AwardTape / Contracts / W912HY-24-C-0009
W912HY-24-C-0009: $22.5M Department of the Army Award to Orion Marine Construction, Inc
Corpus christi ship channel, texas, inner basin to viola, maintenance dredging. schedule no. 1 consists of dredging approximately 2.5 million cubic yards 3 options total an additional 640,000 cubic yards.. Contracting activity: W076 ENDIST GALVESTON. Estimated completion: 2025-10-10.
$22.5M contract action / $29.3M cumulative ceiling / COMPETITION NOT STATED / 2025-10-10 completion / W912HY W076 ENDIST GALVESTON
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912HY-24-C-0009 (unhyphenated: W912HY24C0009) |
|---|---|
| Prime Contractor (Awardee) |
Orion Marine Construction, Inc
(Texas)
FY2024-FY2026 Federal Defense Portfolio: $153.0M obligated across 13 contracts
|
| Obligated Amount | $22,517,680 ($22.5M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $29,271,680 |
| USAspending / FPDS Obligation History | Base Record Obligated: $22,517,680 (signed 2024-09-26, latest FPDS action 2025-11-03) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912HY: W076 ENDIST GALVESTON |
| Competition & Contract Structure | COMPETITION NOT STATED · Definitive Contract / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z1KF (Maintenance Of Dredging Facilities) · NAICS 237990 (Other Heavy And Civil Engineering Construction) |
| Work Locations & Funding | Primary Place of Performance: Texas |
| Estimated Completion Date | 2025-10-10 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Corpus christi ship channel, texas, inner basin to viola, maintenance dredging. schedule no. 1 consists of dredging approximately 2.5 million cubic yards 3 options total an additional 640,000 cubic yards.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Orion Marine Construction, Inc
- Delivery Runway: Active through 2025-10-10
- Requirement Scope: Corpus christi ship channel, texas, inner basin to viola, maintenance dredging. schedule no. 1 consists of dredging approximately 2.5 million cubic yards 3 options total an additional 640,000 cubic yards.
- Federal Supply Class: PSC Z1KF (Maintenance Of Dredging Facilities)
- BD Action: Reference Prime Contract W912HY-24-C-0009 when contacting Orion Marine Construction, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912HY (W076 ENDIST GALVESTON)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W912HY (W076 ENDIST GALVESTON)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-25 | W912HY-26-C-A037 | Matthews Brothers Dredging | $16.1M | Apr 9, 2027 | Matthews Brothers Dredging wins $16.1M contract for maintenance dredging. U.S. Army Corps of Engineers $16.1M obligated now work through Apr... |
| 2026-09-22 | W912HY-26-C-A031 | Mike Hooks | $22.1M | Dec 14, 2027 | Mike Hooks wins $22.1M contract for maintenance dredging of a waterway. U.S. Army Corps of Engineers $22.1M obligated now work through Dec 1... |
| 2026-09-21 | W912HY-26-C-A028 | Affolter Contracting | $11.8M | Dec 22, 2027 | Affolter Contracting wins $11.8M contract for Corpus Christi Ship Channel placement area inner harbor improvements. U.S. Army Corps of Engin... |
| 2026-09-11 | W912HY-26-C-A030 | Ahtna Construction & Primary Products | $9.7M | Nov 9, 2027 | Ahtna Construction & Primary Products wins $9.7M contract for a $9,669,500 firm-fixed-price contract to perform a dike raise. U.S. Army Corp... |
| 2026-09-11 | W912HY-26-C-A029 | Manson Construction | $9.4M | Mar 31, 2027 | Manson Construction wins $9.4M contract for a $9,387,750 firm-fixed-price contract to perform maintenance dredging of the Brazos Island. U.S... |
| 2026-08-03 | W912HY-26-D-A022 | - | $95.0M | Aug 3, 2031 | Callan Marine and 8 others share $95.0M order for each order of the $95,000,000 firm-fixed-price contract. U.S. Army Corps of Engineers work... |
| 2026-07-31 | W912HY-26-D-A018 | The Dutra Group | $95.0M | Jul 31, 2031 | Dutra Group and 3 others share $95.0M order for each order of the $95,000,000 firm-fixed-price contract. U.S. Army Corps of Engineers work t... |
| 2026-07-21 | W912HY-26-C-A024 | Muddy Water Dredging | $10.2M | Dec 18, 2026 | Muddy Water Dredging wins $10.2M contract for Gulf Intracoastal Waterway dredging with beneficial use of sediment pipeline placement. U.S. A... |
Other Recent Department of War Awards to Orion Marine Construction, Inc
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-03-23 | W912P8-26-C-A010 | Army | $11.9M | Nov 23, 2026 | Orion Marine Construction wins $11.9M contract for pipeline maintenance dredging of the Matagorda Ship Channel from Peninsula to Point Comfo... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912HY-24-C-0009
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗