| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| N0016725F1169 delivery order | Meltech Corporation, Inc | $2.7M | B17 generator replacement. provide all engineering work and construction to complete the final design and installation associated with 1500kw generator for building 17. | Navy | New construction | Apr 8, 2026 DoD 90d |
| N0016725F1168 delivery order | Meltech Corporation, Inc | $759K | B157 fire protection. furnish and be responsible for all engineering design, construction, labor, transportation, tools and equipment, supervision and commissioning requirements in coordination with navfac fpe. | Navy | Real property maintenance and repair | Sep 4, 2025 DoD 90d |
| N0016726F1072 delivery order | Meltech Corporation, Inc | $476K | B12 roof replacement | Navy | New construction | May 4, 2026 DoD 90d |
| N0016726F1034 delivery order | Meltech Corporation, Inc | $306K | Contractor shall remove and replace a 12000 gallon above ground storage diesel tank located at the naval surface warfare center olney detachment. | Navy | New construction | Jan 9, 2026 DoD 90d |
| N0016725F1084 delivery order | Meltech Corporation, Inc | $300K | Contractor shall furnish labor, materials, equipment, supervision, and incidentals to construct approximately 144 square feet of office space in rm 105 to a functional, code-compliant office suite, demo existing rm 110, and install new ... | Navy | New construction | Oct 30, 2025 DoD 90d |
| N0016724F0009 delivery order | Meltech Corporation, Inc | $285K | Polyurethane foam roofing system | Navy | New construction | Oct 19, 2023 DoD 90d |
| N0016726F1086 delivery order | Meltech Corporation, Inc | $249K | Contractor shall furnish all engineering design, labor, transportation, tools, equipment, materials, construction to design and install two 5-ton split-system heat pumps, hvac fabric ductwork, piping, electric backup, and controls for ... | Navy | Real property maintenance and repair | May 14, 2026 DoD 90d |
| N0016725F1094 delivery order | Meltech Corporation, Inc | $224K | The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to renovate approximately 1,550 square feet of office space in building 191, specifically rooms 108, 110, 112, 114, 115, 116, 118, 120, ... | Navy | New construction | Jan 8, 2026 DoD 90d |
| N0016725F1100 delivery order | Meltech Corporation, Inc | $209K | The contractor shall provide all labor, materials, equipment, and supervision required to rebuild one (1) coupled vertical turbine pump, and (2) 10 inch weight and lever check valves located in building 4, j-basin | Navy | New construction | Apr 1, 2026 DoD 90d |
| N0016726F1046 delivery order | Meltech Corporation, Inc | $202K | This project calls for the contractor to furnish and install an exhaust duct for a government furnished contractor installed (gfci) fume hood | Navy | New construction | Jun 4, 2026 DoD 90d |
| N0016725F1083 delivery order | Meltech Corporation, Inc | $73K | The contractor shall provide the necessary labor, material, equipment, and supervision to build out wall to provide a level area to mount wall cabinet, install kitchen cabinets, counter, sink, instant hot water tap, paper towel holder etc. | Navy | New construction | Mar 3, 2026 DoD 90d |
| N0016725F1109 delivery order | Meltech Corporation, Inc | $70K | Provide minor repairs and allsteel brand name furniture under the current general services administration agreement (GSA) pricing for building 60, room 341 and 341a. | Navy | New construction | Oct 30, 2025 DoD 90d |
| N0016724F0120 delivery order | Meltech Corporation, Inc | $34K | B79 door replacement | Navy | New construction | Apr 30, 2024 DoD 90d |
| N0016725F0019 delivery order | Meltech Corporation, Inc | $23K | Project to extend an existing concrete pad adjacent to building 60 to support a new hazmat drum locker. the new hazmat drum locker is larger than the existing locker. the concrete pad must be extended by anadditional 2 feet 5 inches of ... | Navy | Electronics and comms maintenance | Aug 12, 2025 DoD 90d |
| N0016724D0013 IDIQ contract | Meltech Corporation, Inc | $0 | Multi year ordering period of five year | Navy | New construction | Jun 20, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export custom datasets in CSV, JSON, JSONL, or Markdown Brief, query the REST API, or start a 7-day Terminal trial.
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and choose field groups. $19 one-time for instant Dataset Export access (no subscription) or $49 for 1,000 API calls + full export.