W912QR-26-C-A006: $11.6M Department of the Army Award to WRH
Dbb construction and repairs substation a at jmtc rock island arsenal, il. Contracting activity: W072 ENDIST LOUISVILLE. Estimated completion: Oct 2, 2027.
$11.6M contract action / $12.6M cumulative ceiling / COMPETITION NOT STATED / Oct 2, 2027 completion / W912QR W072 ENDIST LOUISVILLE
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912QR-26-C-A006 (unhyphenated: W912QR26CA006) |
|---|---|
| Prime Contractor (Awardee) |
WRH
(Illinois)
FY2024-FY2026 Federal Defense Portfolio: $13.8M obligated across 3 contracts
|
| Award / Modification Amount (2025-12-11) | $11,600,000 ($11.6M) |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $12,550,000 |
| USAspending / FPDS Obligation History | Base Record Obligated: $11,575,000 (signed 2025-12-11, latest FPDS action 2026-01-13) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912QR: W072 ENDIST LOUISVILLE |
| Competition & Contract Structure | COMPETITION NOT STATED · WRH wins $11.6M contract for design-bid-build construction and repair of Substation A at the Joint Manufacturing Technology. · Definitive Contract / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Y1NZ (Construction Of Other Utilities) · NAICS 237130 (Power And Communication Line And Related Structures Construction) |
| Work Locations & Funding | Primary Place of Performance: Illinois |
| Estimated Completion Date | Oct 2, 2027 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
WRH wins $11.6M contract for design-bid-build construction and repair of Substation A at the Joint Manufacturing Technology. U.S. Army Corps of Engineers $11.6M obligated now work through Oct 2, 2027.
Dbb construction and repairs substation a at jmtc rock island arsenal, il
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: WRH
- Delivery Runway: Active through Oct 2, 2027
- Requirement Scope: Dbb construction and repairs substation a at jmtc rock island arsenal, il
- Federal Supply Class: PSC Y1NZ (Construction Of Other Utilities)
- BD Action: Reference Prime Contract W912QR-26-C-A006 when contacting WRH Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912QR (W072 ENDIST LOUISVILLE)
- Acquisition Method: COMPETITION NOT STATED (WRH wins $11.6M contract for design-bid-build construction and repair of Substation A at the Joint Manufacturing Technology.)
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W912QR (W072 ENDIST LOUISVILLE)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-01 | W912QR-26-F-A317 | Howard W. Pence | $13.0M | Sep 19, 2028 | Howard W. Pence wins $13.0M contract for design-build construction services. U.S. Army Corps of Engineers signed Sep 30, 2026 work through S... |
| 2026-09-30 | W912QR-26-C-A047 | Alexandra Construction | $20.5M | Dec 21, 2029 | Alexandra Construction wins $20.5M contract for design-bid-build construction of a training building. U.S. Army Corps of Engineers $20.5M ob... |
| 2026-09-29 | W912QR-26-F-A264 | G & G Steel | $11.5M | Nov 8, 2030 | G & G Steel wins $11.5M contract for removal, fabrication, delivery, and installation of culvert valve assemblies. U.S. Army Corps of Engine... |
| 2026-09-29 | W912QR-26-C-A041 | - | $0 | - | Correction to an earlier Quanta Government Solutions award. . |
| 2026-09-29 | W912QR-26-C-A046 | - | $0 | - | Correction to an earlier Butt Construction award. . |
| 2026-09-28 | W912QR-26-C-A033 | Butt Construction | $17.5M | May 25, 2029 | Butt Construction wins $17.5M contract for design-bid-build construction of an aerospace ground equipment facility. U.S. Army Corps of Engin... |
| 2026-09-25 | W912QR-26-C-A040 | - | $99.7M | Jul 5, 2029 | Energy Resilience Partners wins $99.7M contract for a $99,660,705 firm-fixed-price contract to construct a microgrid and combined heat. U.S.... |
| 2026-09-25 | W912QR-26-C-A038 | L.S. Black Constructors | $28.2M | Jun 8, 2029 | L.S. Black Constructors wins $28.2M contract. U.S. Army Corps of Engineers $28.2M obligated now work through Jun 8, 2029. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912QR-26-C-A006
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗