AwardTape / Contracts / W912EP-25-F-A026
W912EP-25-F-A026: $70K Department of the Army Award to Re-Engineered Business Solutions, Inc
This requirement is to remove old pedestrian bridge decking, replace the decking with new materials/hardware, repair the handrails, and paint and seal the handrails with elastomeric paint.. Contracting activity: W074 ENDIST JACKSNVLLE. Estimated completion: 2025-11-24.
$70K contract action / $70K cumulative ceiling / COMPETITION NOT STATED / 2025-11-24 completion / W912EP W074 ENDIST JACKSNVLLE
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912EP-25-F-A026 (unhyphenated: W912EP25FA026) · Parent Vehicle: W912EP-23-D-0004 |
|---|---|
| Prime Contractor (Awardee) |
Re-Engineered Business Solutions, Inc
(Florida)
FY2024-FY2026 Federal Defense Portfolio: $62.9M obligated across 22 contracts
|
| Obligated Amount | $69,956 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $69,956 |
| USAspending / FPDS Obligation History | Base Record Obligated: $69,956 (signed 2025-09-18, latest FPDS action 2025-09-18) · 11 Issued Delivery/Task Order(s) totaling $8,538,277 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912EP: W074 ENDIST JACKSNVLLE |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z1JZ (Maintenance Of Miscellaneous Buildings) · NAICS 561210 (Facilities Support Services) |
| Work Locations & Funding | Primary Place of Performance: Florida |
| Estimated Completion Date | 2025-11-24 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
This requirement is to remove old pedestrian bridge decking, replace the decking with new materials/hardware, repair the handrails, and paint and seal the handrails with elastomeric paint.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Re-Engineered Business Solutions, Inc
- Delivery Runway: Active through 2025-11-24
- Requirement Scope: This requirement is to remove old pedestrian bridge decking, replace the decking with new materials/hardware, repair the handrails, and paint and seal the handrails with elastomeric paint.
- Federal Supply Class: PSC Z1JZ (Maintenance Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract W912EP-25-F-A026 when contacting Re-Engineered Business Solutions, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912EP (W074 ENDIST JACKSNVLLE)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912EP-25-F-A026 (11 shown, $8.5M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W912EP24F0077 | $2.7M | Re-Engineered Business Solutions, Inc | 2024-04-29 / 2025-09-11 | 2025-04-28 | Sfoo maintenance - ordering period 2 |
| W912EP25F0089 | $2.5M | Re-Engineered Business Solutions, Inc | 2025-05-09 / 2025-09-29 | 2026-05-08 | South florida operations office (sfoo) operations and maintenance (o&m) services |
| W912EP26FA057 | $2.5M | Re-Engineered Business Solutions, Inc | 2026-05-08 / 2026-05-08 | 2027-05-08 | Sfoo operations and maintenance ordering period four (4) |
| W912EP25FA038 | $194K | Re-Engineered Business Solutions, Inc | 2025-09-29 / 2025-09-29 | 2025-11-29 | This requirement is to replace the existing canaveral lock main entrance gate with a new automated gate that will meet k4 rating. |
| W912EP26FA061 | $168K | Re-Engineered Business Solutions, Inc | 2026-04-30 / 2026-04-30 | 2026-10-27 | St. lucie visitor center mold remediation |
| W912EP25FA031 | $123K | Re-Engineered Business Solutions, Inc | 2025-09-29 / 2025-09-29 | 2025-11-14 | This requirement is for the repair and replacement of the st lucie visitor center, building sf-111, roof which was damaged or incurred additional deterioration from hurricane milton. |
| W912EP23F0112 | $121K | Re-Engineered Business Solutions, Inc | 2023-04-28 / 2025-09-08 | 2024-04-28 | Task oder 1 under 23d0004 |
| W912EP24F0179 | $83K | Re-Engineered Business Solutions, Inc | 2024-09-23 / 2024-09-23 | 2024-12-24 | Diesel fuel tank replacement |
| W912EP25F0100 | $72K | Re-Engineered Business Solutions, Inc | 2025-05-15 / 2025-05-15 | 2025-07-14 | Mold remediation at canaveral lock. |
| W912EP25F0154 | $60K | Re-Engineered Business Solutions, Inc | 2025-08-26 / 2025-08-26 | 2026-11-25 | Canaveral lock septic tank replacement |
| W912EP24F0002 | $20K | Re-Engineered Business Solutions, Inc | 2023-12-05 / 2023-12-05 | 2024-01-04 | Wp franklin lock houses (5) |
Recent Contract Actions from Buying Office W912EP (W074 ENDIST JACKSNVLLE)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-11 | W912EP-26-C-A028 | Marinex Construction | $28.4M | May 28, 2027 | Marinex Construction wins $28.4M contract. U.S. Army Corps of Engineers $28.4M obligated now work through May 28, 2027. |
| 2026-09-10 | W912EP-26-C-A032 | Manson Construction | $22.8M | Mar 19, 2027 | Manson Construction wins $22.8M contract for maintenance dredging. U.S. Army Corps of Engineers $22.8M obligated now work through Mar 19, 20... |
| 2026-07-30 | W912EP-26-C-A022 | Haskell | $45.2M | Apr 11, 2029 | Haskell wins $45.2M contract for hangar renovations The amount of this action is $45,223,000 with a total cumulative face value. U.S. Army C... |
| 2026-07-21 | W912EP-26-C-A017 | Dutra Group | $15.6M | Dec 1, 2026 | Dutra Group wins $15.6M contract for maintenance dredging. U.S. Army Corps of Engineers $15.6M obligated now work through Dec 1, 2026. |
| 2026-04-13 | W912EP-26-C-A013 | Weeks Marine | $27.5M | Nov 6, 2026 | Weeks Marine wins $27.5M contract for a $27,495,000 firm-fixed-price contract to renourish approximately 3.2 miles of critically. U.S. Army ... |
| 2026-04-07 | W912EP-26-D-A001 | Applied Aquatic Management | $45.0M | Apr 7, 2031 | Applied Aquatic Management wins $45.0M contract for invasive species management services. U.S. Army Corps of Engineers work through Apr 7, 2... |
| 2026-01-12 | W912EP-26-C-A008 | Weeks Marine | $9.4M | Apr 30, 2026 | Weeks Marine wins $9.4M contract for shoreline renourishment. U.S. Army Corps of Engineers $9.4M obligated now work through Apr 30, 2026. |
| 2025-11-20 | W912EP-26-C-A005 | Great Lakes Dredge & Dock | $20.2M | May 8, 2026 | Great Lakes Dredge & Dock wins $20.2M contract for beach renourishment Bids were solicited via the internet with one received. U.S. Army Cor... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912EP-25-F-A026
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗