W912QR-23-F-0378: Department of the Army Award to Michael Baker International, Inc
A/e planning services in support of arimd, to prepare an area development plan (adp) update, updating what was delivered in the 2015 ft. mccoy installation development plan (idp).. Contracting activity: W072 ENDIST LOUISVILLE. Estimated completion: 2026-06-30.
$1.0M cumulative ceiling / COMPETITION NOT STATED / 2026-06-30 completion / W912QR W072 ENDIST LOUISVILLE
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912QR-23-F-0378 (unhyphenated: W912QR23F0378) · Parent Vehicle: W912QR-21-D-0024 |
|---|---|
| Prime Contractor (Awardee) |
Michael Baker International, Inc
(Wisconsin)
FY2024-FY2026 Federal Defense Portfolio: $59.4M obligated across 66 contracts
|
| Obligated Amount | Order-Dependent / TBD |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $1,044,956 |
| USAspending / FPDS Obligation History | Base Record Obligated: $0 (signed 2023-09-14, latest FPDS action 2025-12-29) · 5 Issued Delivery/Task Order(s) totaling $9,273,544 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912QR: W072 ENDIST LOUISVILLE |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC C219 (Architect And Engineering- General: Other) · NAICS 541330 (Engineering Services) |
| Work Locations & Funding | Primary Place of Performance: Wisconsin |
| Estimated Completion Date | 2026-06-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
A/e planning services in support of arimd, to prepare an area development plan (adp) update, updating what was delivered in the 2015 ft. mccoy installation development plan (idp).
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Michael Baker International, Inc
- Delivery Runway: Active through 2026-06-30
- Requirement Scope: A/e planning services in support of arimd, to prepare an area development plan (adp) update, updating what was delivered in the 2015 ft. mccoy installation development plan (idp).
- Federal Supply Class: PSC C219 (Architect And Engineering- General: Other)
- BD Action: Reference Prime Contract W912QR-23-F-0378 when contacting Michael Baker International, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912QR (W072 ENDIST LOUISVILLE)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912QR-23-F-0378 (5 shown, $9.3M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W912QR24F0185 | $5.0M | Michael Baker International, Inc | 2024-06-28 / 2026-04-10 | 2029-10-31 | Base - fort knox asf 35% - final |
| W912QR24F0014 | $2.8M | Michael Baker International, Inc | 2023-11-20 / 2026-01-27 | 2027-08-16 | Army reserve aeto for ae design- new castle pa |
| W912QR23F0147 | $1.1M | Michael Baker International, Inc | 2023-04-26 / 2023-12-20 | 2025-12-31 | Ae services for design of ast barracks at parks reserve forces training area |
| W912DY23F0063 | $256K | Michael Baker International, Inc | 2023-03-13 / 2026-03-30 | 2025-09-30 | Conroe arc microgrid, base scope |
| W912QR24F0064 | $126K | Michael Baker International, Inc | 2024-02-22 / 2024-02-22 | 2024-07-31 | Leed support for in-house design of collective training officers quarters at ft mccoy, wi |
Recent Contract Actions from Buying Office W912QR (W072 ENDIST LOUISVILLE)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-01 | W912QR-26-F-A317 | Howard W. Pence | $13.0M | Sep 19, 2028 | Howard W. Pence wins $13.0M contract for design-build construction services. U.S. Army Corps of Engineers signed Sep 30, 2026 work through S... |
| 2026-09-30 | W912QR-26-C-A047 | Alexandra Construction | $20.5M | Dec 21, 2029 | Alexandra Construction wins $20.5M contract for design-bid-build construction of a training building. U.S. Army Corps of Engineers $20.5M ob... |
| 2026-09-29 | W912QR-26-F-A264 | G & G Steel | $11.5M | Nov 8, 2030 | G & G Steel wins $11.5M contract for removal, fabrication, delivery, and installation of culvert valve assemblies. U.S. Army Corps of Engine... |
| 2026-09-29 | W912QR-26-C-A041 | - | $0 | - | Correction to an earlier Quanta Government Solutions award. . |
| 2026-09-29 | W912QR-26-C-A046 | - | $0 | - | Correction to an earlier Butt Construction award. . |
| 2026-09-28 | W912QR-26-C-A033 | Butt Construction | $17.5M | May 25, 2029 | Butt Construction wins $17.5M contract for design-bid-build construction of an aerospace ground equipment facility. U.S. Army Corps of Engin... |
| 2026-09-25 | W912QR-26-C-A040 | - | $99.7M | Jul 5, 2029 | Energy Resilience Partners wins $99.7M contract for a $99,660,705 firm-fixed-price contract to construct a microgrid and combined heat. U.S.... |
| 2026-09-25 | W912QR-26-C-A038 | L.S. Black Constructors | $28.2M | Jun 8, 2029 | L.S. Black Constructors wins $28.2M contract. U.S. Army Corps of Engineers $28.2M obligated now work through Jun 8, 2029. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912QR-23-F-0378
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗