No active exclusion found for this UEI, CAGE or legal name.
| Registration | Active / All awards / expires 2026-12-31 |
|---|---|
| Legal name | CONTINENTAL TIDE DEFENSE SYSTEMS, INC. |
| Address | 2 MERIDIAN BLVD, WYOMISSING, PA, 19610, USA / district 06 |
| Structure | Corporate entity (not tax exempt), incorporated in PA / in business since 2011-06-20 |
| NAICS | 541330 (+12 more) |
| API | registration JSON / SAM.gov record |
| Contract ID | Obligated (FY24+) | Type | Agency | Category | Description | Latest Action |
|---|---|---|---|---|---|---|
| N6449825F3064 | $3.8M | delivery order | Department of the Navy | Engineering and technical services | Item # 10: level of effort (loe) task order requirement lpd 17 class uninterruptible power supply (ups) reductions (east coast) sa82249 for lpd21 (uss new york) under the d40 equipment services mac (n6449824d4013-4023). | May 27, 2026 |
| N0025320F3010 | $3.8M | delivery order | Department of the Navy | Engineering and technical services | Alteration installation team (ait) support services | Jul 9, 2025 |
| N0016423CWM39 | $3.5M | definitive contract | Department of the Navy | Installation of equipment | Ship installation services | Nov 15, 2024 |
| N6449825F3024 | $2.4M | delivery order | Department of the Navy | Engineering and technical services | Installation services for hm&e condition systems (sa 94979) & hm&e testing support to be completed onboard uss porter (DDG-78). | Jul 29, 2025 |
| N6449823F3124 | $1.9M | delivery order | Department of the Navy | Engineering and technical services | Fy23, ac&r code 411 mac task order, #025/cnap CVN groom | May 21, 2026 |
| N6449823F3064 | $1.5M | delivery order | Department of the Navy | Engineering and technical services | The contractor shall provide engineering, technical, management, and logistics services required for the planning, installation, and testing for ship change documents (scd) 15667 and 15677 for lhd 8. | Apr 28, 2025 |
| N0025326F3001 | $1.5M | delivery order | Department of the Navy | Ship maintenance and repair | Alteration installation team (ait) services. | May 6, 2026 |
| N6449823F3061 | $1.5M | delivery order | Department of the Navy | Engineering and technical services | The contractor shall provide technical services to completely install the alterations scd 16395 on the uss kearsarge (lhd 3). the location for installation services is the norfolk naval shipyard, norfolk, va. | Oct 1, 2025 |
| N6449825F3034 | $1.5M | delivery order | Department of the Navy | Engineering and technical services | Program requires machalt program requires ma-742/scd-16603 DDG-51 class hangar bay lighting upgrade to be completed onboard various DDG-51 class hulls. | Mar 19, 2026 |
| N6449825F3049 | $1.5M | delivery order | Department of the Navy | Engineering and technical services | This requirement is for the u.s. navys DDG back fit modernization (ddgm bf), DDG tech refresh alterations which includes a combination of mcs (machinery control system), and dvss (digital video surveillance system) aboard uss the sullivans ... | May 5, 2026 |
| N6449825F3072 | $1.4M | delivery order | Department of the Navy | Engineering and technical services | Nswcpd code 523 requires engineering services, material support, field service support to modify the ship control system to upgrade to ship control system-government in accordance with ship change document (scd) 14052 onboard uss america ... | May 4, 2026 |
| N6449825F3008 | $1.4M | delivery order | Department of the Navy | Engineering and technical services | Nswcpd code 252 will require contractor support for the installation of the hull/mechanical & electrical (hm&e) condition system 2.0 onboard uss george washington (CVN 73) via sa 95241 and 92429. | Jun 3, 2025 |
| N6449825F3100 | $1.4M | delivery order | Department of the Navy | Engineering and technical services | Item 18: cost-plus-fixed-fee, level of effort type task order requirement to perform engineering and technical services for shore-based hesc conversion under the d40 equipment services mac (n6449824d4013-4023). | Apr 29, 2026 |
| N6449825F3046 | $1.3M | delivery order | Department of the Navy | Engineering and technical services | Lpd 17/21 uss san antonio/new york, shipalt (sa) 95528 hull mechanical and electrical (hm&e) condition system 2.0. | Apr 22, 2026 |
| N5005425FL021 | $1.3M | delivery order | Department of the Navy | Ship maintenance and repair | Uss fort lauderdale (lpd-28) em01 delivery order | Aug 7, 2025 |
| N6449823F3047 | $1.2M | delivery order | Department of the Navy | Engineering and technical services | Lpd 24 class uninterruptible power supply reduction | Jul 29, 2024 |
| N6449823F3087 | $1.1M | delivery order | Department of the Navy | Engineering and technical services | Naval surface warfare center philadelphia division (nswcpd) code 252 requires that scd 5013 be installed via alteration installation team (ait) in support of the us navys machalt program requires ma-513/scd-5013. | May 18, 2026 |
| N6449822F3140 | $1.1M | delivery order | Department of the Navy | Engineering and technical services | Fy22, ac&r code 411 mac task order, #014/CVN 78 assessment and groom services | May 18, 2026 |
| N6833525F0459 | $1.0M | delivery order | Department of the Navy | Installation of equipment | Removal of integrated launch and recovery television surveillance (ilarts) system and equipment, and installation of digital integrated launch and recovery television surveillance (dilarts) onboard uss gerald r. ford (CVN-78) | Sep 11, 2025 |
| N6449826F3029 | $1.0M | delivery order | Department of the Navy | Engineering and technical services | This requirement is for nswcpd code 251, which is responsible for installation of sa 288k onboard DDG 76. | Apr 29, 2026 |
| N6449823F3096 | $996K | delivery order | Department of the Navy | Engineering and technical services | New task order n6449823f3096 in the amount of $3,954,941.73 for fy23, ac&r code 411 mac task order, #023/division 41 blue collar test site | Jun 5, 2026 |
| N6449825F3058 | $960K | delivery order | Department of the Navy | Engineering and technical services | The naval surface warfare center philadelphia division (nswcpd), requires shipalt (sa) 94451 for the installation of the alfa laval pure bildge oil / water separator on the DDG 68 uss sullivan. | Apr 13, 2026 |
| N6449823F3075 | $919K | delivery order | Department of the Navy | Engineering and technical services | New task order | Jan 22, 2026 |
| N6833523F0415 | $783K | delivery order | Department of the Navy | Installation of equipment | Cvn-74 removal/installation/relocation of cass, ecass, epats, rtbs systems. | Sep 9, 2025 |
| N6449824F3114 | $761K | delivery order | Department of the Navy | Engineering and technical services | Nswcpd code 251 requires (shipalt) 288k aboard one (1) DDG-51 class ship.the shipalt provides structural, outfitting, ventilation, piping, and electrical system modifications to existing compartments to ensure the safe stowage of hazardous ... | May 18, 2026 |
| N6449823F3111 | $747K | delivery order | Department of the Navy | Engineering and technical services | Hull/mechanical & electrical (hm&e) condition system 2.0 onboard the uss shoup (DDG-86) | May 18, 2026 |
| N6449823F3113 | $740K | delivery order | Department of the Navy | Engineering and technical services | Services | May 18, 2026 |
| N6449823F3100 | $735K | delivery order | Department of the Navy | Engineering and technical services | Fy23, ac&r code 411 mac task order, #022/mcm ac care | May 18, 2026 |
| N6449825F3086 | $719K | delivery order | Department of the Navy | Engineering and technical services | Alteration installation team support services | Sep 8, 2025 |
| N6449824F3067 | $665K | delivery order | Department of the Navy | Engineering and technical services | The naval surface warfare center philadelphia division (nswcpd), in support of CVN 71 12850 legacy steering upgrade | Mar 19, 2025 |
| N6449823F3058 | $614K | delivery order | Department of the Navy | Engineering and technical services | The contractor shall provide technical services to completely install the alterations scd 14052 on the uss makin island (lhd 8). the location for installation services is the naval base san diego, san diego, ca. | Jul 22, 2025 |
| N6449824F3122 | $595K | delivery order | Department of the Navy | Engineering and technical services | The naval surface warfare center philadelphia division (nswcpd) code 252, sponsored by the pms 312 peo carriers, requires that scd 12850 and 19594.01 be installed on uss dwight d. eisenhower (CVN 69). | Oct 28, 2025 |
| N6449826FBB02 | $554K | delivery order | Department of the Navy | Engineering and technical services | Engineering and technical services, material, installation, and testing support services to accomplish the following DDG tech refresh alterations, during the planned installation, on the uss the mahan (DDG 72) in norfolk, va. | Jun 4, 2026 |
| N6449825F3087 | $541K | delivery order | Department of the Navy | Engineering and technical services | Code 251 requires alterations to be completed onboard uss okane (DDG 77). the contractor shall provide engineering and technical services, material, installation, and testing support services. | Jan 12, 2026 |
| N6449825F3071 | $512K | delivery order | Department of the Navy | Engineering and technical services | Alteration installation team services | Mar 13, 2026 |
| N6449824F3073 | $501K | delivery order | Department of the Navy | Engineering and technical services | Installation and technical services for upgrading hull, mechanical and electrical systems, deploying technologies to improve availability, reliability, ship mission readiness, decrease maintenance and workload requirements for systems and ... | Dec 15, 2025 |
| N6449826F3009 | $438K | delivery order | Department of the Navy | Engineering and technical services | Installation and testing support for ship control system. government and digital rudder angle transmitter hardware and software upgrades on 1 lsd class ship, lsd 52 uss pearl harbor. the following scds are applicable: scd 23554 and scd ... | Dec 23, 2025 |
| N6449824F3089 | $433K | delivery order | Department of the Navy | Engineering and technical services | Provide engineering services to support nswcpd implementation and testing of (scd) 16380 for the uss carter hall (lsd 50). the location for installation services is the norfolk shipyard (nsy), norfolk, va. | Mar 12, 2026 |
| N6449825F3061 | $428K | delivery order | Department of the Navy | Engineering and technical services | This requirement is for nswcpd code 252, which is responsible for the installation of ma-513/scd-5013, ma-573/scd-9954, ma-607/scd-3126, ma-682/scd-11635, ma-737/scd 26651, and se-2023-001 removal aboard us NAVY ships. | May 5, 2026 |
| N6449826F3026 | $410K | delivery order | Department of the Navy | Engineering and technical services | The contractor shall provide engineering services to support nswcpd implementation and testing of ship change document (scd) 16380 for the uss pearl harbor (lsd 52). | Apr 2, 2026 |
| N6449825F3043 | $361K | delivery order | Department of the Navy | Engineering and technical services | Item # 7: level of effort (loe) task order requirement for replacing dossert connectors on surface ships under the d40 equipment services mac (n6449824d4013-4023). | May 18, 2026 |
| N6449824F3038 | $333K | delivery order | Department of the Navy | Engineering and technical services | Ddg back fit modernization (ddgm bf) program requires alterations to be completed onboard uss paul hamilton (DDG 60), uss hopper (DDG 70), and uss daniel inouye (DDG 118). | Mar 28, 2025 |
| N6449825F3070 | $326K | delivery order | Department of the Navy | Engineering and technical services | Ship alterations (shipalt) sa 86950, and sa 31015 | Jul 1, 2025 |
| N6449824F3110 | $325K | delivery order | Department of the Navy | Engineering and technical services | Cg class ac&r care and harvesting | May 13, 2025 |
| N6449825F3047 | $315K | delivery order | Department of the Navy | Engineering and technical services | Scalable integrated bridge system (sibs) gen 3 tech refresh (tr): scd 31015, ais integration with command scd 24037, and NAVY ecdis scd 27011r1 and scd 27011r2 hm&e condition systems aboard lsd 49, lsc 51, lpd 20, lpd 25, and lcc 19. | May 15, 2025 |
| N6449825F3099 | $231K | delivery order | Department of the Navy | Engineering and technical services | Ma-688 to be completed onboard various DDG-51 class hulls. | Feb 4, 2026 |
| N6449825F3097 | $209K | delivery order | Department of the Navy | Engineering and technical services | Services | Sep 3, 2025 |
| N6449825F3085 | $196K | delivery order | Department of the Navy | Engineering and technical services | Support for NAVY ecdis software integration compatibility via gen 3 hw tech refresh on one (1) lsd class ship and NAVY ecdis software upgrade via scd 16950, scd 31015, and scd 27011rx. | Jul 31, 2025 |
| N6449826F3013 | $175K | delivery order | Department of the Navy | Engineering and technical services | Nswcpd code 543 requires engineering,technical,management,and logistics required for planning, installation, testing for ship change document (scd) 30801(upgrade hardware and operating system of existing scdn network management operator ... | Apr 13, 2026 |
| N5005425FL020 | $172K | delivery order | Department of the Navy | Ship maintenance and repair | Uss arlington (lpd-24) em01 award delivery order n0002422d4431 n5005425fl020 | Mar 27, 2025 |
| # | Parent Contract ID | Task Orders | Obligated (FY24+) | Vehicle Ceiling | Unused Ceiling | Description | Latest Order |
|---|---|---|---|---|---|---|---|
| 1 | N6449821D0021 | 48 | $23.0M | $2.4M | - | This requirement is for the u.s. navys DDG back fit modernization (ddgm bf), DDG tech refresh alterations which includes a combination of mcs (machinery control system), and dvss (digital video surveillance system) aboard uss the sullivans ... | Jun 4, 2026 |
| 2 | N6449824D4018 | 5 | $5.6M | $22.0M | $14.3M | Item 4: completion-type task order requirement for fabrication, test, repair, and fleet implementation of ship change document 81999 aboard uss wasp (lhd-1) during the selected restricted availability 4-1 (sra4-1). | May 27, 2026 |
| 3 | N0017819D7406 | 2 | $5.3M | $11.4M | $3.0M | Alteration installation team (ait) support services | May 6, 2026 |
| 4 | N6449821D0006 | 10 | $5.3M | $4.6M | - | New task order n6449823f3096 in the amount of $3,954,941.73 for fy23, ac&r code 411 mac task order, #023/division 41 blue collar test site | Jun 5, 2026 |
| 5 | N6449821D4025 | 7 | $3.6M | $3.8M | - | The contractor shall provide technical services to completely install the alterations scd 16395 on the uss kearsarge (lhd 3). the location for installation services is the norfolk naval shipyard, norfolk, va. | Mar 12, 2026 |
| 6 | N6833521D0225 | 3 | $1.8M | $2.2M | - | Sts removals ship install idiq mac task order | Sep 11, 2025 |
| 7 | N0002422D4431 | 2 | $1.4M | $1.3M | - | Uss fort lauderdale (lpd-28) em01 delivery order | Aug 7, 2025 |
| 8 | N6449821D0039 | 3 | $1.2M | $4.2M | - | Lpd 24 class uninterruptible power supply reduction | Jul 29, 2024 |
| 9 | N6833519G0011 | 1 | $156K | $3.3M | - | Alre ait do | Jun 3, 2025 |
| 10 | N0002422D4416 | 1 | $155K | $155K | - | Uss gonzalez (DDG-66) p5e2 | Sep 2, 2025 |
Unused ceiling is uncommitted capacity across available contract records, not guaranteed spending. Vehicle details summarize the largest 500 records.
| # | Agency | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Department of the Navy | 105 | $51.8M | 101% |
| 2 | Department of the Army | 1 | $0 | 0.0% |
| 3 | Defense Contract Management Agency | 2 | -$625K | -1.2% |
| # | Category | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Engineering and technical services | 83 | $42.4M | 83% |
| 2 | Installation of equipment | 7 | $5.4M | 11% |
| 3 | Ship maintenance and repair | 10 | $3.1M | 6.1% |
| 4 | Instruments and lab equipment | 3 | $94K | 0.2% |
| 5 | Fiber optics | 1 | $51K | 0.1% |
| 6 | Ship and marine equipment | 1 | $45K | 0.1% |
| 7 | Defense systems R&D | 1 | $0 | 0.0% |
| 8 | Electronics and comms maintenance | 1 | $0 | 0.0% |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.
Building an AI agent? Get this company profile as JSON: GET /api/agent/v1/companies/continental-tide-defense-systems. Schema, sample and price or start with free sample calls.