AwardTape / Contracts / W90VN9-26-F-A075
W90VN9-26-F-A075: $3.2M Department of the Army Award to Seong Bo Const.ind.co.,ltd
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the repair of transient training enlisted barracks at building 3430.. Contracting activity: 0906 AQ CO DET A CONTRACTI. Estimated completion: 2027-05-10.
$3.2M contract action / $3.2M cumulative ceiling / COMPETITION NOT STATED / 2027-05-10 completion / W90VN9 0906 AQ CO DET A CONTRACTI
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W90VN9-26-F-A075 (unhyphenated: W90VN926FA075) · Parent Vehicle: W91QVN-24-D-0053 |
|---|---|
| Prime Contractor (Awardee) |
Seong Bo Const.ind.co.,ltd
FY2024-FY2026 Federal Defense Portfolio: $68.7M obligated across 49 contracts
|
| Obligated Amount | $3,196,328 ($3.2M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $3,196,328 |
| USAspending / FPDS Obligation History | Base Record Obligated: $3,196,328 (signed 2026-04-29, latest FPDS action 2026-04-29) · 7 Issued Delivery/Task Order(s) totaling $2,037,667 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W90VN9: 0906 AQ CO DET A CONTRACTI |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2FC (Repair Or Alteration Of Troop Housing Facilities) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Determined at the contract or task-order level |
| Estimated Completion Date | 2027-05-10 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the repair of transient training enlisted barracks at building 3430.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Seong Bo Const.ind.co.,ltd
- Delivery Runway: Active through 2027-05-10
- Requirement Scope: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the repair of transient training enlisted barracks at building 3430.
- Federal Supply Class: PSC Z2FC (Repair Or Alteration Of Troop Housing Facilities)
- BD Action: Reference Prime Contract W90VN9-26-F-A075 when contacting Seong Bo Const.ind.co.,ltd Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W90VN9 (0906 AQ CO DET A CONTRACTI)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W90VN9-26-F-A075 (7 shown, $2.0M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W90VN925FA029 | $505K | Seong Bo Const.ind.co.,ltd | 2025-03-11 / 2025-03-11 | 2025-10-01 | See attachment 1. statement of work (ha-00026-4j) |
| W90VN925FA127 | $432K | Seong Bo Const.ind.co.,ltd | 2025-06-29 / 2026-03-19 | 2026-04-20 | Repair failed or failing drainage system from ta60, camp carroll. |
| W90VN924F0194 | $404K | Seong Bo Const.ind.co.,ltd | 2024-08-07 / 2025-04-02 | 2025-09-30 | Work type: "k"-repair failing heating system and drain lines of bldg. #323, camp carroll |
| W90VN726FA037 | $397K | Seong Bo Const.ind.co.,ltd | 2026-05-06 / 2026-05-06 | 2027-03-04 | The work under mlwr 27-1007 repair fire alarm system at dorm 1406, kunsan ab consists of project design, furnishing all labor, equipment, materials, transportation, and supervision necessary to perform all the work as indicated herein. |
| W90VN924F0212 | $222K | Seong Bo Const.ind.co.,ltd | 2024-08-14 / 2024-08-14 | 2025-02-21 | Repair b660 (kn break rm) msck, cc |
| W90VN924F0030 | $47K | Seong Bo Const.ind.co.,ltd | 2024-01-09 / 2024-01-09 | 2024-05-21 | Work class "k" (non-work plan) |
| W90VN724FA029 | $32K | Seong Bo Const.ind.co.,ltd | 2024-08-23 / 2024-08-23 | 2025-03-20 | Mlwr24-1035, support construction for us ARMY fran tower, kunsan ab |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W90VN9-26-F-A075
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗