AwardTape / Contracts / W50SLF-24-F-0007
W50SLF-24-F-0007: $119K Department of the Army Award to Edl Construction Inc
Inspection services of fifteen each f22 sunshades. Contracting activity: W7M4 USPFO ACTIVITY HIANG 154. Estimated completion: 2029-01-27.
$119K contract action / $198K cumulative ceiling / COMPETITION NOT STATED / 2029-01-27 completion / W50SLF W7M4 USPFO ACTIVITY HIANG 154
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W50SLF-24-F-0007 (unhyphenated: W50SLF24F0007) · Parent Vehicle: 47QSWA-21-D-0028 |
|---|---|
| Prime Contractor (Awardee) |
Edl Construction Inc
(Hawaii)
FY2024-FY2026 Federal Defense Portfolio: $18.7M obligated across 20 contracts
|
| Obligated Amount | $118,800 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $198,000 |
| USAspending / FPDS Obligation History | Base Record Obligated: $118,800 (signed 2024-01-24, latest FPDS action 2026-01-20) · 10 Issued Delivery/Task Order(s) totaling $17,504,339 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W50SLF: W7M4 USPFO ACTIVITY HIANG 154 |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z1BZ (Maintenance Of Other Airfield Structures) · NAICS 332311 (Prefabricated Metal Building And Component Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Hawaii |
| Estimated Completion Date | 2029-01-27 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
USAspending / FPDS Transaction Description (Contract W50SLF24F0007)
Inspection services of fifteen each f22 sunshades
3. Subcontractor, Supply Chain & Capture Intelligence
For Tier-2 / Tier-3 Subcontractors & Suppliers
Subcontracting & Material Supply Window
- Prime Awardee: Edl Construction Inc
- Delivery Runway: Active through 2029-01-27
- Requirement Scope: Inspection services of fifteen each f22 sunshades
- Federal Supply Class: PSC Z1BZ (Maintenance Of Other Airfield Structures)
- BD Action: Reference Prime Contract W50SLF-24-F-0007 when contacting Edl Construction Inc Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers
Buying Command & Recompete Posture
- Buying Command: W50SLF (W7M4 USPFO ACTIVITY HIANG 154)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W50SLF-24-F-0007 (10 shown, $17.5M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| FA500024F0077 | $16.7M | Edl Construction Inc | 2024-07-26 / 2026-01-13 | 2026-06-01 | Design and assembly of four new, heated pre-engineered buildings iaw the statements of work. |
| FA480323F0038 | $249K | Edl Construction Inc | 2023-06-12 / 2026-05-08 | 2028-06-11 | Aircraft sunshade structural inspection |
| FA930224F0124 | $186K | Edl Construction Inc | 2024-09-11 / 2025-02-07 | 2025-03-31 | Equipment shelter for 412 ewg testing equipment. |
| W50S6Y24F0002 | $129K | Edl Construction Inc | 2023-11-16 / 2023-11-16 | 2024-02-02 | 80x40x20 metal sunshade structure to be built on munitions conveyer assembly pad. |
| W50S6T24FA010 | $111K | Edl Construction Inc | 2024-02-09 / 2026-02-24 | 2029-02-28 | Semiannual inspections of 144fw sunshades (aircraft shelters). |
| FA462524F0049 | $79K | Edl Construction Inc | 2024-08-08 / 2024-08-08 | 2024-11-12 | Repair and maintenance of 442nd sun shades. |
| W50S7W25FA005 | $24K | Edl Construction Inc | 2025-08-07 / 2025-08-07 | 2029-08-07 | Preventative maintenance and inspection services for the 122d fw fighter sunshade. |
| FA500023F0116 | $0 | Edl Construction Inc | 2023-08-07 / 2024-03-19 | 2025-03-07 | Design and assembly of a pre-engineered building and site prep |
| FA500023F0117 | $0 | Edl Construction Inc | 2023-08-07 / 2024-04-10 | 2025-03-07 | Install pre-engineered building at camp mad bull |
| FA500023F0118 | $0 | Edl Construction Inc | 2023-07-29 / 2024-04-10 | 2025-03-07 | Install pre engineered building camp mad bull #2 |
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Edl Construction Inc Supply Chain / Small Business Liaison referencing contract W50SLF-24-F-0007.
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)
Pre-Filled FOIA Request Letter for W50SLF-24-F-0007
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) · Official Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.