and construction of a new fire alarm system and fire pump controllers. project also includes installation of a ductless split system air conditioner with programmable thermostat.

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: North Star Construction & Engineering Inc
  • Delivery Runway: Active through 2026-10-31
  • Requirement Scope: Construction: upgrade fire pump controllers at b11600, design and construction of a new fire alarm system and fire pump controllers. project also includes installation of a ductless split system air conditioner with programmable thermostat.
  • Federal Supply Class: PSC Z2NE (Repair Or Alteration Of Water Supply Facilities)
  • BD Action: Reference Prime Contract FA4686-25-F-0028 when contacting North Star Construction & Engineering Inc Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: FA4686 (FA4686 9 CONS PK)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under FA4686-25-F-0028 (7 shown, $6.4M obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
FA468625F0034 $3.4M North Star Construction & Engineering Inc 2025-05-14 / 2025-09-23 2026-11-30 Construction: repair primary clarifier at the waste water treatment plant in accordance with statement of work and design.
FA468625F0046 $1.2M North Star Construction & Engineering Inc 2025-07-09 / 2025-07-09 2026-07-20 Construction: rehabilitation of the sodium hypo-chlorite generation system as described in specification 01 11 00, paragraph 1.2.1.8 and shown within the contract documents attached to this solicitation.
FA468626FA010 $628K North Star Construction & Engineering Inc 2026-04-28 / 2026-04-28 2026-12-24 10 inch water main
FA468625F0051 $356K North Star Construction & Engineering Inc 2025-07-21 / 2025-07-21 2026-03-31 Construction gc matoc task order. the requirement is for the removal and replacement of eleven (11) evaporative coolers, and the replacement of all ceiling fluorescent style lights with led for building 1023.
FA468625F0031 $338K North Star Construction & Engineering Inc 2025-05-01 / 2025-05-01 2026-02-19 Construction: remove and replace existing hvac unit as well as corresponding electrical panel, fire smoke detectors, and roof installation, in accordance with the statement of need dated 17 mar 2025.
FA468625F0054 $306K North Star Construction & Engineering Inc 2025-09-18 / 2026-02-27 2026-04-10 Removal and disposal of existing 2ea. exterior evaporative coolers, followed by installation of new trane 20ton package unit, in accordance with the attached statement of work, 240029 - sow - b5768 evap cooler replacement.
FA468626FA006 $129K North Star Construction & Engineering Inc 2026-04-15 / 2026-04-15 2026-06-22 This project is located on beale air force base, ca, at various locations in the housing area. contractors shall perform all work involved to reduce inflow and infiltration into the sewer collection system.
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact North Star Construction & Engineering Inc Supply Chain / Small Business Liaison referencing contract FA4686-25-F-0028.

Recent Contract Actions from Buying Office FA4686 (FA4686 9 CONS PK)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-09-08 FA4686-26-A-P001 Singularity Security Group $25.0M Sep 30, 2031 Singularity Security Group wins $25.0M contract for site security management and construction surveillance technician services. 9th Contract...

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for FA4686-25-F-0028

Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗

Open Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.