AwardTape / Contracts / FA8638-22-F-0010
FA8638-22-F-0010: Department of the Air Force Award to Northrop Grumman Systems Corporation
Large aircraft infrared countermeasures acquisition sustainment engineering requirement cross functional (laircm) (laser x) cy22 interim contractor support (ics). Contracting activity: FA8638 AFLCMC HBKD. Estimated completion: 2024-09-30.
$1.6M cumulative ceiling / Sole-source / 2024-09-30 completion / FA8638 FA8638 AFLCMC HBKD
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA8638-22-F-0010 (unhyphenated: FA863822F0010) · Parent Vehicle: FA8638-19-D-0001 |
|---|---|
| Prime Contractor (Awardee) |
Northrop Grumman Systems Corporation
$NOC
(Illinois)
FY2024-FY2026 Federal Defense Portfolio: $2.7B obligated across 412 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $1,564,951 |
| USAspending / FPDS Obligation History | Base Record Obligated: -$2,171,903 (signed 2023-01-13, latest FPDS action 2025-05-29) · 15 Issued Delivery/Task Order(s) totaling $528,114,697 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA8638: FA8638 AFLCMC HBKD |
| Competition & Contract Structure | SOLE-SOURCE · Delivery Order / Cost-Plus-Fixed-Fee (CPFF) |
| Product / Service & Industry Codes | PSC J059 (Maint/Repair/Rebuild Of Equipment- Electrical And Electronic Equipment Components) · NAICS 334419 (Other Electronic Component Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Illinois |
| Estimated Completion Date | 2024-09-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Large aircraft infrared countermeasures acquisition sustainment engineering requirement cross functional (laircm) (laser x) cy22 interim contractor support (ics)
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Northrop Grumman Systems Corporation
- Delivery Runway: Active through 2024-09-30
- Requirement Scope: Large aircraft infrared countermeasures acquisition sustainment engineering requirement cross functional (laircm) (laser x) cy22 interim contractor support (ics)
- Federal Supply Class: PSC J059 (Maint/Repair/Rebuild Of Equipment- Electrical And Electronic Equipment Components)
- BD Action: Reference Prime Contract FA8638-22-F-0010 when contacting Northrop Grumman Systems Corporation Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA8638 (FA8638 AFLCMC HBKD)
- Acquisition Method: SOLE-SOURCE
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Issued Task & Delivery Orders under FA8638-22-F-0010 (15 shown, $528.1M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA863824FB005 | $146.1M | Northrop Grumman Systems Corporation | 2024-08-19 / 2026-03-04 | 2027-09-30 | Large aircraft infrared countermeasures acquisition sustainment and engineering requirements cross functional |
| FA863826FB004 | $126.7M | Northrop Grumman Systems Corporation | 2026-05-07 / 2026-06-08 | 2029-02-28 | Cy26 hardware base by order (hbbo) |
| FA863825FB007 | $112.4M | Northrop Grumman Systems Corporation | 2025-05-14 / 2026-06-04 | 2027-06-30 | The purpose of this delivery order is to incorporate the cy25 laircm hardware base-buy delivery order and related funds obligation. |
| FA863824F0012 | $52.1M | Northrop Grumman Systems Corporation | 2024-06-05 / 2026-04-14 | 2027-10-06 | Large aircraft infrared countermeasures acquisition systems engineering requirement cross functional (laser x) cy24-26 software sustainment |
| FA863824F0011 | $26.1M | Northrop Grumman Systems Corporation | 2023-12-26 / 2026-03-20 | 2026-12-31 | Large aircraft infrared countermeasures acquisition sustainment engineering requirements cross functional |
| FA863825FB001 | $22.1M | Northrop Grumman Systems Corporation | 2025-01-24 / 2026-05-14 | 2028-01-31 | Large aircraft infrared countermeasures acquisition sustainment engineering requirements cross functional - automated test environment |
| FA863824F0016 | $16.3M | Northrop Grumman Systems Corporation | 2024-01-10 / 2025-12-12 | 2026-03-31 | Kc-135 large aircraft infrared countermeasures generation 3 pods |
| FA863824F0010 | $7.4M | Northrop Grumman Systems Corporation | 2024-01-10 / 2026-04-08 | 2026-08-31 | Cy24 interim contractor support (ics) |
| FA863824FB007 | $6.6M | Northrop Grumman Systems Corporation | 2024-09-05 / 2026-05-14 | 2026-07-31 | Development and testing of lspr 1.6.5 software for multiple fms countries |
| FA863825FB004 | $5.3M | Northrop Grumman Systems Corporation | 2025-04-30 / 2026-04-08 | 2027-05-03 | Large aircraft infrared countermeasures acquisition sustainment engineering requirements cross functional - scene generation, hfi/lw study, and tracker update |
| FA863824FB006 | $2.3M | Northrop Grumman Systems Corporation | 2024-08-27 / 2025-07-23 | 2026-09-30 | Twenty-five (25) months of field service representative (fsr) support for the korea mrtt laircm system. |
| FA863824FB009 | $2.1M | Northrop Grumman Systems Corporation | 2024-08-01 / 2024-08-01 | 2024-11-30 | Cy24-26 proposal preparation |
| FA863822F0020 | $1.0M | Northrop Grumman Systems Corporation | 2023-08-31 / 2024-06-24 | 2025-08-31 | Large aircraft infared countermeasures acquisition sustainment engineering requirements cross functional |
| FA863823F0026 | $950K | Northrop Grumman Systems Corporation | 2023-04-21 / 2026-03-18 | 2025-09-30 | Large aircraft infrared countermeasures acquisition sustainment engineering requirements cross functional |
| FA863824FB008 | $799K | Northrop Grumman Systems Corporation | 2024-08-05 / 2025-07-16 | 2025-05-31 | Ten (10) months of field service representative (fsr) support for the japan KC-46 laircm system. |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under FA8638-22-F-0010 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by Northrop Grumman Systems Corporation across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| L3harris Technologies, Inc. $LHX | $5.0B | 2023-12-07 | N00383-23-F-S531 (Prime Network ($NOC)) | ELECT BOXES/ENCLOSRE |
| Spirit Aerosystems Inc $SPR | $128.0M | 2026-05-14 | FA8650-21-C-1001 (Prime Network ($NOC)) | B-21 Raider Long-Range Strike Bomber LRIP composite fuselage & structural assemblies |
| L3harris Interstate Electronics Corporation $LHX | $102.2M | 2026-02-26 | W15QKN-13-C-0074 (Prime Network ($NOC)) | ENGINEERING SERVICES |
| Lockheed Martin Corporation $LMT | $72.3M | 2026-01-12 | N00383-25-F-S523 (Prime Network ($NOC)) | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| Raytheon Company $RTX | $40.8M | 2024-03-06 | FA8578-23-F-0001 (Prime Network ($NOC)) | SERVICES |
| Mercury Systems Inc $MRCY | $38.6M | 2026-03-21 | W31P4Q-23-C-0044 (Prime Network ($NOC)) | Integrated Battle Command System (IBCS) & AN/TPS-80 G/ATOR radar ruggedized RF conversion & OpenVPX processing blades |
| Raytheon Company $RTX | $30.7M | 2026-01-21 | FA8690-24-C-B001 (Prime Network ($NOC)) | AIRCRAFT MANUFACTURING |
| Ttm Technologies Inc $TTMI | $29.5M | 2026-02-14 | FA8819-24-C-0002 (Prime Network ($NOC)) | SDA Proliferated Warfighter Space Architecture (PWSA) Tranche 2 Transport & Tracking Layer space-qualified RF PCB assemblies |
| Lockheed Martin Corporation $LMT | $28.7M | 2024-09-16 | N00383-24-F-BH00 (Prime Network ($NOC)) | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING |
| Lockheed Martin Corp $LMT | $26.0M | 2025-12-22 | FA8219-20-C-0006 (Prime Network ($NOC)) | TECHNICAL SERVICES |
Recent Contract Actions from Buying Office FA8638 (FA8638 AFLCMC HBKD)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-07-09 | FA8638-26-F-B001 | Northrop Grumman Systems | $60.4M | Apr 30, 2029 | Northrop Grumman Systems wins $60.4M contract for Large Aircraft Infrared Countermeasures (LAIRCM) Optical Detection and Identification Node... |
Other Recent Department of War Awards to Northrop Grumman Systems Corporation
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-08-13 | W58RGZ-26-C-0009 | Army | $158.8M | Aug 13, 2026 | Northrop Grumman gets $158.8M modification for definitization of the contract. Army Contracting Command $158.8M obligated now work through A... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA8638-22-F-0010
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗