Command Search (/)DoD & DHS Obligations $1.40T FY24-26Expiring Recompetes 300 $126.8BPalantir Maven 81.6% fill $637.6M / $781.3MAnduril Enterprise $20B IDIQUS Grid Queue 107.8 GW 523 projectsSanctions & UFLPA 432 entitiesContract RecordsUpdated Oct 26, 2026
AwardTape

AwardTape / Contracts / W912QR-25-F-A021

W912QR-25-F-A021: Department of the Army Award to Etrac, a Woolpert Company

Contractor must supply upgraded replacement gnss receivers to replace the four installed receivers on the two wicket lifters and two spares maintained by olmsted for a total of six units.. Contracting activity: W072 ENDIST LOUISVILLE. Estimated completion: 2025-04-14.

$78K cumulative ceiling / COMPETITION NOT STATED / 2025-04-14 completion / W912QR W072 ENDIST LOUISVILLE

1. Contract Summary & Primary Sources

Contract Number (PIID) W912QR-25-F-A021 (unhyphenated: W912QR25FA021) · Parent Vehicle: W912QR-20-A-0010
Prime Contractor (Awardee) Etrac, a Woolpert Company (Illinois)
FY2024-FY2026 Federal Defense Portfolio: $2.8M obligated across 30 contracts
Obligated Amount Order-Dependent / TBD
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $78,204
USAspending / FPDS Obligation History Base Record Obligated: $0 (signed 2025-02-28, latest FPDS action 2025-09-23) · 1 Issued Delivery/Task Order(s) totaling $78,204
Awarding Branch / Agency Department of the Army
Contracting Command & DoDAAC W912QR: W072 ENDIST LOUISVILLE
Competition & Contract Structure COMPETITION NOT STATED · BPA Call / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC M1NZ (Operation Of Other Utilities) · NAICS 811219 (Other Electronic And Precision Equipment Repair And Maintenance)
Work Locations & Funding Primary Place of Performance: Illinois
Estimated Completion Date 2025-04-14
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract W912QR25FA021)

Contractor must supply upgraded replacement gnss receivers to replace the four installed receivers on the two wicket lifters and two spares maintained by olmsted for a total of six units.

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: Etrac, a Woolpert Company
  • Delivery Runway: Active through 2025-04-14
  • Requirement Scope: Contractor must supply upgraded replacement gnss receivers to replace the four installed receivers on the two wicket lifters and two spares maintained by olmsted for a total of six units.
  • Federal Supply Class: PSC M1NZ (Operation Of Other Utilities)
  • BD Action: Reference Prime Contract W912QR-25-F-A021 when contacting Etrac, a Woolpert Company Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: W912QR (W072 ENDIST LOUISVILLE)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under W912QR-25-F-A021 (1 shown, $78K obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
W912QR25F0227 $78K Etrac, a Woolpert Company 2025-03-25 / 2025-03-25 2025-05-08 Trimble mps 566 gnss bpa call to replace 6 defective units.
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Etrac, a Woolpert Company Supply Chain / Small Business Liaison referencing contract W912QR-25-F-A021.

Recent Contract Actions from Buying Office W912QR (W072 ENDIST LOUISVILLE)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-10-01 W912QR-26-F-A317 Howard W. Pence $13.0M Sep 19, 2028 Howard W. Pence wins $13.0M contract for design-build construction services. U.S. Army Corps of Engineers signed Sep 30, 2026 work through S...
2026-09-30 W912QR-26-C-A047 Alexandra Construction $20.5M Dec 21, 2029 Alexandra Construction wins $20.5M contract for design-bid-build construction of a training building. U.S. Army Corps of Engineers $20.5M ob...
2026-09-29 W912QR-26-F-A264 G & G Steel $11.5M Nov 8, 2030 G & G Steel wins $11.5M contract for removal, fabrication, delivery, and installation of culvert valve assemblies. U.S. Army Corps of Engine...
2026-09-29 W912QR-26-C-A041 - $0 - Correction to an earlier Quanta Government Solutions award. .
2026-09-29 W912QR-26-C-A046 - $0 - Correction to an earlier Butt Construction award. .
2026-09-28 W912QR-26-C-A033 Butt Construction $17.5M May 25, 2029 Butt Construction wins $17.5M contract for design-bid-build construction of an aerospace ground equipment facility. U.S. Army Corps of Engin...
2026-09-25 W912QR-26-C-A040 - $99.7M Jul 5, 2029 Energy Resilience Partners wins $99.7M contract for a $99,660,705 firm-fixed-price contract to construct a microgrid and combined heat. U.S....
2026-09-25 W912QR-26-C-A038 L.S. Black Constructors $28.2M Jun 8, 2029 L.S. Black Constructors wins $28.2M contract. U.S. Army Corps of Engineers $28.2M obligated now work through Jun 8, 2029.

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for W912QR-25-F-A021

Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗

Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.