Task order for minimum guarantee under the multiple award task order contract (matoc) for design-bid-build (dbb) marine construction within the u.s. ARMY corps of engineers (usace) lakes districts (buffalo, chicago, detroit) mission .... Contracting activity: W072 ENDIST BUFFALO. Estimated completion: 2028-01-31.
COMPETITION NOT STATED / 2028-01-31 completion / W912P4 W072 ENDIST BUFFALO
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912P4-23-F-0004 (unhyphenated: W912P423F0004) · Parent Vehicle: W912P4-23-D-0003 |
|---|---|
| Prime Contractor (Awardee) |
Great Lakes Dock and Materials, L.l.c
(New York)
FY2024-FY2026 Federal Defense Portfolio: $88.2M obligated across 26 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| USAspending / FPDS Obligation History | Base Record Obligated: -$5,000 (signed 2023-02-01, latest FPDS action 2024-06-24) · 13 Issued Delivery/Task Order(s) totaling $66,562,746 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912P4: W072 ENDIST BUFFALO |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Y1PZ (Construction Of Other Non-Building Facilities) · NAICS 237990 (Other Heavy And Civil Engineering Construction) |
| Work Locations & Funding | Primary Place of Performance: New York |
| Estimated Completion Date | 2028-01-31 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Task order for minimum guarantee under the multiple award task order contract (matoc) for design-bid-build (dbb) marine construction within the u.s. ARMY corps of engineers (usace) lakes districts (buffalo, chicago, detroit) mission ...
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Great Lakes Dock and Materials, L.l.c
- Delivery Runway: Active through 2028-01-31
- Requirement Scope: Task order for minimum guarantee under the multiple award task order contract (matoc) for design-bid-build (dbb) marine construction within the u.s. ARMY corps of engineers (usace) lakes districts (buffalo, chicago, detroit) mission ...
- Federal Supply Class: PSC Y1PZ (Construction Of Other Non-Building Facilities)
- BD Action: Reference Prime Contract W912P4-23-F-0004 when contacting Great Lakes Dock and Materials, L.l.c Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912P4 (W072 ENDIST BUFFALO)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912P4-23-F-0004 (13 shown, $66.6M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W912P424F0050 | $11.3M | Great Lakes Dock and Materials, L.l.c | 2024-09-24 / 2026-05-14 | 2026-10-30 | Fy24 bird island pier repair |
| W912P424F0035 | $10.2M | Great Lakes Dock and Materials, L.l.c | 2024-08-26 / 2024-08-27 | 2026-11-28 | Fy 24 lorain west breakwater repair |
| W912P424F0022 | $9.2M | Great Lakes Dock and Materials, L.l.c | 2024-06-25 / 2026-02-10 | 2026-07-31 | Armor stone |
| W912P425FA004 | $9.1M | Great Lakes Dock and Materials, L.l.c | 2025-02-28 / 2025-08-26 | 2026-11-07 | This project involves the operations and maintenance of the oswego west breakwater repair. |
| W912P424F0026 | $7.3M | Great Lakes Dock and Materials, L.l.c | 2024-07-16 / 2026-06-04 | 2026-05-11 | Great sodus breakwater repair |
| W912P424F0019 | $7.0M | Great Lakes Dock and Materials, L.l.c | 2024-06-03 / 2025-10-29 | 2025-08-04 | Fy24 cleveland west pier repair |
| W912P424F0043 | $6.7M | Great Lakes Dock and Materials, L.l.c | 2024-09-23 / 2025-12-30 | 2026-07-06 | Harbor repair |
| W912P425FA023 | $3.8M | Great Lakes Dock and Materials, L.l.c | 2025-06-27 / 2025-06-27 | 2026-10-20 | Work includes placement of armor stone, underlayer, and stone fill to raise the perimeter wall at the buffalo, ny confined disposal facility (cdf), along with incidental related work. |
| W912P424F0039 | $2.2M | Great Lakes Dock and Materials, L.l.c | 2024-09-04 / 2024-09-04 | 2025-12-05 | Fy24 buffalo south breakwater repair |
| W912P426FA007 | $1.9M | Great Lakes Dock and Materials, L.l.c | 2026-03-05 / 2026-03-05 | 2026-10-14 | Dunkirk breakwater repair phase 2 |
| W912P425FA024 | $0 | Great Lakes Dock and Materials, L.l.c | 2025-07-16 / 2025-07-29 | 2025-10-31 | W81eu651785013 |
| W912P423F0013 | -$543K | Great Lakes Dock and Materials, L.l.c | 2023-04-23 / 2025-11-07 | 2025-08-29 | Mob and demob |
| W912P423F0046 | -$1.6M | Great Lakes Dock and Materials, L.l.c | 2023-08-29 / 2025-12-11 | 2025-10-13 | Armor stone |
Recent Contract Actions from Buying Office W912P4 (W072 ENDIST BUFFALO)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-28 | W912P4-26-D-A001 | - | $249.0M | Sep 27, 2036 | SA Environmental II wins $249.0M contract for environmental remediation and support services. U.S. Army Corps of Engineers work through Sep ... |
| 2026-09-25 | W912P4-26-C-A016 | - | $39.3M | Sep 14, 2029 | Walsh Services Solutions wins $39.3M contract for a $39,304,987 firm-fixed-price contract to perform maintenance dredging. U.S. Army Corps o... |
| 2026-08-03 | W912P4-26-D-A005 | Morrish-Wallace Construction | $20.0M | Aug 2, 2028 | Morrish-Wallace Construction wins $20.0M contract for Toledo Harbor/River dredging. U.S. Army Corps of Engineers work through Aug 2, 2028 sm... |
| 2026-04-14 | W912P4-26-C-A007 | DMYLES | $11.7M | Nov 9, 2026 | DMYLES wins $11.7M contract for dredging approximately 250,000 cubic yards of material from Cleveland Harbor during spring. U.S. Army Corps ... |
| 2026-03-16 | W912P4-26-C-A003 | Dean Marine and Excavating | $10.2M | Sep 15, 2028 | Dean Marine and Excavating wins $10.2M contract for repair and rehabilitation of the Lorain Harbor West Breakwater. U.S. Army Corps of Engin... |
Other Recent Department of War Awards to Great Lakes Dock and Materials, L.l.c
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2025-09-10 | W911XK-25-C-A034 | Army | $9.3M | Oct 30, 2027 | Great Lakes Dock and Materials wins $9.3M contract for marine construction Bids were solicited via the web with three received. U.S. Army Co... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912P4-23-F-0004
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗