AwardTape / Contracts / N00019-24-F-0602
N00019-24-F-0602: $6.4M Department of the Navy Award to Raytheon Company
Nre for production cut-in. Contracting activity: NAVAL AIR SYSTEMS COMMAND. Estimated completion: 2026-07-16.
$6.4M contract action / $6.4M cumulative ceiling / Sole-source / 2026-07-16 completion / N00019 NAVAL AIR SYSTEMS COMMAND
1. Contract Summary & Primary Sources
| Contract Number (PIID) | N00019-24-F-0602 (unhyphenated: N0001924F0602) · Parent Vehicle: N00019-20-G-0007 |
|---|---|
| Prime Contractor (Awardee) |
Raytheon Company
$RTX
(California)
FY2024-FY2026 Federal Defense Portfolio: $3.0B obligated across 417 contracts
|
| Obligated Amount | $6,437,732 ($6.4M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $6,437,732 |
| USAspending / FPDS Obligation History | Base Record Obligated: $6,437,732 (signed 2024-09-16, latest FPDS action 2025-09-04) · 15 Issued Delivery/Task Order(s) totaling $454,206,002 |
| Awarding Branch / Agency | Department of the Navy |
| Contracting Command & DoDAAC | N00019: NAVAL AIR SYSTEMS COMMAND |
| Competition & Contract Structure | SOLE-SOURCE · Delivery Order / Cost-Plus-Fixed-Fee (CPFF) |
| Product / Service & Industry Codes | PSC 5841 (Radar Equipment, Airborne) · NAICS 336413 (Other Aircraft Parts And Auxiliary Equipment Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: California |
| Estimated Completion Date | 2026-07-16 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Nre for production cut-in
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Raytheon Company
- Delivery Runway: Active through 2026-07-16
- Requirement Scope: Nre for production cut-in
- Federal Supply Class: PSC 5841 (Radar Equipment, Airborne)
- BD Action: Reference Prime Contract N00019-24-F-0602 when contacting Raytheon Company Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: N00019 (NAVAL AIR SYSTEMS COMMAND)
- Acquisition Method: SOLE-SOURCE
- FOIA Jurisdiction: Naval Air Systems Command (NAVAIR) FOIA (Official Portal)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Issued Task & Delivery Orders under N00019-24-F-0602 (15 shown, $454.2M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| N0001924F2560 | $111.5M | Raytheon Company | 2023-12-22 / 2026-04-21 | 2028-02-29 | Production of 102 jsow agm-153 block iii missiles for taiwan and bahrain |
| N0001925F0977 | $57.5M | Raytheon Company | 2025-08-29 / 2026-05-01 | 2028-12-28 | Production dsmac/obsolescence phase iii |
| N0001925F0205 | $52.2M | Raytheon Company | 2025-02-06 / 2026-05-18 | 2028-02-29 | The purpose of this order is to procure flir spares for the following fms customers: spain, india, norway, south korea, saudi arabia. |
| N0001924F2582 | $39.4M | Raytheon Company | 2024-09-24 / 2026-06-04 | 2027-05-31 | Mv/cmv/cv common software corrections |
| N0001924F2603 | $38.5M | Raytheon Company | 2024-06-26 / 2026-05-11 | 2027-09-29 | Functional area system engineering |
| N0001924F0171 | $31.9M | Raytheon Company | 2023-10-31 / 2025-09-30 | 2027-06-30 | Supply base capacity - phase i |
| N0001923F0081 | $24.4M | Raytheon Company | 2022-12-01 / 2026-05-06 | 2028-02-29 | Pds eed non-recurring engineering |
| N0001925F0046 | $18.4M | Raytheon Company | 2025-05-23 / 2026-02-05 | 2028-08-22 | Fceu re-design |
| N0042121F5775 | $16.6M | Raytheon Company | 2021-08-30 / 2026-05-26 | 2026-08-31 | Pmo and engineering top level support |
| N0001925F0983 | $15.0M | Raytheon Company | 2025-08-29 / 2025-12-23 | 2028-04-29 | Onyx cmos image sensor lotb |
| N0042123F0738 | $14.6M | Raytheon Company | 2023-08-24 / 2026-05-29 | 2027-08-23 | Labor & material (proc) (base year) |
| N0001921F0810 | $12.2M | Raytheon Company | 2021-09-27 / 2026-03-23 | 2026-06-30 | Ch-53k lrip lot 4 and 5, options lots 6-8 |
| N0001925F0056 | $11.5M | Raytheon Company | 2025-08-27 / 2026-05-27 | 2028-07-26 | Fy25 software sustainment release candidate (rc) 01 |
| N0001923F0463 | $5.4M | Raytheon Company | 2023-08-01 / 2025-08-01 | 2026-01-31 | Dsmac phase ii |
| N0001925F2229 | $5.2M | Raytheon Company | 2025-07-23 / 2026-03-24 | 2026-10-31 | Radar wra repair |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under N00019-24-F-0602 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by Raytheon Company across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| Lockheed Martin Corporation $LMT | $242.6M | 2025-02-14 | FA8611-24-C-B001 (Prime Network ($RTX)) | PRECISION MACHINED,OPTICAL ASSEMBLIES,PEDEST&GIMBALPLATFRM. |
| Lockheed Martin Corporation $LMT | $168.6M | 2025-10-07 | FA8611-24-C-B001 (Prime Network ($RTX)) | PRECISION MACHINED,OPTICAL ASSEMBLIES,OTHER TEST EQUIP,TEST EQUIPMENT,PEDEST&GIMBALPLATFRM,GROUND SUPPORT EQUIP. |
| Howmet Aerospace Inc $HWM | $114.5M | 2026-06-15 | N00019-24-C-0003 (Prime Network ($RTX)) | F135-PW-100 Engine Lot 18/19 & Engine Core Upgrade (ECU) single-crystal directionally solidified high-pressure turbine blades & vanes |
| Northrop Grumman Systems Corp $NOC | $101.0M | 2025-12-12 | N00019-24-C-0032 (Prime Network ($RTX)) | ROCKET MOTORS,NRE - ALL. |
| Mercury Systems Inc $MRCY | $68.4M | 2026-04-17 | N00024-24-C-5401 (Prime Network ($RTX)) | AN/SPY-6(V)1 & (V)4 Air and Missile Defense Radar (AMDR) rugged OpenVPX digital receiver/exciter & FPGA signal processing subassemblies |
| Leonardo Drs Inc $DRS | $61.8M | 2026-02-27 | W31P4Q-23-D-0019 (Prime Network ($RTX)) | Army Mobile-LIDS (M-LIDS) Counter-UAS cooled EO/IR thermal imaging gimbals and vehicle power distribution subsystems |
| Mercury Systems Inc $MRCY | $52.1M | 2026-05-08 | W31P4Q-24-C-0012 (Prime Network ($RTX)) | Lower Tier Air and Missile Defense Sensor (LTAMDS) Gallium Nitride (GaN) radar high-speed mixed-signal RF & blade processing modules |
| Ttm Technologies Inc $TTMI | $46.3M | 2026-04-02 | N00024-24-C-5401 (Prime Network ($RTX)) | AN/SPY-6(V) & Next Generation Jammer (NGJ-MB) high-density RF/microwave printed circuit boards and integrated backplane assemblies |
| Moog Inc $MOGA | $39.4M | 2026-03-09 | N00024-24-C-5312 (Prime Network ($RTX)) | Standard Missile-6 (SM-6 Block IA) & ESSM Block 2 electromechanical steering fin control actuation systems (CAS) |
| Raytheon-Rafael Area Protection Systems Llc $RTX | $37.1M | 2025-11-20 | M67854-25-C-0111 (Prime Network ($RTX)) | LAUNCHERS&CANNISTERS. |
Recent Contract Actions from Buying Office N00019 (NAVAL AIR SYSTEMS COMMAND)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-23 | N00019-27-F-1037 | Lockheed Martin Aeronautics Co. | $114.6M | January 2030 | Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $114,629,966 cost-plus-fixed-fee order (N0001927F1037) against a previously... |
| 2026-10-22 | N00019-23-C-0049 | Saab Inc. | $14.3M | June 2028 | Saab Inc., East Syracuse, New York, is awarded a $14,308,164 firm-fixed-price modification (P00026) to a previously awarded contract (N00019... |
| 2026-10-19 | N00019-23-C-0003 | Lockheed Martin Aeronautics Co. | $9.4M | March 2028 | Lockheed Martin Aeronautics Co., Fort Worth, Texas (N0001923C0003), is awarded a $9,376,464 firm-fixed-price modification (P00029) to a prev... |
| 2026-10-16 | N00019-27-D-1006 | Boeing | $80.0M | - | No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not comp... |
| 2026-10-15 | N00019-22-C-0015 | Lockheed Martin Aeronautics | $18.8M | - | The award record on file for N0001922C0015 shows a $118.71M ceiling and $118.71M obligated, as of the last USAspending load. |
| 2026-10-14 | N00019-26-F-2222 | Lockheed Martin | $16.1M | - | The award record on file for N0001924G0010 shows a $2.00M ceiling, as of the last USAspending load. |
| 2026-10-05 | N00019-25-G-0003 | Northrop Grumman Systems | $66.0M | - | Northrop Grumman Systems wins $66.0M order for recurring engineering retrofit efforts, material. Naval Air Systems Command $53.6M obligated ... |
| 2026-09-30 | N00019-26-C-1024 | - | $57.7M | - | Lockheed Martin Aeronautics wins $57.7M contract for software development, a qualification-tested software build. Naval Air Systems Command ... |
Other Recent Department of War Awards to Raytheon Company
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-28 | N00019-25-G-0009 | Navy | $21.7M | - | Raytheon Technologies, Raytheon Missiles and Defense wins $21.7M order for non-recurring engineering to mitigate obsolete components. Naval ... |
| 2026-09-28 | N00019-25-G-0009 | Navy | $19.5M | - | Raytheon Technologies, Raytheon Missiles and Defense wins $19.5M order. Naval Air Systems Command $6.6M obligated now. |
| 2026-09-01 | N00019-25-G-0009 | Navy | $42.5M | - | Raytheon Co., managed by Collins Aerospace wins $42.5M order for technical, engineering, and restoration services in support of air traffic ... |
| 2026-07-09 | N00019-25-G-0009 | Navy | $102.0M | - | Raytheon Technologies, Raytheon Missiles and Defense wins $102.0M order for non-recurring engineering for the Capsule Launch System MK 45 pr... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for N00019-24-F-0602
Routed to Naval Air Systems Command (NAVAIR) FOIA · Official Agency FOIA Portal ↗