AwardTape / Contracts / W90VN9-26-F-A081
W90VN9-26-F-A081: Department of the Army Award to Geumjang Construction Co.,ltd
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein and in accordance with the statement of work, drawings, sketches and specifications.. Contracting activity: 0906 AQ CO DET A CONTRACTI. Estimated completion: 2026-07-06.
COMPETITION NOT STATED / 2026-07-06 completion / W90VN9 0906 AQ CO DET A CONTRACTI
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W90VN9-26-F-A081 (unhyphenated: W90VN926FA081) · Parent Vehicle: W91QVN-24-D-0043 |
|---|---|
| Prime Contractor (Awardee) |
Geumjang Construction Co.,ltd
FY2024-FY2026 Federal Defense Portfolio: $11.0M obligated across 42 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2026-04-01, latest FPDS action 2026-04-10) · 7 Issued Delivery/Task Order(s) totaling $3,669,502 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W90VN9: 0906 AQ CO DET A CONTRACTI |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z1AZ (Maintenance Of Other Administrative Facilities And Service Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Determined at the contract or task-order level |
| Estimated Completion Date | 2026-07-06 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein and in accordance with the statement of work, drawings, sketches and specifications.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Geumjang Construction Co.,ltd
- Delivery Runway: Active through 2026-07-06
- Requirement Scope: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein and in accordance with the statement of work, drawings, sketches and specifications.
- Federal Supply Class: PSC Z1AZ (Maintenance Of Other Administrative Facilities And Service Buildings)
- BD Action: Reference Prime Contract W90VN9-26-F-A081 when contacting Geumjang Construction Co.,ltd Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W90VN9 (0906 AQ CO DET A CONTRACTI)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W90VN9-26-F-A081 (7 shown, $3.7M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W90VN926FA078 | $1.4M | Geumjang Construction Co.,ltd | 2026-03-23 / 2026-03-23 | 2026-11-30 | Repair failed or failing b974 (barracks), camp carroll |
| W90VN924F0220 | $1.4M | Geumjang Construction Co.,ltd | 2024-09-10 / 2025-12-10 | 2026-01-30 | Repair roof at b2300 & b2302, drmo kimcheon |
| W90VN924F0089 | $233K | Geumjang Construction Co.,ltd | 2024-05-08 / 2024-05-08 | 2024-10-12 | Maximum contract amount - k work |
| W90VN924F0187 | $204K | Geumjang Construction Co.,ltd | 2024-08-05 / 2025-05-11 | 2025-06-18 | Work type: "k"-repair deteriorated and failing bldg. #212, camp walker |
| W90VN924F0120 | $202K | Geumjang Construction Co.,ltd | 2024-05-27 / 2025-01-13 | 2025-03-31 | Work type: "k"-replace 15ea of defective fire hydrants, usag |
| W90VN924F0108 | $139K | Geumjang Construction Co.,ltd | 2024-05-21 / 2025-04-21 | 2025-05-30 | Maximum contract amount - k work |
| W90VN924F0100 | $94K | Geumjang Construction Co.,ltd | 2024-05-13 / 2024-05-13 | 2024-12-25 | Replace damaged vehicle exhaust ventilation system, bldg s-835 at camp carroll |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W90VN9-26-F-A081
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗