| W911QX24C0030 | $11.0M | definitive contract | Department of the Army | Science and technology R&D | Small business innovation research (sbir) iii titled "scaling manufacturing and affordability of resilient timing systems (smarts)" | Jan 13, 2026 |
| N0001424C1130 | $6.3M | definitive contract | Department of the Navy | Defense systems R&D | Under the 42-month miniature ultra-stable iodine clock program, vector atomic will develop and demonstrate a liter scale optical clock. music's simplified optical clock architecture supports aggressive miniaturization, low-cost ... | Jan 30, 2026 |
| N0017325P0003 | $2.1M | purchase order | Department of the Navy | Instruments and lab equipment | Optical clock units | May 29, 2026 |
| HQ086025C7403 | $2.0M | definitive contract | Missile Defense Agency | Defense systems R&D | Sbir/sttr phase ii R&D - miniature iodine nanosecond timekeeper (mint) | May 19, 2025 |
| FA254125CB074 | $1.9M | definitive contract | Department of the Air Force | Defense systems R&D | To advance affordable, resilient, and interoperable technologies within the proliferated warfighter space architecture to enhance space capabilities, support joint warfighting operations, and enable all-domain command and control on a ... | Sep 30, 2025 |
| FA955025CB011 | $1.9M | definitive contract | Department of the Air Force | Defense systems R&D | Topic: af23c-t002 topic title: tunable, integrated electro-optic frequency comb for space-based communications and precision, navigation and timing applications proposal: f2-18969 proposal title: tunable, integrated comb for timing and ... | Sep 28, 2025 |
| W5170126CA166 | $1.7M | definitive contract | Department of the Army | Defense systems R&D | Sbir phii topic number osd232-009, application-specific electronic package for a quantum sensor an application-specific electronics package that enables low-noise miniaturization of quantum systems. | May 14, 2026 |
| N6893624C0032 | $1.7M | definitive contract | Department of the Navy | Defense systems R&D | Sbir 2 osd232-d04 | Jul 2, 2025 |
| HR001121C0175 | $1.3M | definitive contract | Defense Advanced Research Projects Agency | Defense systems R&D | Sbir direct to phase 2: product-ready iodine clock enabled by low-environmental sensitivity subsystems (priceless) phase 2 | May 31, 2024 |
| N6833524C0220 | $1.0M | definitive contract | Department of the Navy | Defense systems R&D | Research and development | Jun 4, 2024 |
| W911NF19C0047 | $363K | definitive contract | Department of the Army | Other R&D | Building enhancements: new baa effort, gamesim proposes to improve the quality, accuracy, and usability of procedurally generated building representations. all tasks focus on aspects of procedural building generation and each has defined ... | Oct 3, 2024 |
| N0001419C1065 | $297K | definitive contract | Defense Contract Management Agency | Defense systems R&D | Gravity-aided inertial navigation system (gains) | Jan 23, 2025 |
| N6893624C0010 | $295K | definitive contract | Department of the Navy | Defense systems R&D | Sbir phase 1 contract award | Apr 24, 2024 |
| N6893624C0019 | $290K | definitive contract | Department of the Navy | Defense systems R&D | Sbir phase 1 contract award | Feb 23, 2024 |
| HR001124P0308 | $200K | purchase order | Defense Advanced Research Projects Agency | Defense systems R&D | Generate ultrastable optical and radio frequency (rf) signals from a central hub containing an optical atomic clock | Oct 18, 2024 |
| FA955024PB004 | $200K | purchase order | Department of the Air Force | Science and technology R&D | Sttr af 23c-t002 | Sep 19, 2024 |
| N6833523C0334 | $100K | definitive contract | Department of the Navy | Defense systems R&D | Sbir phase 1 | Jan 31, 2024 |
| HQ085926FF260 | $500 | delivery order | Missile Defense Agency | Defense systems R&D | Scalable homeland innovative enterprise layered defense (shield) initial order. | Dec 19, 2025 |
| HQ085926DE764 | $0 | IDIQ contract | Missile Defense Agency | Defense systems R&D | The contractor shall provide all necessary materials, labor, equipment and facilities incidental to the performance of this requirement in accordance with the terms of the order. | Dec 19, 2025 |
| N0001422C1041 | $0 | definitive contract | Department of the Navy | Defense systems R&D | Miniature ultra-stable iodine clock component development | Apr 12, 2024 |
| W911NF22C0071 | $0 | definitive contract | Department of the Army | Science and technology R&D | Sttr phase ii:circuit integration for robust quantum information technology scalability (cirquits) | Mar 26, 2025 |
| HQ014719C6503 | -$140 | definitive contract | Missile Defense Agency | Defense systems R&D | Research and development, hdct effort titled "uflatpack accelerometer-gyroscope sensor using hybrid integrated photonics" | Sep 24, 2025 |
| N0001418C1052 | -$8K | definitive contract | Department of the Navy | Defense systems R&D | Flatpack accelerometer-gyroscope sensor using hybrid integrated photonics (flagship) | Jul 15, 2025 |