AwardTape / Contracts / W91238-23-C-0003
W91238-23-C-0003: $15.0M Department of the Army Award to SGJV, LLC
Replaces 8 existing boilers in bldg 260 with new dual-fuel boilers. existing boiler fuel oil underground storage tanks (usts) will be removed and replaced with above ground storage tanks able to provide 7 days of storage during peak .... Contracting activity: W075 ENDIST SACRAMENTO. Estimated completion: 2027-02-16.
$15.0M contract action / $95.9M cumulative ceiling / COMPETITION NOT STATED / 2027-02-16 completion / W91238 W075 ENDIST SACRAMENTO
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W91238-23-C-0003 (unhyphenated: W9123823C0003) |
|---|---|
| Prime Contractor (Awardee) |
SGJV, LLC
(Utah)
FY2024-FY2026 Federal Defense Portfolio: $15.0M obligated across 1 contracts
|
| Obligated Amount | $15,019,128 ($15.0M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $95,908,776 |
| USAspending / FPDS Obligation History | Base Record Obligated: $15,019,128 (signed 2023-01-23, latest FPDS action 2026-03-12) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W91238: W075 ENDIST SACRAMENTO |
| Competition & Contract Structure | COMPETITION NOT STATED · Definitive Contract / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2NB (Repair Or Alteration Of Heating And Cooling Plants) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Utah |
| Estimated Completion Date | 2027-02-16 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Replaces 8 existing boilers in bldg 260 with new dual-fuel boilers. existing boiler fuel oil underground storage tanks (usts) will be removed and replaced with above ground storage tanks able to provide 7 days of storage during peak ...
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: SGJV, LLC
- Delivery Runway: Active through 2027-02-16
- Requirement Scope: Replaces 8 existing boilers in bldg 260 with new dual-fuel boilers. existing boiler fuel oil underground storage tanks (usts) will be removed and replaced with above ground storage tanks able to provide 7 days of storage during peak ...
- Federal Supply Class: PSC Z2NB (Repair Or Alteration Of Heating And Cooling Plants)
- BD Action: Reference Prime Contract W91238-23-C-0003 when contacting SGJV, LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W91238 (W075 ENDIST SACRAMENTO)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W91238 (W075 ENDIST SACRAMENTO)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-16 | W91238-23-C-0014 | Granite Construction | $32.4M | - | The award record on file for W9123823C0014 shows a $202.43M ceiling and $199.93M obligated, as of the last USAspending load. |
| 2026-09-30 | W91238-26-C-A014 | M.A. Mortenson | $218.7M | Aug 13, 2029 | M.A. Mortenson wins $218.7M contract for design-build construction of a two-story depot maintenance complex to support F-35. U.S. Army Corps... |
| 2026-09-30 | W91238-26-C-A014 | - | $0 | - | Correction to an earlier M.A. Mortenson award. . |
| 2026-09-29 | W91238-26-C-A014 | M.A. Mortenson | $218.7M | Aug 11, 2029 | M.A. Mortenson wins $218.7M contract for design-build construction of a hangar maintenance facility. U.S. Army Corps of Engineers $100.0M ob... |
| 2026-09-28 | W91238-26-C-A020 | - | $9.4M | Jun 10, 2028 | Kamalani-Odin JV wins $9.4M contract for design-bid-build construction for levee improvement. U.S. Army Corps of Engineers $9.4M obligated n... |
| 2026-08-27 | W91238-23-C-0010 | Folsom Dam Constructors | $10.3M | Oct 26, 2029 | Folsom Dam Constructors gets $10.3M modification for Folsom Dam Wing Dam construction. U.S. Army Corps of Engineers $10.3M obligated now wor... |
| 2026-06-15 | W91238-26-D-A001 | Landology Inc | $99.0M | Jun 11, 2031 | Landology and 4 others share $99.0M order for each order of the $99,000,000 firm-fixed-price contract for mitigation. U.S. Army Corps of Eng... |
| 2026-06-15 | W91238-26-C-A005 | SES Construction and Fuel Services | $17.7M | Sep 29, 2028 | SES Construction and Fuel Services wins $17.7M contract for design and construction of a one-story egress facility for depot-level repairs. ... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W91238-23-C-0003
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗