No active exclusion found for this UEI, CAGE or legal name.
| Registration | Active / All awards / expires 2027-07-27 |
|---|---|
| Legal name | MSAB/HCR JV, LLC |
| Address | 400 PERRY PKWY, PERRY, GA, 31069, USA / district 08 |
| Structure | Corporate entity (not tax exempt), incorporated in GA / in business since 2020-04-29 |
| NAICS | 236220 (+4 more) |
| API | registration JSON / SAM.gov record |
| Contract ID | Obligated (FY24+) | Type | Agency | Category | Description | Latest Action |
|---|---|---|---|---|---|---|
| W911SF26FA047 | $1.6M | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor will replace roof top units, make up air units, exhaust fans, vfds, obsolete hvac controls, and the existing lon controls trunk of b3200 with new bacnet controls/trunk and additional actions per ... | Jun 2, 2026 |
| W911SF24F0190 | $1.1M | delivery order | Department of the Army | New construction | Npp items, fitness center floors | Aug 28, 2025 |
| W911SF24F0111 | $932K | delivery order | Department of the Army | New construction | Replace roofs, bldgs 10, 11, & 12 | Apr 30, 2026 |
| FA670324F0003 | $716K | delivery order | Department of the Air Force | Equipment maintenance, other | Hvac repair bldg 729 | Feb 3, 2025 |
| W911SF24F0184 | $654K | delivery order | Department of the Army | New construction | Replace chillers bldgs 9160 & 9174 | Jan 28, 2026 |
| W911SF24F0134 | $610K | delivery order | Department of the Army | New construction | Replace hvac controls in bldg 4105 | Jan 28, 2026 |
| W911SF24F0180 | $500K | delivery order | Department of the Army | New construction | Repair int/ext, smart barracks, b9164 | Sep 28, 2025 |
| W911SF24F0185 | $349K | delivery order | Department of the Army | New construction | Install generators bldg 5881, 5891, 8810 | Apr 10, 2026 |
| W911SF25FA051 | $337K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the sow attached, contractor is to repair and improve raised and ground level loading dock elements as well as repair existing sidewalk. fill in asphalt apron and repave access road. | May 7, 2026 |
| FA670324F0031 | $335K | delivery order | Department of the Air Force | Equipment maintenance, other | Provide all labor, materials, travel, tools, services, equipment, and supervision necessary to complete the hvac and controls repairs for project fgwb 21-0010 repair b733 hvac controls dobbins arb | Oct 15, 2024 |
| W911SF25FA140 | $307K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the sow attached, bldg 128 (1918 club) repair work includes but not limited to, providing better floor drainage to the kitchen area and supporting rooms, dishwasher room expansion, and a new mop sink and side wall is to be installed. | May 13, 2026 |
| W911SF26FA038 | $284K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor will replace the hvac controls of buildings 2752, from lonworks to bacnet. | May 11, 2026 |
| W911SF26FA039 | $284K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor must replace the hvac controls of buildings 2754, from lonworks to bacnet. | May 14, 2026 |
| W911SF25FA142 | $228K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor shall provide and install emergency generator to the north side facility to meet resiliency needs (provide backup power to the elevator #3 in the building). | Sep 25, 2025 |
| W911SF26FA045 | $214K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor is to replace the hvac controls of buildings 2930 and 2931 from lonworks to bacnet. | May 29, 2026 |
| W911SF26FA025 | $205K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor will replace six (6) vehicle commercial bay doors (retractable bay doors) with the following new features identified per the sow. | May 6, 2026 |
| W911SF24F0132 | $176K | delivery order | Department of the Army | New construction | Repair int/ext for ada compliance, b66 | Apr 30, 2026 |
| FA670324F0029 | $174K | delivery order | Department of the Air Force | Equipment maintenance, other | The contractor shall provide all labor materials, travel, tools, services, equipment, and supervision necessary to replace the oil water separator at b731. | May 15, 2025 |
| W911SF24F0113 | $152K | delivery order | Department of the Army | New construction | Remove usts, bldg 301,2498,5881,9031 | Oct 9, 2024 |
| FA670324F0013 | $148K | delivery order | Department of the Air Force | Real property maintenance and repair | Repair manholes as identified in sow. | Aug 26, 2024 |
| W911SF25F0023 | $142K | delivery order | Department of the Army | New construction | Replace hvac building 9210 | Aug 22, 2025 |
| W911SF25FA015 | $112K | delivery order | Department of the Army | Real property maintenance and repair | The objective of this project and mechanical scope is to replace the remaining field controllers in building 2931 that were not addressed with a prior project. | Jun 8, 2025 |
| W911SF26FA042 | $103K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contractor will clean and repaint wetherby stage as well as a small amount of concrete work to replace rusted handrails and additional work per the sow. | May 15, 2026 |
| W911SF25FA020 | $101K | delivery order | Department of the Army | Real property maintenance and repair | Contractor shall demo existing 6ft chain link fence and replace with new 8ft chain link fence (8ft before fence topper is installed) with 1ft triple strand fence topper, two personnel gates, and two 10ft double swing gates. see attached ... | May 13, 2025 |
| W911SF25FA019 | $92K | delivery order | Department of the Army | Real property maintenance and repair | Repair copper wire cable between mh tw6-2 (near bldg 215) and mh8 (near bldg 65), repair the damaged duct bank near bldg 65, and repair the disrupted sidewalk and curb as specified during the job walk. in accordance with attached scope of ... | May 10, 2025 |
| W911SF26FA013 | $75K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contactor shall perform all work as described per the project documents, contract, drawings, specifications, and any addendum issued by the government for completion of this work | May 29, 2026 |
| FA670324F0004 | $68K | delivery order | Department of the Air Force | Plumbing, heating and waste disposal | Replace grease trap for county compliance | Apr 25, 2024 |
| W911SF25FA109 | $67K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the sow attached, contractor is to provide construction services for the renovation of the interior storage area on the north end of necs building 358. | Apr 17, 2026 |
| FA670324F0002 | $51K | delivery order | Department of the Air Force | Real property maintenance and repair | Bldg 755 ohd | Oct 23, 2023 |
| W911SF25FA021 | $47K | delivery order | Department of the Army | Real property maintenance and repair | The perimeter fencing of the lawson ARMY airfield (laaf) requires the removal of faded/damaged (warning) signs located on various points along the perimeter fenced structure. installation of newly fabricated (warning) signs per attached ... | May 16, 2025 |
| W911SF23F0142 | $46K | delivery order | Department of the Army | New construction | Joc oyii uchee creek decks, lofts, cabin | Dec 4, 2024 |
| FA670324F0030 | $45K | delivery order | Department of the Air Force | Real property maintenance and repair | Replace fuel tank and concrete pad, bldg 700 fgwb 24-0004 | Feb 25, 2025 |
| W911SF26FA018 | $32K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, the contactor shall perform all work as described per the project documents, contract, drawings, specifications, and any addendum issued by the government for completion of this work. | Apr 10, 2026 |
| FA670323F0010 | $28K | delivery order | Department of the Air Force | Real property maintenance and repair | Ang hvac multi buildings | Dec 18, 2024 |
| W911SF25FA059 | $16K | delivery order | Department of the Army | Real property maintenance and repair | Jul 29, 2025 | |
| W911SF26FA017 | $15K | delivery order | Department of the Army | Real property maintenance and repair | Iaw the attached sow, install four (4) security lights at ammo retrieval point, m6371 | Apr 3, 2026 |
| FA670323F0014 | $15K | delivery order | Department of the Air Force | Real property maintenance and repair | Repair manholes | Aug 5, 2024 |
| FA670325F0002 | $14K | delivery order | Department of the Air Force | Real property maintenance and repair | Bldg 838 crossover | Apr 3, 2025 |
| FA670323F0025 | $2K | delivery order | Department of the Air Force | Real property maintenance and repair | Bldg 747 | Jun 24, 2025 |
| FA670321D0002 | $0 | IDIQ contract | Department of the Air Force | Program and management support | Saber (base contract) | Sep 30, 2024 |
| FA670322C0005 | $0 | definitive contract | Department of the Air Force | Real property maintenance and repair | Repair/replace airfield gates | Jul 11, 2024 |
| FA670322F0001 | $0 | delivery order | Department of the Air Force | Real property maintenance and repair | Saber task order | Jul 11, 2024 |
| FA670322F0008 | $0 | delivery order | Department of the Air Force | Real property maintenance and repair | Saber install electrical sockets bldg 755 | Oct 23, 2023 |
| FA670323C0004 | $0 | definitive contract | Department of the Air Force | Real property maintenance and repair | Repair building 935 | Jan 10, 2024 |
| FA670323F0004 | $0 | delivery order | Department of the Air Force | Real property maintenance and repair | Repair hvac bldg 530 | Feb 8, 2024 |
| FA670323F0011 | $0 | delivery order | Department of the Air Force | Real property maintenance and repair | Hvac building repair | Oct 17, 2024 |
| FA670323F0012 | $0 | delivery order | Department of the Air Force | Real property maintenance and repair | Repair bldg 922 | Jan 11, 2025 |
| FA670323F0023 | $0 | delivery order | Department of the Air Force | Real property maintenance and repair | Silver flag dobbins | Apr 12, 2024 |
| W911SF21D0004 | $0 | IDIQ contract | Department of the Army | New construction | Fort benning job order contract | May 4, 2026 |
| W911SF23F0037 | $0 | delivery order | Department of the Army | New construction | Joc wwii street buildings museum | Oct 20, 2023 |
| # | Parent Contract ID | Task Orders | Obligated (FY24+) | Vehicle Ceiling | Unused Ceiling | Description | Latest Order |
|---|---|---|---|---|---|---|---|
| 1 | W911SF21D0004 | 35 | $8.8M | $1.6M | - | The perimeter fencing of the lawson ARMY airfield (laaf) requires the removal of faded/damaged (warning) signs located on various points along the perimeter fenced structure. installation of newly fabricated (warning) signs per attached ... | Jun 2, 2026 |
| 2 | FA670321D0002 | 17 | $1.6M | $716K | - | The contractor shall provide all labor materials, travel, tools, services, equipment, and supervision necessary to replace the oil water separator at b731. | Jun 24, 2025 |
Unused ceiling is uncommitted capacity across available contract records, not guaranteed spending. Vehicle details summarize the largest 500 records.
| # | Agency | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Department of the Army | 36 | $8.8M | 85% |
| 2 | Department of the Air Force | 20 | $1.6M | 15% |
| # | Category | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | New construction | 18 | $4.7M | 45% |
| 2 | Real property maintenance and repair | 33 | $4.4M | 42% |
| 3 | Equipment maintenance, other | 3 | $1.2M | 12% |
| 4 | Plumbing, heating and waste disposal | 1 | $68K | 0.7% |
| 5 | Program and management support | 1 | $0 | 0.0% |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.
Building an AI agent? Get this company profile as JSON: GET /api/agent/v1/companies/msab-hcr-jv. Schema, sample and price or start with free sample calls.