AwardTape / Contracts / W58RGZ-20-D-0065
W58RGZ-20-D-0065: Department of the Army Award to The Boeing Company
Inspection, overhaul, and upgrade of noun: tail rotor swashplate control for the AH-64 apache weapon system.. Contracting activity: W6QK ACC-RSA.
$17.5M cumulative ceiling / Sole-source IDIQ / W58RGZ W6QK ACC-RSA
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W58RGZ-20-D-0065 (unhyphenated: W58RGZ20D0065) |
|---|---|
| Prime Contractor (Awardee) |
The Boeing Company
$BA
FY2024-FY2026 Federal Defense Portfolio: $1.0B obligated across 1,158 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $17,463,002 |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2020-06-01, latest FPDS action 2025-04-17) · 5 Issued Delivery/Task Order(s) totaling $668,984 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W58RGZ: W6QK ACC-RSA |
| Competition & Contract Structure | SOLE-SOURCE · Indefinite Delivery Contract (IDIQ) / Order-Dependent (IDV) |
| Product / Service & Industry Codes | PSC 1615 (Helicopter Rotor Blades, Drive Mechanisms And Components) · NAICS 336413 (Other Aircraft Parts And Auxiliary Equipment Manufacturing) |
| Work Locations & Funding | Determined at the contract or task-order level |
| Estimated Completion Date | See order schedule |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Inspection, overhaul, and upgrade of noun: tail rotor swashplate control for the AH-64 apache weapon system.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: The Boeing Company
- Delivery Runway: Active through multi-year ordering period
- Requirement Scope: Inspection, overhaul, and upgrade of noun: tail rotor swashplate control for the AH-64 apache weapon system.
- Federal Supply Class: PSC 1615 (Helicopter Rotor Blades, Drive Mechanisms And Components)
- BD Action: Reference Prime Contract W58RGZ-20-D-0065 when contacting The Boeing Company Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W58RGZ (W6QK ACC-RSA)
- Acquisition Method: SOLE-SOURCE
- FOIA Jurisdiction: Army Aviation and Missile Command (AMCOM) FOIA Office (usarmy.redstone.amcom.mbx.g6-foia-office@army.mil)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Issued Task & Delivery Orders under W58RGZ-20-D-0065 (5 shown, $669K obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W58RGZ25F0181 | $615K | The Boeing Company | 2025-05-07 / 2025-08-12 | 2029-04-30 | Maintenance and overhaul of swashplate control for apache helicopter |
| W58RGZ22F0343 | $22K | The Boeing Company | 2022-08-24 / 2026-01-28 | 2026-03-31 | Noun: swashplate control nsn: 1615-01-599-5169 p/n: 7-511527038-105 |
| W58RGZ23F0402 | $19K | The Boeing Company | 2023-08-17 / 2026-06-04 | 2026-04-30 | Tail rotor swashplate control |
| W58RGZ23F0511 | $13K | The Boeing Company | 2023-09-25 / 2026-01-29 | 2026-07-31 | Maintenance and overhaul of swashplate control for AH-64 nsn: 1615-01-599-5169 p/n: 7-511527038-105 |
| W58RGZ20F0409 | $0 | The Boeing Company | 2020-06-01 / 2024-08-22 | 2024-06-01 | Overhaul/repair of AH-64 apache helicopter tail rotor swashplate |
Disclosed Tier-2 Sub-Awards & Component Suppliers (FSRS / USAspending)
No FSRS sub-award filings have posted specifically under W58RGZ-20-D-0065 yet (primes report sub-awards >=$30,000 the month after subcontract execution under FAR 52.204-10). Below are active disclosed Tier-2 suppliers and sub-awards executed by The Boeing Company across its defense prime contracts:
| Tier-2 Subcontractor / Supplier | Sub-Award Amount | Action Date | Prime Contract | Component / Scope Description |
|---|---|---|---|---|
| Northrop Grumman Systems Corporation $NOC | $246.9M | 2025-02-10 | N00019-18-C-1046 (Prime Network ($BA)) | MAJOR STRUCTURES |
| Northrop Grumman Systems Corporation $NOC | $145.6M | 2024-12-13 | N00019-18-C-1046 (Prime Network ($BA)) | MAJOR STRUCTURES |
| Spirit Aerosystems Inc $SPR | $96.5M | 2026-04-22 | FA8625-20-C-6500 (Prime Network ($BA)) | KC-46A Pegasus Lot 10/11 forward fuselage, engine nacelles, and wing leading-edge structural assemblies |
| Raytheon Company $RTX | $85.3M | 2025-10-29 | N00019-22-F-0030 (Prime Network ($BA)) | SYSTEMS |
| Northrop Grumman Systems Corporation $NOC | $67.4M | 2024-08-20 | N00019-22-F-0030 (Prime Network ($BA)) | PROPULSION |
| Raytheon Company $RTX | $63.0M | 2024-02-02 | N00019-18-C-1046 (Prime Network ($BA)) | SYSTEMS |
| Raytheon Company $RTX | $60.0M | 2024-05-24 | N00019-19-C-0016 (Prime Network ($BA)) | SYSTEMS |
| Mercury Systems Inc $MRCY | $50.7M | 2024-06-28 | FA8625-11-C-6600 (Prime Network ($BA)) | NON PRODUCTION |
| Woodward Inc $WWD | $44.1M | 2026-05-09 | FA8634-24-C-0003 (Prime Network ($BA)) | JDAM (Joint Direct Attack Munition) & Small Diameter Bomb (SDB I) precision tailkit fin actuation & fuel metering controls |
| Lockheed Martin Corporation $LMT | $42.7M | 2024-03-15 | N68335-24-F-0122 (Prime Network ($BA)) | SYSTEMS |
Recent Contract Actions from Buying Office W58RGZ (W6QK ACC-RSA)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-22 | W58RGZ-27-D-A008 | Longbow LLC | $419.6M | Jan. 31, 2032 | Fire control radar systems and post-production support services for the Apache Attack Helicopter (AH64D/E) |
| 2026-10-13 | W58RGZ-27-D-A007 | Lockheed Martin | $117.1M | - | |
| 2026-09-30 | W58RGZ-23-F-0395 | Boeing | $33.9M | Oct 31, 2029 | Boeing gets $33.9M modification for add country-specific requirements (Korea) to the CH-47F Block I Chinook helicopter production. Army Cont... |
| 2026-09-29 | W58RGZ-26-D-0058 | Boeing | $26.1M | Sep 28, 2031 | Boeing wins $26.1M contract for maintenance and overhaul of CH-47 Chinook cargo hook. Army Contracting Command work through Sep 28, 2031. |
| 2026-09-22 | W58RGZ-26-C-0008 | Sikorsky Aircraft Corporation | $0 | Dec 31, 2026 | Correction to an earlier Army award. . |
| 2026-09-18 | W58RGZ-26-F-A026 | - | $10.6M | Dec 15, 2026 | Skyeton wins $10.6M contract for Raybird UAS hardware and services. U.S. Army Contracting Command work through Dec 15, 2026. |
| 2026-09-17 | W58RGZ-26-C-0008 | Sikorsky, a Lockheed Martin | $234.5M | Jun 30, 2028 | Sikorsky, a Lockheed Martin gets $234.5M modification for 16 UH-60M Black Hawk helicopters. U.S. Army Contracting Command $234.5M obligated ... |
| 2026-09-10 | W58RGZ-26-F-A016 | - | $0 | - | Correction to an earlier Griffon Aerospace award. . |
Other Recent Department of War Awards to The Boeing Company
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-08-17 | W58RGZ-24-C-0028 | DoD | $0 | Apr 30, 2027 | Correction to an earlier Army award. . |
| 2026-08-14 | W58RGZ-24-C-0028 | Army | $636.1M | Apr 30, 2029 | Boeing gets $636.1M modification for performance-based logistics support for depot-level component repair of highly complex items. Army Cont... |
| 2026-07-31 | W58RGZ-24-C-0036 | Army | $22.3M | Jul 31, 2027 | Boeing gets $22.3M modification for AH-64E Apache aircraft maintenance support. Army Contracting Command $22.3M obligated now work through J... |
| 2026-04-07 | W58RGZ-24-C-0002 | Army | $51.9M | May 31, 2028 | Boeing gets $51.9M modification for postproduction support services for the AH-6 in support of the Saudi Arabia Ministry. Army Contracting C... |
| 2026-03-13 | W58RGZ-24-C-0028 | Army | $95.9M | Apr 30, 2027 | Boeing gets $95.9M modification for performance-based logistics support for depot level repair of Apache Airframe components. U.S. Army Cont... |
| 2025-12-31 | W58RGZ-26-D-0013 | Army | $2.7B | Dec 31, 2030 | Boeing wins $2.73B contract for Apache post-production support services. Army Contracting Command work through Dec 31, 2030. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W58RGZ-20-D-0065
Routed to Army Aviation and Missile Command (AMCOM) FOIA Office (usarmy.redstone.amcom.mbx.g6-foia-office@army.mil) · Official Agency FOIA Portal ↗