AwardTape / Contracts / FA4686-25-F-0046
FA4686-25-F-0046: $1.2M Department of the Air Force Award to North Star Construction & Engineering Inc
Construction: rehabilitation of the sodium hypo-chlorite generation system as described in specification 01 11 00, paragraph 1.2.1.8 and shown within the contract documents attached to this solicitation.. Contracting activity: FA4686 9 CONS PK. Estimated completion: 2026-07-20.
$1.2M contract action / $1.2M cumulative ceiling / COMPETITION NOT STATED / 2026-07-20 completion / FA4686 FA4686 9 CONS PK
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA4686-25-F-0046 (unhyphenated: FA468625F0046) · Parent Vehicle: FA4686-25-D-0007 |
|---|---|
| Prime Contractor (Awardee) |
North Star Construction & Engineering Inc
(California)
FY2024-FY2026 Federal Defense Portfolio: $11.4M obligated across 21 contracts
|
| Obligated Amount | $1,220,348 ($1.2M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $1,220,348 |
| USAspending / FPDS Obligation History | Base Record Obligated: $1,220,348 (signed 2025-07-09, latest FPDS action 2025-07-09) · 7 Issued Delivery/Task Order(s) totaling $5,819,578 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA4686: FA4686 9 CONS PK |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2PD (Repair Or Alteration Of Waste Treatment And Storage Facilities) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: California |
| Estimated Completion Date | 2026-07-20 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Construction: rehabilitation of the sodium hypo-chlorite generation system as described in specification 01 11 00, paragraph 1.2.1.8 and shown within the contract documents attached to this solicitation.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: North Star Construction & Engineering Inc
- Delivery Runway: Active through 2026-07-20
- Requirement Scope: Construction: rehabilitation of the sodium hypo-chlorite generation system as described in specification 01 11 00, paragraph 1.2.1.8 and shown within the contract documents attached to this solicitation.
- Federal Supply Class: PSC Z2PD (Repair Or Alteration Of Waste Treatment And Storage Facilities)
- BD Action: Reference Prime Contract FA4686-25-F-0046 when contacting North Star Construction & Engineering Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA4686 (FA4686 9 CONS PK)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA4686-25-F-0046 (7 shown, $5.8M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA468625F0034 | $3.4M | North Star Construction & Engineering Inc | 2025-05-14 / 2025-09-23 | 2026-11-30 | Construction: repair primary clarifier at the waste water treatment plant in accordance with statement of work and design. |
| FA468625F0028 | $634K | North Star Construction & Engineering Inc | 2025-04-23 / 2025-04-23 | 2026-10-31 | Construction: upgrade fire pump controllers at b11600, design and construction of a new fire alarm system and fire pump controllers. project also includes installation of a ductless split system air conditioner with programmable thermostat. |
| FA468626FA010 | $628K | North Star Construction & Engineering Inc | 2026-04-28 / 2026-04-28 | 2026-12-24 | 10 inch water main |
| FA468625F0051 | $356K | North Star Construction & Engineering Inc | 2025-07-21 / 2025-07-21 | 2026-03-31 | Construction gc matoc task order. the requirement is for the removal and replacement of eleven (11) evaporative coolers, and the replacement of all ceiling fluorescent style lights with led for building 1023. |
| FA468625F0031 | $338K | North Star Construction & Engineering Inc | 2025-05-01 / 2025-05-01 | 2026-02-19 | Construction: remove and replace existing hvac unit as well as corresponding electrical panel, fire smoke detectors, and roof installation, in accordance with the statement of need dated 17 mar 2025. |
| FA468625F0054 | $306K | North Star Construction & Engineering Inc | 2025-09-18 / 2026-02-27 | 2026-04-10 | Removal and disposal of existing 2ea. exterior evaporative coolers, followed by installation of new trane 20ton package unit, in accordance with the attached statement of work, 240029 - sow - b5768 evap cooler replacement. |
| FA468626FA006 | $129K | North Star Construction & Engineering Inc | 2026-04-15 / 2026-04-15 | 2026-06-22 | This project is located on beale air force base, ca, at various locations in the housing area. contractors shall perform all work involved to reduce inflow and infiltration into the sewer collection system. |
Recent Contract Actions from Buying Office FA4686 (FA4686 9 CONS PK)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-08 | FA4686-26-A-P001 | Singularity Security Group | $25.0M | Sep 30, 2031 | Singularity Security Group wins $25.0M contract for site security management and construction surveillance technician services. 9th Contract... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA4686-25-F-0046
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗