AwardTape / Contracts / W31P4Q-22-F-0131
W31P4Q-22-F-0131: $38.1M Department of the Army Award to Raytheon Company
Stinger missile production. Contracting activity: W6QK ACC-RSA. Estimated completion: 2027-09-30.
$38.1M contract action / $752.4M cumulative ceiling / COMPETITION NOT STATED / 2027-09-30 completion / W31P4Q W6QK ACC-RSA
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W31P4Q-22-F-0131 (unhyphenated: W31P4Q22F0131) · Parent Vehicle: W31P4Q-21-D-0007 |
|---|---|
| Prime Contractor (Awardee) |
Raytheon Company
$RTX
(Arizona)
FY2024-FY2026 Federal Defense Portfolio: $28.0B obligated across 1,236 contracts
|
| Obligated Amount | $38,054,728 ($38.1M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $752,431,607 |
| USAspending / FPDS Obligation History | Base Record Obligated: $38,054,728 (signed 2022-05-25, latest FPDS action 2026-05-12) · 5 Issued Delivery/Task Order(s) totaling $1,138,540,002 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W31P4Q: W6QK ACC-RSA |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC 1410 (Guided Missiles) · NAICS 336414 (Guided Missile And Space Vehicle Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Arizona |
| Estimated Completion Date | 2027-09-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Stinger missile production
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Raytheon Company
- Delivery Runway: Active through 2027-09-30
- Requirement Scope: Stinger missile production
- Federal Supply Class: PSC 1410 (Guided Missiles)
- BD Action: Reference Prime Contract W31P4Q-22-F-0131 when contacting Raytheon Company Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W31P4Q (W6QK ACC-RSA)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Aviation and Missile Command (AMCOM) FOIA Office (usarmy.redstone.amcom.mbx.g6-foia-office@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W31P4Q-22-F-0131 (5 shown, $1.1B obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W31P4Q25F0081 | $578.6M | Raytheon Company | 2025-09-24 / 2025-09-24 | 2031-09-29 | Stinger missile production |
| W31P4Q24F0259 | $561.7M | Raytheon Company | 2024-09-25 / 2025-09-25 | 2030-04-30 | Stinger missile production |
| W31P4Q21F0255 | $0 | Raytheon Company | 2021-07-13 / 2026-05-28 | 2025-07-01 | Stinger taiwan and india fms case stinger missiles and associated equipment and services. |
| W31P4Q21F0288 | $0 | Raytheon Company | 2021-07-13 / 2026-05-22 | 2025-06-30 | Stinger missile production |
| W31P4Q23F0014 | -$1.8M | Raytheon Company | 2023-02-27 / 2026-03-13 | 2025-11-30 | Stinger atals launcher system and associated equipment. |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under W31P4Q-22-F-0131 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by Raytheon Company across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| Lockheed Martin Corporation $LMT | $242.6M | 2025-02-14 | FA8611-24-C-B001 (Prime Network ($RTX)) | PRECISION MACHINED,OPTICAL ASSEMBLIES,PEDEST&GIMBALPLATFRM. |
| Lockheed Martin Corporation $LMT | $168.6M | 2025-10-07 | FA8611-24-C-B001 (Prime Network ($RTX)) | PRECISION MACHINED,OPTICAL ASSEMBLIES,OTHER TEST EQUIP,TEST EQUIPMENT,PEDEST&GIMBALPLATFRM,GROUND SUPPORT EQUIP. |
| Howmet Aerospace Inc $HWM | $114.5M | 2026-06-15 | N00019-24-C-0003 (Prime Network ($RTX)) | F135-PW-100 Engine Lot 18/19 & Engine Core Upgrade (ECU) single-crystal directionally solidified high-pressure turbine blades & vanes |
| Northrop Grumman Systems Corp $NOC | $101.0M | 2025-12-12 | N00019-24-C-0032 (Prime Network ($RTX)) | ROCKET MOTORS,NRE - ALL. |
| Mercury Systems Inc $MRCY | $68.4M | 2026-04-17 | N00024-24-C-5401 (Prime Network ($RTX)) | AN/SPY-6(V)1 & (V)4 Air and Missile Defense Radar (AMDR) rugged OpenVPX digital receiver/exciter & FPGA signal processing subassemblies |
| Leonardo Drs Inc $DRS | $61.8M | 2026-02-27 | W31P4Q-23-D-0019 (Prime Network ($RTX)) | Army Mobile-LIDS (M-LIDS) Counter-UAS cooled EO/IR thermal imaging gimbals and vehicle power distribution subsystems |
| Mercury Systems Inc $MRCY | $52.1M | 2026-05-08 | W31P4Q-24-C-0012 (Prime Network ($RTX)) | Lower Tier Air and Missile Defense Sensor (LTAMDS) Gallium Nitride (GaN) radar high-speed mixed-signal RF & blade processing modules |
| Ttm Technologies Inc $TTMI | $46.3M | 2026-04-02 | N00024-24-C-5401 (Prime Network ($RTX)) | AN/SPY-6(V) & Next Generation Jammer (NGJ-MB) high-density RF/microwave printed circuit boards and integrated backplane assemblies |
| Moog Inc $MOGA | $39.4M | 2026-03-09 | N00024-24-C-5312 (Prime Network ($RTX)) | Standard Missile-6 (SM-6 Block IA) & ESSM Block 2 electromechanical steering fin control actuation systems (CAS) |
| Raytheon-Rafael Area Protection Systems Llc $RTX | $37.1M | 2025-11-20 | M67854-25-C-0111 (Prime Network ($RTX)) | LAUNCHERS&CANNISTERS. |
Recent Contract Actions from Buying Office W31P4Q (W6QK ACC-RSA)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-29 | W31P4Q-26-F-0067 | Dynetics | $37.7M | Nov 30, 2029 | Dynetics gets $37.7M modification for additional spares and engineering services to support Indirect Fire Protection Capability. Army Contra... |
| 2026-09-28 | W31P4Q-25-F-0279 | Intuitive Research and Technology | $58.7M | Sep 26, 2027 | Intuitive Research and Technology gets $58.7M modification for systems engineering and technical assistance support for the Short. Army Cont... |
| 2026-09-25 | W31P4Q-24-C-0007 | Lockheed Martin | $16.6M | Sep 24, 2027 | Lockheed Martin gets $16.6M modification for precision guided munitions and rockets. U.S. Army Contracting Command $9.9M obligated now work ... |
| 2026-09-14 | W31P4Q-26-D-A001 | Lockheed Martin | $1.2B | Sep 13, 2031 | Lockheed Martin wins $1.2B contract for Precision Strike Missile Increment 2 Early Operational Capability. Army Contracting Command work thr... |
| 2026-09-14 | W31P4Q-26-C-A003 | Lockheed Martin | $97.6M | Sep 4, 2031 | Lockheed Martin wins $97.6M contract for Multiple Launch Rocket System recapitalization. Army Contracting Command $97.6M obligated now work ... |
| 2026-08-27 | W31P4Q-26-F-0040 | Raytheon | $38.4M | Aug 17, 2027 | Raytheon wins $38.4M contract for a $38,378,404 cost-no-fee, cost-plus-fixed-fee, firm-fixed-price. Army Contracting Command signed Aug 17, ... |
| 2026-08-26 | W31P4Q-23-F-B002 | Torch Technologies | $12.0M | Sep 3, 2027 | Torch Technologies gets $12.0M modification for missile systems technical support. Army Contracting Command work through Sep 3, 2027. |
| 2026-08-19 | W31P4Q-23-F-E001 | Applied Technologies Group | $12.9M | Oct 12, 2027 | Applied Technologies Group gets $12.9M modification for logistics support for the Utility Helicopters Project Office. Army Contracting Comma... |
Other Recent Department of War Awards to Raytheon Company
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-22 | FA8672-19-D-0001 | Air Force | $350.0M | Dec. 31, 2030 | Small Diameter Bomb II life cycle support (GBU-53/B) |
| 2026-10-13 | N00383-25-D-NE01 | DoD | $15.1M | - | The award record on file for N0038325DNE01 shows a $155.81M ceiling, as of the last USAspending load. |
| 2026-10-13 | FA2293-27-D-B001 | DoD | $800K | - | This contract was a sole source acquisition. Fiscal 2026 research, development, test and evaluation funds in the amount of $800,000 are bein... |
| 2026-10-08 | N00024-25-C-5409 | DoD | $0 | - | The action is noncompetitive and undefinitized, on a new contract, and it obligates $454.2M of fiscal 2026 procurement funds at award. |
| 2026-10-01 | N00383-26-F-9U01 | Navy | $83.8M | - | Raytheon wins $83.8M contract for logistics, spare and repair support for the APY-10 Radar. Naval Supply Systems Command Weapon Systems Supp... |
| 2026-10-01 | N00024-22-C-5400 | Navy | $11.6M | Jul 31, 2028 | Raytheon gets $11.6M modification for Seeker Head Assemblies for Rolling Airframe Missile (RAM) Block 1/2 Guided Missile Round Pack. Naval S... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W31P4Q-22-F-0131
Routed to Army Aviation and Missile Command (AMCOM) FOIA Office (usarmy.redstone.amcom.mbx.g6-foia-office@army.mil) · Official Agency FOIA Portal ↗