Command Search (/)DoD & DHS Obligations $1.40T FY24-26Expiring Recompetes 300 $126.8BPalantir Maven 81.6% fill $637.6M / $781.3MAnduril Enterprise $20B IDIQUS Grid Queue 107.8 GW 523 projectsSanctions & UFLPA 432 entitiesContract RecordsUpdated Oct 26, 2026
AwardTape

AwardTape / Contracts / FA4803-23-F-0038

FA4803-23-F-0038: $249K Department of the Air Force Award to Edl Construction Inc

Aircraft sunshade structural inspection. Contracting activity: FA4803 20 CONS LGCA. Estimated completion: 2028-06-11.

$249K contract action / $414K cumulative ceiling / COMPETITION NOT STATED / 2028-06-11 completion / FA4803 FA4803 20 CONS LGCA

1. Contract Summary & Primary Sources

Contract Number (PIID) FA4803-23-F-0038 (unhyphenated: FA480323F0038) · Parent Vehicle: 47QSWA-21-D-0028
Prime Contractor (Awardee) Edl Construction Inc (South Carolina)
FY2024-FY2026 Federal Defense Portfolio: $18.7M obligated across 20 contracts
Obligated Amount $248,520
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $414,200
USAspending / FPDS Obligation History Base Record Obligated: $248,520 (signed 2023-06-12, latest FPDS action 2026-05-08) · 10 Issued Delivery/Task Order(s) totaling $17,374,619
Awarding Branch / Agency Department of the Air Force
Contracting Command & DoDAAC FA4803: FA4803 20 CONS LGCA
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC R425 (Support- Professional: Engineering/Technical) · NAICS 332311 (Prefabricated Metal Building And Component Manufacturing)
Work Locations & Funding Primary Place of Performance: South Carolina
Estimated Completion Date 2028-06-11
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract FA480323F0038)

Aircraft sunshade structural inspection

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: Edl Construction Inc
  • Delivery Runway: Active through 2028-06-11
  • Requirement Scope: Aircraft sunshade structural inspection
  • Federal Supply Class: PSC R425 (Support- Professional: Engineering/Technical)
  • BD Action: Reference Prime Contract FA4803-23-F-0038 when contacting Edl Construction Inc Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: FA4803 (FA4803 20 CONS LGCA)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under FA4803-23-F-0038 (10 shown, $17.4M obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
FA500024F0077 $16.7M Edl Construction Inc 2024-07-26 / 2026-01-13 2026-06-01 Design and assembly of four new, heated pre-engineered buildings iaw the statements of work.
FA930224F0124 $186K Edl Construction Inc 2024-09-11 / 2025-02-07 2025-03-31 Equipment shelter for 412 ewg testing equipment.
W50S6Y24F0002 $129K Edl Construction Inc 2023-11-16 / 2023-11-16 2024-02-02 80x40x20 metal sunshade structure to be built on munitions conveyer assembly pad.
W50SLF24F0007 $119K Edl Construction Inc 2024-01-24 / 2026-01-20 2029-01-27 Inspection services of fifteen each f22 sunshades
W50S6T24FA010 $111K Edl Construction Inc 2024-02-09 / 2026-02-24 2029-02-28 Semiannual inspections of 144fw sunshades (aircraft shelters).
FA462524F0049 $79K Edl Construction Inc 2024-08-08 / 2024-08-08 2024-11-12 Repair and maintenance of 442nd sun shades.
W50S7W25FA005 $24K Edl Construction Inc 2025-08-07 / 2025-08-07 2029-08-07 Preventative maintenance and inspection services for the 122d fw fighter sunshade.
FA500023F0116 $0 Edl Construction Inc 2023-08-07 / 2024-03-19 2025-03-07 Design and assembly of a pre-engineered building and site prep
FA500023F0117 $0 Edl Construction Inc 2023-08-07 / 2024-04-10 2025-03-07 Install pre-engineered building at camp mad bull
FA500023F0118 $0 Edl Construction Inc 2023-07-29 / 2024-04-10 2025-03-07 Install pre engineered building camp mad bull #2
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Edl Construction Inc Supply Chain / Small Business Liaison referencing contract FA4803-23-F-0038.

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for FA4803-23-F-0038

Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗

Open Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.