No active exclusion found for this UEI, CAGE or legal name.
| Registration | Active / All awards / expires 2027-09-17 |
|---|---|
| Legal name | RELIANCE CONSTRUCTION MANAGEMENT COMPANY |
| Address | 151 QUARRYSTONE CIR STE 112, CARY, NC, 27519, USA / district 02 |
| Structure | Corporate entity (not tax exempt), incorporated in NC / in business since 2011-03-17 |
| NAICS | 541330 (+60 more) |
| API | registration JSON / SAM.gov record |
| Contract ID | Obligated (FY24+) | Type | Agency | Category | Description | Latest Action |
|---|---|---|---|---|---|---|
| W912DY25F0110 | $17.9M | delivery order | Department of the Army | New construction | Base bid-constr-interi reno and ext impr | Feb 17, 2026 |
| W912DY23F0455 | $8.4M | delivery order | Department of the Army | New construction | Base - design | May 20, 2026 |
| W912DY23F0371 | $2.3M | delivery order | Department of the Army | New construction | Repair by replacement for elevator #3 | Mar 6, 2025 |
| W912DY25FA304 | $2.2M | delivery order | Department of the Army | Real property maintenance and repair | The purpose of this action is to provide all management, labor, equipment and materials necessary for the renovation, upgrade and repair of the bathroom exhaust vents for four unaccompanied housing (uh) barracks. | Apr 28, 2026 |
| N6600125F0985 | $1.5M | delivery order | Department of the Navy | Prefabricated structures | Services - hempss | May 19, 2026 |
| W912HP25FA162 | $1.2M | delivery order | Department of the Army | New construction | Contractor shall furnish all labor, equipment, materials, incidental engineering, and other items necessary to perform in accordance with the attached drawings and specifications. | Oct 14, 2025 |
| N6945025F1312 | $1.1M | delivery order | Department of the Navy | Real property maintenance and repair | Acqr 6084444 swf b5199 repair 12 powerpacks at nsb kings bay, ga | Mar 10, 2026 |
| 70FA5024P00000069 | $1.0M | purchase order | Federal Emergency Management Agency | Modification of equipment | The seven (7) government-furnished ford f-550s are mission-critical units. the objective is to ensure operational status following a hemp event. these units must be able to respond within a short time (i.e., 0-3 hours) after an event. | Jul 29, 2024 |
| FA460024P0015 | $898K | purchase order | Department of the Air Force | Architect-engineering services | Hemp and fab t maintenance | May 20, 2026 |
| W911KB26FA011 | $788K | delivery order | Department of the Army | Architect-engineering services | C1001-clr063 cy26 to 1 lrdr campus hm/hs ct%3579 [566140] services | Jan 23, 2026 |
| W912DY22C0063 | $696K | definitive contract | Department of the Army | New construction | Design and renovate the existing first floor of bldg. 4546 in accordance w ith intelligence community directive and intelligence community standards (ics 705-1) f or the supporting the defense intelligence agency msic redstone arsenal, ... | Feb 5, 2025 |
| FA460026C0005 | $681K | definitive contract | Department of the Air Force | Engineering and technical services | High-altitude electromagnetic pulse (hemp) hardness maintenance/hardness surveillance (hm/hs) engineering/technical support and enhancements | May 7, 2026 |
| W911KB26FA007 | $471K | delivery order | Department of the Army | Architect-engineering services | Clr063-lrdr campus hm/hs spare procurement-cy26, clear space force station, alaska | Dec 19, 2025 |
| W912DY23F0450 | $399K | delivery order | Department of the Army | New construction | Base bid 2: normandy hall roof repair | Oct 28, 2025 |
| W911KB25FA004 | $352K | delivery order | Department of the Army | Architect-engineering services | Seed project task order for clr063 lrdr hmhs campus satoc | Mar 18, 2025 |
| W912DR24F0366 | $301K | delivery order | Department of the Army | New construction | Reconfigure jdoc to support new layout | Apr 3, 2026 |
| N6945025F1315 | $180K | delivery order | Department of the Navy | Real property maintenance and repair | Increase power at gun pit area for camera system | Apr 23, 2026 |
| W912DR24F0378 | $117K | delivery order | Department of the Army | New construction | Command c3e55 badge door renovation | Dec 20, 2024 |
| W912DY22F0589 | $109K | delivery order | Department of the Army | New construction | Construction for building 250 imcom atlantic region joint base myer-henderson hall ft. myer, va | Jul 18, 2024 |
| N6945021F0247 | $103K | delivery order | Department of the Navy | New construction | Bldg 5060 c2 facility improvement | Mar 14, 2024 |
| W912DR22F0336 | $37K | delivery order | Department of the Army | New construction | Disa conference rooms and hvac renovations. | Jul 9, 2024 |
| W912QR26FA109 | $10K | delivery order | Department of the Army | New construction | Indefinite delivery indefinite quantity (idiq) design build and design bid build multiple award task order contract (matoc) to support construction requirements for the energy resilience and conservation investment program (ercip) ... | Apr 17, 2026 |
| FA890325F0152 | $3K | delivery order | Department of the Air Force | New construction | Attend post award conference to be scheduled within 45 days of award. this satisfies the minimum guarantee. | Jul 9, 2025 |
| HQ085926FG346 | $500 | delivery order | Missile Defense Agency | Defense systems R&D | Scalable homeland innovative enterprise layered defense (shield) initial order. | Jun 4, 2026 |
| FA251723D0001 | $0 | IDIQ contract | Department of the Air Force | Real property maintenance and repair | The front range federal installations have a requirement for a multiple award construction contract (macc) to support a broad range of design-bid-build/design-build services up to 100% and maintenance, repair and minor construction work. | May 28, 2026 |
| FA890325D0067 | $0 | IDIQ contract | Department of the Air Force | New construction | Comprehensive construction and engineering multiple award task order contract (matoc) indefinite-delivery indefinite-quantity (idiq) in accordance with the statement of work (sow), dated 6 june 2024. | Jul 9, 2025 |
| HQ085926DG311 | $0 | IDIQ contract | Missile Defense Agency | Defense systems R&D | The contractor shall provide all necessary materials, labor, equipment and facilities incidental to the performance of this requirement in accordance with the terms of the order. | Dec 19, 2025 |
| N6600121D0040 | $0 | IDIQ contract | Department of the Navy | Prefabricated structures | Development, testing, production, sustainment and technical support of take charge and move out (tacamo) ground communications. includes development/testing in high-altitude electromagnetic pulse hardening processes (maintenance and ... | Dec 8, 2023 |
| N6600123F1006 | $0 | delivery order | Department of the Navy | Engineering and technical services | Niwc pacific high-altitude electromagnetic pulse (hemp) systems s-851 t hemp shielded enclosure hardness restoration services | Feb 14, 2025 |
| N6600125D0007 | $0 | IDIQ contract | Department of the Navy | Prefabricated structures | Design, development, testing, production, monitoring, sustainment and technical support of peo c4i / pmw 770 high-altitude electromagnetic pulse shielded systems (hempss) development of technology in, and demonstration of hemp hardening ... | May 14, 2026 |
| N6600125F0037 | $0 | delivery order | Department of the Navy | Prefabricated structures | Obligation of minimum guarantee | Sep 30, 2025 |
| W911KB25DA001 | $0 | IDIQ contract | Department of the Army | Architect-engineering services | Clr063 long range discrimination radar (lrdr) hardness maintenance hardness surveillance (hmhs) campus, primarily clear space force station, alaska | Oct 9, 2025 |
| W912DR21D0019 | $0 | IDIQ contract | Department of the Army | New construction | 8(a) sole source idiq ffp contract,db and dbb construction services. the geographic location is within the baltimore-washington corridor but may be utilized to extend throughout the baltimore district military programs boundary. | Apr 17, 2025 |
| W912DY22D0047 | $0 | IDIQ contract | Department of the Army | New construction | Frr matoc provide quick response for facility repair, renovation, conversion, alteration, additions, construction, equipment procurement/installation, and maintenance services on installed equipment/systems at government installations and ... | Feb 13, 2026 |
| W912HP25D5017 | $0 | IDIQ contract | Department of the Army | New construction | Sdvosb db/dbb matoc | Sep 18, 2025 |
| W912QR26DA031 | $0 | IDIQ contract | Department of the Army | New construction | Indefinite delivery indefinite quantity (idiq) design build and design bid build multiple award task order contract (matoc) to support construction requirements for the energy resilience and conservation investment program (ercip) ... | Apr 17, 2026 |
| W912HP22C7000 | -$3K | definitive contract | Department of the Army | New construction | Surge suppression lps | Mar 8, 2024 |
| # | Parent Contract ID | Task Orders | Obligated (FY24+) | Vehicle Ceiling | Unused Ceiling | Description | Latest Order |
|---|---|---|---|---|---|---|---|
| 1 | W912DY22D0047 | 6 | $31.3M | $18.4M | - | The purpose of this action is to provide all management, labor, equipment and materials necessary for the renovation, upgrade and repair of the bathroom exhaust vents for four unaccompanied housing (uh) barracks. | May 20, 2026 |
| 2 | W911KB25DA001 | 3 | $1.6M | $788K | - | Seed project task order for clr063 lrdr hmhs campus satoc | Jan 23, 2026 |
| 3 | N6600125D0007 | 2 | $1.5M | $2.8M | $1.3M | Services - hempss | May 19, 2026 |
| 4 | N6945021D0071 | 2 | $1.3M | $1.1M | - | Increase power at gun pit area for camera system | Apr 23, 2026 |
| 5 | W912HP25D5017 | 1 | $1.2M | $1.2M | - | Contractor shall furnish all labor, equipment, materials, incidental engineering, and other items necessary to perform in accordance with the attached drawings and specifications. | Oct 14, 2025 |
| 6 | W912DR21D0019 | 3 | $455K | $1.1M | - | Reconfigure jdoc to support new layout | Apr 3, 2026 |
| 7 | N6945018D6420 | 1 | $103K | $1.7M | - | Bldg 5060 c2 facility improvement | Mar 14, 2024 |
| 8 | W912QR26DA031 | 1 | $10K | $10K | - | Indefinite delivery indefinite quantity (idiq) design build and design bid build multiple award task order contract (matoc) to support construction requirements for the energy resilience and conservation investment program (ercip) ... | Apr 17, 2026 |
| 9 | FA890325D0067 | 1 | $3K | $3K | - | Attend post award conference to be scheduled within 45 days of award. this satisfies the minimum guarantee. | Jul 9, 2025 |
| 10 | HQ085926DG311 | 1 | $500 | $500 | - | Scalable homeland innovative enterprise layered defense (shield) initial order. | Jun 4, 2026 |
Unused ceiling is uncommitted capacity across available contract records, not guaranteed spending. Vehicle details summarize the largest 500 records.
| # | Agency | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Department of the Army | 21 | $35.3M | 87% |
| 2 | Department of the Navy | 8 | $2.9M | 7.1% |
| 3 | Department of the Air Force | 5 | $1.6M | 3.9% |
| 4 | Federal Emergency Management Agency | 1 | $1.0M | 2.5% |
| 5 | Missile Defense Agency | 2 | $500 | 0.0% |
| # | Category | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | New construction | 19 | $31.6M | 78% |
| 2 | Real property maintenance and repair | 4 | $3.5M | 8.5% |
| 3 | Architect-engineering services | 5 | $2.5M | 6.2% |
| 4 | Prefabricated structures | 4 | $1.5M | 3.6% |
| 5 | Modification of equipment | 1 | $1.0M | 2.5% |
| 6 | Engineering and technical services | 2 | $681K | 1.7% |
| 7 | Defense systems R&D | 2 | $500 | 0.0% |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.
Building an AI agent? Get this company profile as JSON: GET /api/agent/v1/companies/reliance-construction-management. Schema, sample and price or start with free sample calls.