Command Search (/)DoD & DHS Obligations $1.40T FY24-26Expiring Recompetes 300 $126.8BPalantir Maven 81.6% fill $637.6M / $781.3MAnduril Enterprise $20B IDIQUS Grid Queue 107.8 GW 523 projectsSanctions & UFLPA 432 entitiesContract RecordsUpdated Oct 26, 2026
AwardTape

AwardTape / Contracts / W9127S-21-F-6020

W9127S-21-F-6020: Department of the Army Award to J E Dunn Construction Company

Design build initial outfitting (dbio), tyndall afb, fl. Contracting activity: W076 ENDIST LITTLE ROCK. Estimated completion: 2024-09-27.

$29.4M cumulative ceiling / COMPETITION NOT STATED / 2024-09-27 completion / W9127S W076 ENDIST LITTLE ROCK

1. Contract Summary & Primary Sources

Contract Number (PIID) W9127S-21-F-6020 (unhyphenated: W9127S21F6020) · Parent Vehicle: W9127S-17-D-6003
Prime Contractor (Awardee) J E Dunn Construction Company (Florida)
FY2024-FY2026 Federal Defense Portfolio: $197.9M obligated across 10 contracts
Obligated Amount Order-Dependent / TBD
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $29,422,763
USAspending / FPDS Obligation History Base Record Obligated: -$365,401 (signed 2021-09-30, latest FPDS action 2024-05-02) · 1 Issued Delivery/Task Order(s) totaling $4,503,863
Awarding Branch / Agency Department of the Army
Contracting Command & DoDAAC W9127S: W076 ENDIST LITTLE ROCK
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC Z2DA (Repair Or Alteration Of Hospitals And Infirmaries) · NAICS 236220 (Commercial And Institutional Building Construction)
Work Locations & Funding Primary Place of Performance: Florida
Estimated Completion Date 2024-09-27
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract W9127S21F6020)

Design build initial outfitting (dbio), tyndall afb, fl

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: J E Dunn Construction Company
  • Delivery Runway: Active through 2024-09-27
  • Requirement Scope: Design build initial outfitting (dbio), tyndall afb, fl
  • Federal Supply Class: PSC Z2DA (Repair Or Alteration Of Hospitals And Infirmaries)
  • BD Action: Reference Prime Contract W9127S-21-F-6020 when contacting J E Dunn Construction Company Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: W9127S (W076 ENDIST LITTLE ROCK)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under W9127S-21-F-6020 (1 shown, $4.5M obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
W9127S19F0161 $4.5M J E Dunn Construction Company 2019-09-25 / 2024-01-22 2023-04-24 Design-build initial outfitting (dbio) project for the in-patient, out-patient, and satellite pharmacy renovation at eglin afb located in florida.
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact J E Dunn Construction Company Supply Chain / Small Business Liaison referencing contract W9127S-21-F-6020.

Recent Contract Actions from Buying Office W9127S (W076 ENDIST LITTLE ROCK)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-08-19 W9127S-22-D-0026 Great Lakes Dredge & Dock $12.3M Aug 20, 2027 Great Lakes Dredge & Dock gets $12.3M modification for long-term capability, station dredging on the McClellan-Kerr Arkansas River Navigatio...
2026-08-03 W9127S-26-C-A009 BL Harbert International $37.6M Jan 31, 2029 BL Harbert International wins $37.6M contract for an F-35 Special Access Program Facility. U.S. Army Corps of Engineers $37.6M obligated now...
2026-04-07 W9127S-26-C-A006 BL Harbert International $40.9M Mar 23, 2028 BL Harbert International wins $40.9M contract for construction of an approximately 25,000-square-foot. U.S. Army Corps of Engineers $40.9M o...
2025-12-11 W9127S-26-C-A001 BL Harbert International $61.4M Mar 21, 2028 BL Harbert International wins $61.4M contract for F-35 program, supporting multiple countries simultaneously. U.S. Army Corps of Engineers $...
2025-11-13 W9127S-26-C-A002 Red Eagle 3 JV of Coweta $22.9M Nov 23, 2027 Red Eagle 3 JV of Coweta wins $22.9M contract for design-build services for the Pine Bluff Arsenal Waterline Replacement. U.S. Army Corps of...
2025-09-08 W9127S-25-D-A004 Olgoonik General $45.0M Sep 7, 2030 Olgoonik General wins $45.0M contract for various minor construction projects. U.S. Army Corps of Engineers work through Sep 7, 2030.

Other Recent Department of War Awards to J E Dunn Construction Company

Date Contract (PIID) Branch Amount Completion Scope Summary
2026-07-08 FA8903-19-C-0021 Air Force $45.8M Aug 4, 2028 JE DUNN Construction gets $45.8M modification for repair of the cadet chapel at the U.S. Air Force Academy. Air Force Installation Contracti...
2025-09-19 W912QR-25-C-A027 Army $54.5M Mar 4, 2028 J.E. Dunn Construction wins $54.5M contract. U.S. Army Corps of Engineers $54.5M obligated now work through Mar 4, 2028.

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for W9127S-21-F-6020

Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗

Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.