AwardTape / Contracts / W912P7-23-C-0003
W912P7-23-C-0003: Department of the Army Award to Ama Diversified Construction Group
The contractor shall provide all personnel, equipment, material, and other resources required to remove and dispose of material and infrastructure damaged or destroyed by the hopkins fire at lake mendocino.. Contracting activity: W075 ENDIST SAN FRAN. Estimated completion: 2024-04-05.
$3.3M cumulative ceiling / COMPETITION NOT STATED / 2024-04-05 completion / W912P7 W075 ENDIST SAN FRAN
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912P7-23-C-0003 (unhyphenated: W912P723C0003) |
|---|---|
| Prime Contractor (Awardee) |
Ama Diversified Construction Group
(California)
FY2024-FY2026 Federal Defense Portfolio: $2.6M obligated across 11 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $3,294,945 |
| USAspending / FPDS Obligation History | Base Record Obligated: -$3 (signed 2023-01-03, latest FPDS action 2024-04-05) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912P7: W075 ENDIST SAN FRAN |
| Competition & Contract Structure | COMPETITION NOT STATED · Definitive Contract / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2PA (Repair Or Alteration Of Recreation Facilities (Non-Building)) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: California |
| Estimated Completion Date | 2024-04-05 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The contractor shall provide all personnel, equipment, material, and other resources required to remove and dispose of material and infrastructure damaged or destroyed by the hopkins fire at lake mendocino.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Ama Diversified Construction Group
- Delivery Runway: Active through 2024-04-05
- Requirement Scope: The contractor shall provide all personnel, equipment, material, and other resources required to remove and dispose of material and infrastructure damaged or destroyed by the hopkins fire at lake mendocino.
- Federal Supply Class: PSC Z2PA (Repair Or Alteration Of Recreation Facilities (Non-Building))
- BD Action: Reference Prime Contract W912P7-23-C-0003 when contacting Ama Diversified Construction Group Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912P7 (W075 ENDIST SAN FRAN)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W912P7 (W075 ENDIST SAN FRAN)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-16 | W912P7-26-D-A004 | - | $90.0M | Sep 15, 2031 | Baird-Stantec JV Two and 3 others share $90.0M order for each order of the $90,000,000 firm-fixed-price contract. Army Corps of Engineers wo... |
| 2026-08-25 | W912P7-26-C-A023 | MGE Engineering | $10.2M | Feb 26, 2031 | MGE Engineering gets $10.2M modification for levee and floodwall design of reaches two and three of the Pajaro River. U.S. Army Corps of Eng... |
| 2026-07-13 | W912P7-26-C-A019 | Manson Construction | $12.9M | Jan 12, 2027 | Manson Construction wins $12.9M contract for Oakland Inner and Outer Harbor fiscal 2026 maintenance dredging project. U.S. Army Corps of Eng... |
| 2026-06-09 | W912P7-26-D-A001 | - | $60.0M | Jun 14, 2031 | Montezuma Wetlands wins $60.0M contract for offloading and placement of dredged material services at the Montezuma Wetlands Restoration. U.S... |
| 2026-03-23 | W912P7-26-C-A006 | Manson Construction | $26.0M | Dec 15, 2026 | Manson Construction wins $26.0M contract for routine maintenance dredging. U.S. Army Corps of Engineers $26.0M obligated now work through De... |
| 2025-12-05 | W912P7-26-C-A006 | Manson Construction | $23.1M | Apr 26, 2026 | Manson Construction wins $23.1M contract for fiscal 2025 maintenance dredging of the Oakland Inner. U.S. Army Corps of Engineers $23.1M obli... |
| 2025-09-19 | W912P7-25-C-A025 | CAM-DUTRA JV-II | $9.2M | Jan 13, 2026 | CAM-DUTRA JV-II wins $9.2M contract for annual maintenance dredging. U.S. Army Corps of Engineers $9.2M obligated now work through Jan 13, 2... |
| 2025-09-05 | W912P7-25-C-A018 | Granite Construction | $39.3M | Sep 11, 2027 | Granite Construction wins $39.3M contract for levee and floodwall construction. U.S. Army Corps of Engineers $39.3M obligated now work throu... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912P7-23-C-0003
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗