AwardTape / Contracts / W91QVN-26-F-A002
W91QVN-26-F-A002: $490K Department of the Army Award to Sori E&c Co.,ltd
This requirement is for a complete life-cycle replacement of all hvac and ac equipment, compressors and duct pathways in bldg. p-895, camp humphreys.. Contracting activity: 0411 AQ HQ CONTRACT AUG. Estimated completion: 2026-09-30.
$490K contract action / $490K cumulative ceiling / COMPETITION NOT STATED / 2026-09-30 completion / W91QVN 0411 AQ HQ CONTRACT AUG
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W91QVN-26-F-A002 (unhyphenated: W91QVN26FA002) · Parent Vehicle: W91QVN-24-D-0035 |
|---|---|
| Prime Contractor (Awardee) |
Sori E&c Co.,ltd
FY2024-FY2026 Federal Defense Portfolio: $41.2M obligated across 75 contracts
|
| Obligated Amount | $490,421 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $490,421 |
| USAspending / FPDS Obligation History | Base Record Obligated: $490,421 (signed 2025-11-12, latest FPDS action 2025-11-12) · 12 Issued Delivery/Task Order(s) totaling $11,497,171 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W91QVN: 0411 AQ HQ CONTRACT AUG |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC N030 (Installation Of Equipment- Mechanical Power Transmission Equipment) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Determined at the contract or task-order level |
| Estimated Completion Date | 2026-09-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
This requirement is for a complete life-cycle replacement of all hvac and ac equipment, compressors and duct pathways in bldg. p-895, camp humphreys.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Sori E&c Co.,ltd
- Delivery Runway: Active through 2026-09-30
- Requirement Scope: This requirement is for a complete life-cycle replacement of all hvac and ac equipment, compressors and duct pathways in bldg. p-895, camp humphreys.
- Federal Supply Class: PSC N030 (Installation Of Equipment- Mechanical Power Transmission Equipment)
- BD Action: Reference Prime Contract W91QVN-26-F-A002 when contacting Sori E&c Co.,ltd Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W91QVN (0411 AQ HQ CONTRACT AUG)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W91QVN-26-F-A002 (12 shown, $11.5M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W91QVN24F0549 | $4.5M | Sori E&c Co.,ltd | 2024-08-15 / 2025-12-23 | 2026-08-31 | Repair building p-1603 and exterior area, usag humphreys |
| W91QVN25FA711 | $2.2M | Sori E&c Co.,ltd | 2025-09-18 / 2025-09-18 | 2026-09-14 | Repair and upgrade collier gym, p-1949 |
| W91QVN25FA776 | $1.3M | Sori E&c Co.,ltd | 2025-09-25 / 2026-04-16 | 2026-12-31 | Replace deteriorated ac, concrete curb and walking trail |
| W91QVN24F0423 | $1.1M | Sori E&c Co.,ltd | 2024-06-27 / 2024-06-27 | 2025-07-05 | Rpl oil w/gas s-2098 |
| W91QVN25FA743 | $616K | Sori E&c Co.,ltd | 2025-09-24 / 2025-09-24 | 2026-09-29 | This requirement is for a complete life-cycle replacement of all hvac and ac equipment, compressors and duct pathways in bldg. s-12409, camp humphreys. |
| W91QVN25FA748 | $525K | Sori E&c Co.,ltd | 2025-09-21 / 2026-01-12 | 2026-06-30 | Matoc to_replace leaky roof, fed bldg, p-12600, usag humphreys |
| W91QVN25FA756 | $377K | Sori E&c Co.,ltd | 2025-09-22 / 2026-01-12 | 2026-09-30 | Matoc to_project no. va-300000291361, repair roof, p-400, usag humphreys |
| W91QVN25FA692 | $256K | Sori E&c Co.,ltd | 2025-09-11 / 2025-09-11 | 2026-06-28 | Repair and re-coat worn out epdm surface layer and stepping pad in p-6400, usag humphreys |
| W91QVN25FA670 | $172K | Sori E&c Co.,ltd | 2025-09-04 / 2025-09-04 | 2026-07-31 | Repair and replace stormwater pumps at drainage basin s-522 |
| W91QVN25FA667 | $156K | Sori E&c Co.,ltd | 2025-09-09 / 2025-09-09 | 2026-03-30 | Project no. va-300000317365, replace floor heating pipe and repaint interior, p- 2092, usag humphreys |
| W91QVN25FA759 | $129K | Sori E&c Co.,ltd | 2025-09-23 / 2025-09-23 | 2026-05-31 | Project no. va-300000315553, repair poor drainage system and damaged pavement around bldg. 1020, usag humphreys |
| W91QVN24F0444 | $83K | Sori E&c Co.,ltd | 2024-07-03 / 2024-08-01 | 2025-01-31 | Repair alligator cracked and damaged road on key street to pacific victors ave at usag-humphreys. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W91QVN-26-F-A002
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗