AwardTape / Contracts / N00019-21-F-0030
N00019-21-F-0030: $42.8M Department of the Navy Award to Bell Boeing Joint Project Office
V-22 nacelle improvements step 2. Contracting activity: NAVAL AIR SYSTEMS COMMAND. Estimated completion: 2027-06-30.
$42.8M contract action / $348.4M cumulative ceiling / Sole-source / 2027-06-30 completion / N00019 NAVAL AIR SYSTEMS COMMAND
1. Contract Summary & Primary Sources
| Contract Number (PIID) | N00019-21-F-0030 (unhyphenated: N0001921F0030) · Parent Vehicle: N00019-17-G-0002 |
|---|---|
| Prime Contractor (Awardee) |
Bell Boeing Joint Project Office
$BA $TXT
(Texas)
FY2024-FY2026 Federal Defense Portfolio: $3.6B obligated across 4,769 contracts
|
| Obligated Amount | $42,778,034 ($42.8M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $348,403,442 |
| USAspending / FPDS Obligation History | Base Record Obligated: $42,778,034 (signed 2020-12-31, latest FPDS action 2026-04-29) · 15 Issued Delivery/Task Order(s) totaling $198,876,882 |
| Awarding Branch / Agency | Department of the Navy |
| Contracting Command & DoDAAC | N00019: NAVAL AIR SYSTEMS COMMAND |
| Competition & Contract Structure | SOLE-SOURCE · Delivery Order / Fixed-Price-Incentive (FPI) |
| Product / Service & Industry Codes | PSC 1560 (Airframe Structural Components) · NAICS 336413 (Other Aircraft Parts And Auxiliary Equipment Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Texas |
| Estimated Completion Date | 2027-06-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
V-22 nacelle improvements step 2
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Bell Boeing Joint Project Office
- Delivery Runway: Active through 2027-06-30
- Requirement Scope: V-22 nacelle improvements step 2
- Federal Supply Class: PSC 1560 (Airframe Structural Components)
- BD Action: Reference Prime Contract N00019-21-F-0030 when contacting Bell Boeing Joint Project Office Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: N00019 (NAVAL AIR SYSTEMS COMMAND)
- Acquisition Method: SOLE-SOURCE
- FOIA Jurisdiction: Naval Air Systems Command (NAVAIR) FOIA (Official Portal)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Issued Task & Delivery Orders under N00019-21-F-0030 (15 shown, $198.9M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| N0001921F0327 | $128.7M | Bell Boeing Joint Project Office | 2021-09-30 / 2026-04-30 | 2028-07-07 | Non-recurring engineering (nre)for v-22 flight control system. |
| N0001921F0008 | $41.8M | Bell Boeing Joint Project Office | 2022-03-15 / 2026-03-25 | 2026-03-31 | V-22 flight test support |
| N0001921F0099 | $10.1M | Bell Boeing Joint Project Office | 2021-05-07 / 2025-12-05 | 2027-11-28 | The purpose of this delivery order is to order the long-lead tcas processor. |
| N6134020F7002 | $4.4M | Bell Boeing Joint Project Office | 2020-09-30 / 2024-04-26 | 2025-05-31 | Mv block c system changes |
| N0001921F0049 | $4.1M | Bell Boeing Joint Project Office | 2021-06-09 / 2025-12-11 | 2027-11-30 | Cockpit voice recorder (cvr) cv-22 eight (8) installations |
| N0001921F0090 | $2.6M | Bell Boeing Joint Project Office | 2021-02-05 / 2026-03-18 | 2026-03-31 | V-22 conversion area harness (cah) step 2 fms nre, base and supplemental kits-retrofit, and interim spares |
| N0001921F0057 | $1.8M | Bell Boeing Joint Project Office | 2021-09-30 / 2026-04-09 | 2026-06-30 | Cdu keyboard unit obs redesign nre |
| N0001917F1010 | $1.4M | Bell Boeing Joint Project Office | 2017-07-19 / 2026-04-16 | 2026-05-31 | Incorporate non-recurring engineering within phase i of the prgb formsprag clutch improvement effort. |
| N0001921F0163 | $982K | Bell Boeing Joint Project Office | 2021-08-12 / 2026-05-27 | 2027-10-30 | Fms funding in support of clin 0001 |
| N6134020F7000 | $851K | Bell Boeing Joint Project Office | 2019-11-22 / 2023-12-07 | 2025-03-17 | Cmv-22b device 2f247-1 |
| N0001921F0805 | $800K | Bell Boeing Joint Project Office | 2021-09-30 / 2026-04-27 | 2027-11-30 | Nre for gps m-code integration follow on |
| N0001922F0932 | $346K | Bell Boeing Joint Project Office | 2021-12-21 / 2026-01-22 | 2026-04-30 | Cv-22 hf blos retrofit a-kits |
| N0001919F2415 | $308K | Bell Boeing Joint Project Office | 2018-12-19 / 2026-02-04 | 2024-06-30 | Fms acbt ecp 957r2 retrofit kits/installs |
| N0001918F0034 | $285K | Bell Boeing Joint Project Office | 2017-11-08 / 2026-03-17 | 2025-06-30 | Cv-22 rudder reliability installs and kits |
| N0001920F0549 | $255K | Bell Boeing Joint Project Office | 2020-03-27 / 2024-07-22 | 2024-07-31 | Non-recurring engineering |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under N00019-21-F-0030 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by Bell Boeing Joint Project Office across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| Northrop Grumman Systems Corporation $NOC | $246.9M | 2025-02-10 | N00019-18-C-1046 (Prime Network ($BA)) | MAJOR STRUCTURES |
| Northrop Grumman Systems Corporation $NOC | $145.6M | 2024-12-13 | N00019-18-C-1046 (Prime Network ($BA)) | MAJOR STRUCTURES |
| Spirit Aerosystems Inc $SPR | $96.5M | 2026-04-22 | FA8625-20-C-6500 (Prime Network ($BA)) | KC-46A Pegasus Lot 10/11 forward fuselage, engine nacelles, and wing leading-edge structural assemblies |
| Raytheon Company $RTX | $85.3M | 2025-10-29 | N00019-22-F-0030 (Prime Network ($BA)) | SYSTEMS |
| Northrop Grumman Systems Corporation $NOC | $67.4M | 2024-08-20 | N00019-22-F-0030 (Prime Network ($BA)) | PROPULSION |
| Raytheon Company $RTX | $63.0M | 2024-02-02 | N00019-18-C-1046 (Prime Network ($BA)) | SYSTEMS |
| Raytheon Company $RTX | $60.0M | 2024-05-24 | N00019-19-C-0016 (Prime Network ($BA)) | SYSTEMS |
| Mercury Systems Inc $MRCY | $50.7M | 2024-06-28 | FA8625-11-C-6600 (Prime Network ($BA)) | NON PRODUCTION |
| Woodward Inc $WWD | $44.1M | 2026-05-09 | FA8634-24-C-0003 (Prime Network ($BA)) | JDAM (Joint Direct Attack Munition) & Small Diameter Bomb (SDB I) precision tailkit fin actuation & fuel metering controls |
| Lockheed Martin Corporation $LMT | $42.7M | 2024-03-15 | N68335-24-F-0122 (Prime Network ($BA)) | SYSTEMS |
Recent Contract Actions from Buying Office N00019 (NAVAL AIR SYSTEMS COMMAND)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-27 | N00019-25-F-0120 | Lockheed Martin Corp. | $13.3M | April 2027 | Lockheed Martin Corp., Fort Worth, Texas, is awarded a $13,259,000 cost-plus-fixed-fee, level-of-effort modification (P00006) to a previousl... |
| 2026-10-27 | N00019-27-C-1010 | Lockheed Martin Corp. | $9.8M | October 2030 | Lockheed Martin Corp., Owego, New York, is awarded a $9,755,583 firm-fixed-price and cost-plus-fixed-fee contract for updated AN/ALQ-230 ele... |
| 2026-10-23 | N00019-27-F-1037 | Lockheed Martin Aeronautics Co. | $114.6M | January 2030 | Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $114,629,966 cost-plus-fixed-fee order (N0001927F1037) against a previously... |
| 2026-10-22 | N00019-23-C-0049 | Saab Inc. | $14.3M | June 2028 | Saab Inc., East Syracuse, New York, is awarded a $14,308,164 firm-fixed-price modification (P00026) to a previously awarded contract (N00019... |
| 2026-10-19 | N00019-23-C-0003 | Lockheed Martin Aeronautics Co. | $9.4M | March 2028 | Lockheed Martin Aeronautics Co., Fort Worth, Texas (N0001923C0003), is awarded a $9,376,464 firm-fixed-price modification (P00029) to a prev... |
| 2026-10-16 | N00019-27-D-1006 | Boeing | $80.0M | - | No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not comp... |
| 2026-10-15 | N00019-22-C-0015 | Lockheed Martin Aeronautics | $18.8M | - | The award record on file for N0001922C0015 shows a $118.71M ceiling and $118.71M obligated, as of the last USAspending load. |
| 2026-10-14 | N00019-26-F-2222 | Lockheed Martin | $16.1M | - | The award record on file for N0001924G0010 shows a $2.00M ceiling, as of the last USAspending load. |
Other Recent Department of War Awards to Bell Boeing Joint Project Office
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-25 | N00019-22-G-0002 | Navy | $19.6M | - | Bell Boeing Joint Project Office wins $19.6M order. Naval Air Systems Command $887K obligated now. |
| 2026-09-21 | N00019-22-G-0002 | Navy | $29.7M | - | Bell Boeing Joint Project Office wins $29.7M order for loads and dynamics model data for all V-22 variants prior. Naval Air Systems Command ... |
| 2026-09-18 | N00019-22-G-0002 | Navy | $19.8M | - | Bell Boeing Joint Project Office gets $19.8M modification for engineering, management, technical, and acquisition support. Naval Air Systems... |
| 2026-09-14 | N00019-25-F-0103 | Navy | $35.5M | Dec 19, 2026 | Bell Boeing Joint Project Office gets $35.5M modification for 73 gearbox vibration monitoring and Osprey Drive System Safety. Naval Air Syst... |
| 2026-08-04 | N00383-26-F-0001 | Navy | $82.0M | Nov 25, 2026 | Rockwell Collins wins $82.0M contract for logistics, repair and spare support for the AN/ARC-210(V) radio system -. Naval Supply Systems Com... |
| 2026-07-31 | N00019-26-F-0141 | Navy | $35.8M | Dec 31, 2028 | Bell Boeing Joint Project Office gets $35.8M modification for a not-to-exceed $35,795,938 modification (P00001) to a previously awarded firm... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for N00019-21-F-0030
Routed to Naval Air Systems Command (NAVAIR) FOIA · Official Agency FOIA Portal ↗