AwardTape / Contracts / W912HY-26-D-A007
W912HY-26-D-A007: Department of the Army Award to Mge Engineering, Inc
Multiple task order contract (matoc) for architect and engineering (ae) services to support the planning, engineering and engineering during construction, u.s. ARMY corps of engineers (usace), southwestern division (swd), galveston .... Contracting activity: W076 ENDIST GALVESTON.
$900.0M cumulative ceiling / COMPETITION NOT STATED IDIQ / W912HY W076 ENDIST GALVESTON
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912HY-26-D-A007 (unhyphenated: W912HY26DA007) |
|---|---|
| Prime Contractor (Awardee) |
Mge Engineering, Inc
FY2024-FY2026 Federal Defense Portfolio: $1.0M obligated across 8 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $900,000,000 |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2025-12-08, latest FPDS action 2025-12-08) · 2 Issued Delivery/Task Order(s) totaling $2,500 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912HY: W076 ENDIST GALVESTON |
| Competition & Contract Structure | COMPETITION NOT STATED · Indefinite Delivery Contract (IDIQ) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC C212 (Architect And Engineering- General: Engineering Drafting, Not Cad/Cam) · NAICS 541330 (Engineering Services) |
| Work Locations & Funding | Determined at the contract or task-order level |
| Estimated Completion Date | See order schedule |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Multiple task order contract (matoc) for architect and engineering (ae) services to support the planning, engineering and engineering during construction, u.s. ARMY corps of engineers (usace), southwestern division (swd), galveston ...
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Mge Engineering, Inc
- Delivery Runway: Active through multi-year ordering period
- Requirement Scope: Multiple task order contract (matoc) for architect and engineering (ae) services to support the planning, engineering and engineering during construction, u.s. ARMY corps of engineers (usace), southwestern division (swd), galveston ...
- Federal Supply Class: PSC C212 (Architect And Engineering- General: Engineering Drafting, Not Cad/Cam)
- BD Action: Reference Prime Contract W912HY-26-D-A007 when contacting Mge Engineering, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912HY (W076 ENDIST GALVESTON)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912HY-26-D-A007 (2 shown, $3K obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W912HY26FA008 | $3K | Mge Engineering, Inc | 2025-12-08 / 2025-12-08 | 2033-12-07 | Iaw far clause 52.216-19 - order limitations, the minimum guarantee is $2,500.00 for each matoc awarded |
| W912HY26FA016 | $0 | Mge Engineering, Inc | 2025-12-08 / 2025-12-09 | 2033-12-07 | Iaw far clause 52.216-19 - order limitations, the minimum guarantee is $2,500.00 for each matoc awarded |
Recent Contract Actions from Buying Office W912HY (W076 ENDIST GALVESTON)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-25 | W912HY-26-C-A037 | Matthews Brothers Dredging | $16.1M | Apr 9, 2027 | Matthews Brothers Dredging wins $16.1M contract for maintenance dredging. U.S. Army Corps of Engineers $16.1M obligated now work through Apr... |
| 2026-09-22 | W912HY-26-C-A031 | Mike Hooks | $22.1M | Dec 14, 2027 | Mike Hooks wins $22.1M contract for maintenance dredging of a waterway. U.S. Army Corps of Engineers $22.1M obligated now work through Dec 1... |
| 2026-09-21 | W912HY-26-C-A028 | Affolter Contracting | $11.8M | Dec 22, 2027 | Affolter Contracting wins $11.8M contract for Corpus Christi Ship Channel placement area inner harbor improvements. U.S. Army Corps of Engin... |
| 2026-09-11 | W912HY-26-C-A030 | Ahtna Construction & Primary Products | $9.7M | Nov 9, 2027 | Ahtna Construction & Primary Products wins $9.7M contract for a $9,669,500 firm-fixed-price contract to perform a dike raise. U.S. Army Corp... |
| 2026-09-11 | W912HY-26-C-A029 | Manson Construction | $9.4M | Mar 31, 2027 | Manson Construction wins $9.4M contract for a $9,387,750 firm-fixed-price contract to perform maintenance dredging of the Brazos Island. U.S... |
| 2026-08-03 | W912HY-26-D-A022 | - | $95.0M | Aug 3, 2031 | Callan Marine and 8 others share $95.0M order for each order of the $95,000,000 firm-fixed-price contract. U.S. Army Corps of Engineers work... |
| 2026-07-31 | W912HY-26-D-A018 | The Dutra Group | $95.0M | Jul 31, 2031 | Dutra Group and 3 others share $95.0M order for each order of the $95,000,000 firm-fixed-price contract. U.S. Army Corps of Engineers work t... |
| 2026-07-21 | W912HY-26-C-A024 | Muddy Water Dredging | $10.2M | Dec 18, 2026 | Muddy Water Dredging wins $10.2M contract for Gulf Intracoastal Waterway dredging with beneficial use of sediment pipeline placement. U.S. A... |
Other Recent Department of War Awards to Mge Engineering, Inc
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-08-25 | W912P7-26-C-A023 | Army | $10.2M | Feb 26, 2031 | MGE Engineering gets $10.2M modification for levee and floodwall design of reaches two and three of the Pajaro River. U.S. Army Corps of Eng... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912HY-26-D-A007
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗