No active exclusion found for this UEI, CAGE or legal name.
| Registration | Active / All awards / expires 2027-03-27 |
|---|---|
| Legal name | PARADIGM CCW JV LLC |
| Address | 5110 N 40TH ST STE 254, PHOENIX, AZ, 85018, USA / district 01 |
| Structure | Partnership or LLP, incorporated in AZ / in business since 2023-06-28 |
| NAICS | 236220 (+21 more) |
| API | registration JSON / SAM.gov record |
| Contract ID | Obligated (FY24+) | Type | Agency | Category | Description | Latest Action |
|---|---|---|---|---|---|---|
| FA487725F0201 | $6.7M | delivery order | Department of the Air Force | Real property maintenance and repair | This project calls for the design, plans, specifications, and repair of building 4800 at dmafb for the incoming mc-130j squad ops. | Jun 25, 2025 |
| FA487725F0306 | $6.6M | delivery order | Department of the Air Force | Real property maintenance and repair | A. the multiple award construction contract is designed to provide a flexible, competitive, and responsive contractual capability to perform design-build and bid-build construction work at davis-monthan afb, az and luke afb, az | May 11, 2026 |
| FA487726F0160 | $3.5M | delivery order | Department of the Air Force | Real property maintenance and repair | Project fbnv260039 includes all work necessary to design and build an rqg human performance training center (hptc) | May 26, 2026 |
| FA487726F0128 | $3.3M | delivery order | Department of the Air Force | New construction | Design and construction services for a 6,400 square-foot (80-feet x 80-feet) metal building to serve as a climate-controlled storage and vehicle maintenance facility for 88 tes. | Apr 17, 2026 |
| FA487725F0301 | $2.1M | delivery order | Department of the Air Force | Installation of equipment | The contractor shall provide removal and replacement of air handling systems, evaporative coolers, and chillers in buildings 7440, 7401 and 7506 at davis monthan air force base (dmafb) iaw the statement of work (sow) (attachment 1). | Sep 12, 2025 |
| FA487726F0150 | $1.5M | delivery order | Department of the Air Force | New construction | This is a design build project, and the preparation of the temporary facility for amu relocatable facilities (rlf). | May 11, 2026 |
| N6426725F1109 | $1.4M | delivery order | Department of the Navy | New construction | B508, b517 and b523 roof repair | Jan 16, 2026 |
| FA487725F0065 | $900K | delivery order | Department of the Air Force | Real property maintenance and repair | A. the multiple award construction contract is designed to provide a flexible, competitive, and responsive contractual capability to perform design-build and bid-build construction work at davis-monthan afb, az and luke afb, az | Aug 15, 2025 |
| FA487726F0165 | $833K | delivery order | Department of the Air Force | New construction | This is a design-build project that entails the design and construction of two 40 x 40 foot open-walled uv storage facility for the department of the air force rescue. | May 29, 2026 |
| FA487725F0285 | $571K | delivery order | Department of the Air Force | Professional services, other | Project fbnv250045 includes all work necessary to perform design and construction services for the demolition/ repair/ construction in bldg. 4836 79th rqs for replacing flooring and light fixtures in strict accordance with the statement of ... | Sep 2, 2025 |
| FA487725F0293 | $356K | delivery order | Department of the Air Force | Architect-engineering services | This project renovates building 96 to meet physical security requirements to support 755 oss at davis-monthan afb, az. all work shall be done in accordance with the sow. | Apr 14, 2026 |
| FA487725F0220 | $348K | delivery order | Department of the Air Force | Real property maintenance and repair | The contractor shall provide repair, replacement, and upgrade of the existing breathing air supply system and fuel tank ventilation system at building 4891 on davis monthan air force base (dmafb) in accordance with the statement of work ... | Mar 16, 2026 |
| N6426725F1013 | $265K | delivery order | Department of the Navy | New construction | B544 and b547 av wall upgrade | Jun 11, 2025 |
| FA487725F0272 | $62K | delivery order | Department of the Air Force | Real property maintenance and repair | The work includes field investigation, design, product submittals, installation, testing, and supervision necessary to complete the building 1610 armory ventilation project at davis-monthan afb. | Jan 30, 2026 |
| FA487724F0233 | $250 | delivery order | Department of the Air Force | Real property maintenance and repair | Task order to satisfy the minimum dollar amount required for the base multiple award construction contract contract. | Sep 10, 2024 |
| FA487724D0015 | $0 | IDIQ contract | Department of the Air Force | Real property maintenance and repair | A. the multiple award construction contract is designed to provide a flexible, competitive, and responsive contractual capability to perform design-build and bid-build construction work at davis-monthan afb, az and luke afb, az | Feb 13, 2026 |
| N6426724D0004 | $0 | IDIQ contract | Department of the Navy | New construction | 8(a) macc | Mar 10, 2026 |
| N6426724F0004 | $0 | delivery order | Department of the Navy | New construction | Minimum guarantee | Mar 16, 2026 |
| # | Parent Contract ID | Task Orders | Obligated (FY24+) | Vehicle Ceiling | Unused Ceiling | Description | Latest Order |
|---|---|---|---|---|---|---|---|
| 1 | FA487724D0015 | 13 | $26.8M | $6.7M | - | This project renovates building 96 to meet physical security requirements to support 755 oss at davis-monthan afb, az. all work shall be done in accordance with the sow. | May 29, 2026 |
| 2 | N6426724D0004 | 3 | $1.7M | $1.4M | - | Minimum guarantee | Mar 16, 2026 |
Unused ceiling is uncommitted capacity across available contract records, not guaranteed spending. Vehicle details summarize the largest 500 records.
| # | Agency | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | 14 | $26.8M | 94% |
| 2 | Department of the Navy | 4 | $1.7M | 5.8% |
| # | Category | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | 8 | $18.1M | 64% |
| 2 | New construction | 7 | $7.3M | 26% |
| 3 | Installation of equipment | 1 | $2.1M | 7.5% |
| 4 | Professional services, other | 1 | $571K | 2.0% |
| 5 | Architect-engineering services | 1 | $356K | 1.3% |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.
Building an AI agent? Get this company profile as JSON: GET /api/agent/v1/companies/paradigm-ccw-jv. Schema, sample and price or start with free sample calls.