1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912HN-24-D-2007 (unhyphenated: W912HN24D2007) |
|---|---|
| Prime Contractor (Awardee) |
Stantec Consulting Services Inc
FY2024-FY2026 Federal Defense Portfolio: $25.9M obligated across 23 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $240,000,000 |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2024-05-31, latest FPDS action 2024-09-26) · 8 Issued Delivery/Task Order(s) totaling $11,684,588 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912HN: W074 ENDIST SAVANNAH |
| Competition & Contract Structure | COMPETITION NOT STATED · Indefinite Delivery Contract (IDIQ) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC C219 (Architect And Engineering- General: Other) · NAICS 541330 (Engineering Services) |
| Work Locations & Funding | Determined at the contract or task-order level |
| Estimated Completion Date | See order schedule |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
USAspending / FPDS Transaction Description (Contract W912HN24D2007)
A-e general design
3. Subcontractor, Supply Chain & Capture Intelligence
For Tier-2 / Tier-3 Subcontractors & Suppliers
Subcontracting & Material Supply Window
- Prime Awardee: Stantec Consulting Services Inc
- Delivery Runway: Active through multi-year ordering period
- Requirement Scope: A-e general design
- Federal Supply Class: PSC C219 (Architect And Engineering- General: Other)
- BD Action: Reference Prime Contract W912HN-24-D-2007 when contacting Stantec Consulting Services Inc Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers
Buying Command & Recompete Posture
- Buying Command: W912HN (W074 ENDIST SAVANNAH)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912HN-24-D-2007 (8 shown, $11.7M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W912HN25F2002 | $4.5M | Stantec Consulting Services Inc | 2024-12-19 / 2026-03-16 | 2027-08-31 | 35% desgin aircraft maintenance hangar |
| W912HN26FA041 | $2.7M | Stantec Consulting Services Inc | 2026-05-07 / 2026-05-07 | 2027-08-04 | The work to be performed is to prepare project scope and cost validation reports and a full design package for the renovation and repair of building 212 fort stewart, ga. **see specific instructions for further details. |
| W912HN24F2044 | $1.5M | Stantec Consulting Services Inc | 2024-09-26 / 2025-11-25 | 2027-01-12 | Architect & engineering for building bridges structures that provide military load classification (mlc) 120t (tracked)/ 150w (wheeled), a clear width of 16 feet, and a lifespan of 75 years for vehicular traffic at fort liberty, nc. |
| W912HN24F2050 | $1.1M | Stantec Consulting Services Inc | 2024-09-29 / 2025-06-17 | 2026-03-31 | Renovation of bldg. 8-1221 |
| W912HN25FA026 | $821K | Stantec Consulting Services Inc | 2025-09-18 / 2025-12-18 | 2027-06-23 | Design services for bridge u4 repair |
| W912HP26FA042 | $723K | Stantec Consulting Services Inc | 2026-01-29 / 2026-02-03 | 2027-01-28 | Fy26 north myrtle beach landslide stormwater consolidation design, myrtle beach, sc |
| W912HN25FA018 | $374K | Stantec Consulting Services Inc | 2025-09-03 / 2025-09-03 | 2027-02-25 | Design build rfp development- repair bldg 518 |
| W912HN24F2024 | $0 | Stantec Consulting Services Inc | 2024-07-28 / 2025-04-03 | 2024-08-27 | Minimum guarantee |
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Stantec Consulting Services Inc Supply Chain / Small Business Liaison referencing contract W912HN-24-D-2007.
Recent Contract Actions from Buying Office W912HN (W074 ENDIST SAVANNAH)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-30 | W912HN-26-D-A019 | Bates Engineers/contractors Inc | $400.0M | Sep 30, 2031 | Bates Engineers/Contractors and 6 others share $400.0M order for each order of the $400,000,000 firm-fixed-price, indefinite-delivery/indefi... |
| 2026-09-25 | W912HN-26-D-A018 | R. Ward & Associates | $49.0M | Sep 24, 2031 | R. Ward & Associates wins $49.0M contract for support the Western Hemisphere Command Sustainable Range Program. U.S. Army Corps of Engineers... |
| 2026-09-04 | W912HN-26-C-A030 | Global Go | $37.9M | Dec 22, 2028 | Global Go wins $37.9M contract for a $37,850,000 firm-fixed-price contract to repair failed. U.S. Army Corps of Engineers $37.9M obligated n... |
| 2026-08-12 | W912HN-26-C-A027 | Marinex Construction | $33.1M | Nov 30, 2027 | Marinex Construction wins $33.1M contract for maintenance dredging and related construction services, including furnishing personnel. U.S. A... |
| 2026-07-15 | W912HN-26-C-A025 | Marinex Construction | $19.1M | Jul 15, 2027 | Marinex Construction gets $19.1M modification for Brunswick Harbor modification project, including expansion. U.S. Army Corps of Engineers $... |
| 2026-06-30 | W912HN-26-D-A010 | WSP USA Inc | $49.0M | Jun 30, 2031 | WSP USA and 4 others share $49.0M order for each order of the $49,000,000 firm-fixed-price contract for disaster response. U.S. Army Corps o... |
| 2026-06-18 | W912HN-26-D-A014 | - | $40.0M | Jun 17, 2033 | BHATE-Bay West JV wins $40.0M contract for optimized remediation. U.S. Army Corps of Engineers work through Jun 17, 2033 small business. |
| 2026-03-30 | W912HN-26-C-A022 | BL Harbert International | $124.8M | Apr 5, 2029 | BL Harbert International wins $124.8M contract for construction of new Unaccompanied Enlisted Personnel Housing barracks. U.S. Army Corps of... |
Other Recent Department of War Awards to Stantec Consulting Services Inc
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2025-12-22 | W91237-26-D-A007 | Army | $49.0M | Dec 30, 2030 | Stantec Consulting Services wins $49.0M contract for geotechnical services. U.S. Army Corps of Engineers work through Dec 30, 2030. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)
Pre-Filled FOIA Request Letter for W912HN-24-D-2007
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.