W912GB-26-F-A073: $547K Department of the Army Award to Porr Government Services Italy SRL

The general scope of work consists of removing and replacing approximately 1,147 square meters of roof membrane of building 7810 (pas z-14) located inside the zulu loop in area f.. Contracting activity: W2SD ENDIST EUROPE. Estimated completion: 2027-05-05.

$547K contract action / $547K cumulative ceiling / COMPETITION NOT STATED / 2027-05-05 completion / W912GB W2SD ENDIST EUROPE

1. Contract Summary & Primary Sources

Contract Number (PIID) W912GB-26-F-A073 (unhyphenated: W912GB26FA073) · Parent Vehicle: W912GB-25-D-0024
Prime Contractor (Awardee) Porr Government Services Italy SRL
FY2024-FY2026 Federal Defense Portfolio: $38.4M obligated across 200 contracts
Obligated Amount $546,864
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $546,864
USAspending / FPDS Obligation History Base Record Obligated: $546,864 (signed 2026-05-05, latest FPDS action 2026-05-05) · 15 Issued Delivery/Task Order(s) totaling $7,190,520
Awarding Branch / Agency Department of the Army
Contracting Command & DoDAAC W912GB: W2SD ENDIST EUROPE
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC Y1JZ (Construction Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction)
Work Locations & Funding Determined at the contract or task-order level
Estimated Completion Date 2027-05-05
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract W912GB26FA073)

The general scope of work consists of removing and replacing approximately 1,147 square meters of roof membrane of building 7810 (pas z-14) located inside the zulu loop in area f.

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: Porr Government Services Italy SRL
  • Delivery Runway: Active through 2027-05-05
  • Requirement Scope: The general scope of work consists of removing and replacing approximately 1,147 square meters of roof membrane of building 7810 (pas z-14) located inside the zulu loop in area f.
  • Federal Supply Class: PSC Y1JZ (Construction Of Miscellaneous Buildings)
  • BD Action: Reference Prime Contract W912GB-26-F-A073 when contacting Porr Government Services Italy SRL Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: W912GB (W2SD ENDIST EUROPE)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under W912GB-26-F-A073 (15 shown, $7.2M obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
W912GB26FA062 $2.9M Porr Government Services Italy SRL 2026-04-02 / 2026-04-28 2027-04-28 The objective of this project is to replace clay roof in aviano air base clinic, aviano italy.
W912GB25F0148 $2.0M Porr Government Services Italy SRL 2025-09-30 / 2025-09-30 2026-07-27 Sofa: haz waste and debris removal joc to
W912PF26FA063 $247K Porr Government Services Italy SRL 2026-04-09 / 2026-04-09 2026-12-05 Project e8-44280-3j replace external and common area doors at bldg # 170 - camp ederle - vicenza - italy
W912PF26FA089 $228K Porr Government Services Italy SRL 2026-05-13 / 2026-05-13 2026-10-28 The general scope of work consists of replacing the chillers (governmentfurnished equipment) and removing the steel canopies along with the associated pv panels #710 located at the cep, villaggio, vicenza, italy.
W912PF26FA060 $228K Porr Government Services Italy SRL 2026-03-25 / 2026-03-25 2026-09-28 Project hb-44200-5j: repair all electrical connections at dfac - bldg. 20, del din site, vicenza, italy
W912PF26FA023 $218K Porr Government Services Italy SRL 2025-12-19 / 2025-12-19 2026-08-05 Project title: mi-00006-4j repair dehumidification system at bldg. 11137 (cave), miotto - longare - italy
W912PF25FA115 $199K Porr Government Services Italy SRL 2025-09-16 / 2026-04-16 2026-03-21 Project title: e8-44302-5j repair two mechanical rooms, building 309 - ederle - vicenza - italy
W912PF26FA070 $198K Porr Government Services Italy SRL 2026-04-02 / 2026-04-22 2026-11-28 Project e8-44281-3j: replace external and common area doors at bldg. 173 - camp ederle - vicenza - italy
W912PF26FA103 $195K Porr Government Services Italy SRL 2026-05-19 / 2026-05-19 2026-11-16 Project e8-51385-5j: repair district heating lines behind building 309 - camp ederle - vicenza - italy
W912PF26FA066 $180K Porr Government Services Italy SRL 2026-04-02 / 2026-04-16 2026-09-29 Project ee-00029-5j: renovate bathrooms in bldg. 300 - camp ederle - vicenza - italy
W912PF25FA103 $154K Porr Government Services Italy SRL 2025-07-30 / 2026-03-24 2026-02-28 Joc project title hb-44071-4j provide permanent generator for bldg. 4, del din site, vicenza, italy
W912PF26FA096 $121K Porr Government Services Italy SRL 2026-05-18 / 2026-05-18 2026-09-21 Replacing the failing sewer line in front of buildings 7-8, removing abandoned underground tanks, and correcting the connected storm water line.
W912PF25FA133 $119K Porr Government Services Italy SRL 2025-09-18 / 2025-09-18 2026-03-24 Joc task order project title: aa-00059-5j open storage door repair at various buildings - del din - vicenza - italy
W912PF25FA084 $118K Porr Government Services Italy SRL 2025-07-29 / 2026-03-16 2026-02-09 Project e8-41160-4j provide permanent generator for bldg. 305 network node, camp ederle, vicenza, italy
W912PF26FA061 $114K Porr Government Services Italy SRL 2026-03-31 / 2026-03-31 2026-09-28 Projects e8-44395-5j hb-44394-5j repair ups s batteries at various bldg. camp ederle, longare and del din site vicenza
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Porr Government Services Italy SRL Supply Chain / Small Business Liaison referencing contract W912GB-26-F-A073.

Recent Contract Actions from Buying Office W912GB (W2SD ENDIST EUROPE)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-09-28 W912GB-26-C-A013 BL Harbert International $212.8M Sep 17, 2030 BL Harbert International wins $212.8M contract. U.S. Army Corps of Engineers $212.8M obligated now work through Sep 17, 2030.
2025-12-18 W912GB-26-D-A024 Conti Federal Services, LLC $495.0M Dec 17, 2030 Conti Federal Services and 6 others share $495.0M order for each order of the $495,000,000 firm-fixed-price contract for design-build. U.S. ...
2025-12-17 W912GB-26-D-A023 HGS Engineering $49.0M Sep 26, 2030 HGS Engineering wins $49.0M contract for environmental compliance and hazardous materials/hazardous waste management services. U.S. Army Cor...
2025-12-01 W912GB-26-D-0017 AECOM International Inc $45.0M Dec 31, 2030 AECOM International and 5 others share $45.0M order for each order of the $45,000,000 firm-fixed-price contract for architecture-engineering...
2025-12-01 W912GB-26-D-0012 AECOM International Inc $45.0M Dec 31, 2030 AECOM International and 3 others share $45.0M order for each order of the $45,000,000 firm-fixed-price contract for architecture-engineering...
2025-09-29 W912GB-25-D-A007 Arcadis Germany GMBH $49.0M Sep 29, 2030 Arcadis Germany GmbH and 3 others share $49.0M order for each order of the $49,000,000 firm-fixed-price contract for multi-media compliance....

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for W912GB-26-F-A073

Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗

Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.