Command Search (/)DoD & DHS Obligations $1.40T FY24-26Expiring Recompetes 300 $126.8BPalantir Maven 81.6% fill $637.6M / $781.3MAnduril Enterprise $20B IDIQUS Grid Queue 107.8 GW 523 projectsSanctions & UFLPA 432 entitiesContract RecordsUpdated Oct 26, 2026
AwardTape

AwardTape / Contracts / N69450-25-F-1148

N69450-25-F-1148: $51K Department of the Navy Award to Rymark-S&s Joint Venture LLC

Mclb_renovate room 66 @ b3500 for hro gtc a2201-017-017-018833. Contracting activity: NAVFACSYSCOM SOUTHEAST. Estimated completion: 2025-10-10.

$51K contract action / $51K cumulative ceiling / COMPETITION NOT STATED / 2025-10-10 completion / N69450 NAVFACSYSCOM SOUTHEAST

1. Contract Summary & Primary Sources

Contract Number (PIID) N69450-25-F-1148 (unhyphenated: N6945025F1148) · Parent Vehicle: N69450-24-D-0053
Prime Contractor (Awardee) Rymark-S&s Joint Venture LLC (Georgia)
FY2024-FY2026 Federal Defense Portfolio: $7.5M obligated across 31 contracts
Obligated Amount $51,439
Cumulative Face Value / Ceiling USAspending Base IDV Ceiling: $51,439
USAspending / FPDS Obligation History Base Record Obligated: $51,439 (signed 2025-08-07, latest FPDS action 2025-09-11) · 15 Issued Delivery/Task Order(s) totaling $1,909,140
Awarding Branch / Agency Department of the Navy
Contracting Command & DoDAAC N69450: NAVFACSYSCOM SOUTHEAST
Competition & Contract Structure COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC Z2AA (Repair Or Alteration Of Office Buildings) · NAICS 236220 (Commercial And Institutional Building Construction)
Work Locations & Funding Primary Place of Performance: Georgia
Estimated Completion Date 2025-10-10
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

USAspending / FPDS Transaction Description (Contract N6945025F1148)

Mclb_renovate room 66 @ b3500 for hro gtc a2201-017-017-018833

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: Rymark-S&s Joint Venture LLC
  • Delivery Runway: Active through 2025-10-10
  • Requirement Scope: Mclb_renovate room 66 @ b3500 for hro gtc a2201-017-017-018833
  • Federal Supply Class: PSC Z2AA (Repair Or Alteration Of Office Buildings)
  • BD Action: Reference Prime Contract N69450-25-F-1148 when contacting Rymark-S&s Joint Venture LLC Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: N69450 (NAVFACSYSCOM SOUTHEAST)
  • Acquisition Method: COMPETITION NOT STATED
  • FOIA Jurisdiction: Department of the Navy FOIA (route via DON portal) (Official Portal)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.

Issued Task & Delivery Orders under N69450-25-F-1148 (15 shown, $1.9M obligated)

Order PIID Obligated Awardee Start / Latest Action End Date Order Scope
N6945025F1266 $445K Rymark-S&s Joint Venture LLC 2025-09-16 / 2025-09-16 2026-09-29 Convert tennis ball court to pickleball court-mclb, albany ga; contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary to convert tennis court into pickleball ...
N6945025F1228 $320K Rymark-S&s Joint Venture LLC 2025-08-27 / 2025-08-27 2025-12-01 B5500 replace ac units-contractor shall provide all that is necessary to replace one 20-ton gas heat packaged rooftop unit and one 15-ton gas heat package rooftop unit at building 5500 mclb albany, complete and ready for use.
N6945025F1143 $299K Rymark-S&s Joint Venture LLC 2025-08-07 / 2025-08-07 2025-12-31 Contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary for replacing water treatment system at b2210, mclb albany, ga complete and ready for use.
N6945025F1230 $150K Rymark-S&s Joint Venture LLC 2025-08-27 / 2025-08-27 2026-05-05 Wo 3161476, demolish splash pad at b7380, replace w/new deck
N6945025F0448 $135K Rymark-S&s Joint Venture LLC 2025-05-15 / 2025-05-15 2025-08-25 Hap anchor racks b1360 & b1361
N6945025F1182 $103K Rymark-S&s Joint Venture LLC 2025-08-13 / 2025-08-13 2026-02-26 Contractor shall provide all that is necessary to remove asbestos, patch and paint walls, replace carpet in three offices (301-1,301-2, and 301-3) in room 301and in room 307 at b3500, mclb albany, complete and ready for use.
N6945025F1383 $77K Rymark-S&s Joint Venture LLC 2025-09-24 / 2025-09-24 2026-03-30 B5580 replace flooring - contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary to replace the floor coverings at b5580 at mclb albany, complete and ready for ...
N6945025F1278 $75K Rymark-S&s Joint Venture LLC 2025-09-17 / 2025-09-23 2025-10-30 B1331 bay 3 breakroom refurbishment - contractor shall provide all necessary to replace b1331 bay 3 breakroom cabinet, flooring, and ahu at mclb albany, complete and ready for use.
N6945026F0303 $69K Rymark-S&s Joint Venture LLC 2026-06-01 / 2026-06-01 2026-10-02 B5410 install 1 ada push button door ramp acqr: 6161900 wo#3382097-contractor shall provide all necessary to install one americans with disabilities act (ada) of 2010, pushbutton door opener and one ada door closer and ramp at b5410, mclb ...
N6945026F0320 $48K Rymark-S&s Joint Venture LLC 2026-06-04 / 2026-06-04 2026-10-02 B3500 replace water damaged floor in vault acqr: 6161908 wo# 2701357-contractor shall provide all necessary to remove existing vct flooring and install new tile flooring at b3500, mclb albany, complete and ready for use.
N6945025F1217 $44K Rymark-S&s Joint Venture LLC 2025-08-21 / 2025-08-21 2026-02-25 Install 20x20 sunshade-contractor shall provide all necessary to install 20x20x12 open structure at mclb albany, complete and ready for use.
N6945025F1392 $42K Rymark-S&s Joint Venture LLC 2025-09-23 / 2025-09-23 2026-12-30 B7520 renovate flooring (room 221)
N6945025F1363 $39K Rymark-S&s Joint Venture LLC 2025-09-24 / 2025-09-24 2026-03-30 B1250 bay 3 vets office-contractor shall provide all necessary to remove floor tile and cove base install epoxy flooring @ building 1250 bay 3 vets office mclb albany, complete and ready for use.
N6945025F1206 $34K Rymark-S&s Joint Venture LLC 2025-08-20 / 2025-08-20 2026-01-09 Extend wall to ceiling-contractor shall provide all necessary to secure room 105 ceiling at b10050. drop ceiling shall be removed and sheetrock ceiling installed-mclb albany,
N6945025F1302 $30K Rymark-S&s Joint Venture LLC 2025-09-09 / 2025-09-22 2025-11-17 Dla b 1221 5 ton hvac for bay 5-contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary to replace a 5-ton system for building 1221 bay 5 traffic office mclb ...
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Rymark-S&s Joint Venture LLC Supply Chain / Small Business Liaison referencing contract N69450-25-F-1148.

Recent Contract Actions from Buying Office N69450 (NAVFACSYSCOM SOUTHEAST)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-09-28 N69450-26-C-0040 Orion Government Services $31.5M - Orion Government Services wins $31.5M contract for repair and recapitalization of Wharf Bravo. Naval Facilities Engineering Systems Command ...
2026-09-22 N69450-26-D-0034 Centerra Integrated Services $49.5M - Centerra Integrated Services wins $49.5M order for small to medium, multi-traded maintenance, repair. Naval Facilities Engineering Systems C...
2026-06-29 N69450-26-D-0024 KTH Services JV $35.0M - KTH Services JV wins $35.0M contract for base operations support services at Naval Station Mayport, Jacksonville, Florida. Naval Facilities ...
2026-05-27 N69450-20-D-0045 Amentum Technology $50.2M - Amentum Technology gets $50.2M modification for base operations support services at Naval Submarine Base Kings Bay and outlying areas. Naval...
2026-03-31 N69450-19-D-1740 NCS/EML SB JV $14.0M - NCS/EML SB JV gets $14.0M modification for base operations support services. Naval Facilities Engineering Systems Command.
2026-03-26 N69450-26-D-0015 Excelerate Gas Marketing Ltd. Partnership $69.5M - Excelerate Gas Marketing Ltd. Partnership wins $69.5M contract for and delivery of liquefied natural gas (LNG). Naval Facilities Engineering...
2026-03-17 N69450-22-D-0002 Ashford Leebcor Enterprises IV LLC $93.0M - Ashford Leebcor Enterprises IV and 7 others share $93.0M modification for general building type projects. Naval Facilities Engineering Syste...
2026-03-13 N69450-22-D-0043 J&J and ALMS Mission Support Solutions $31.2M - J&J and ALMS Mission Support Solutions gets $31.2M modification for base operation support services. Naval Facilities Engineering Systems Co...

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for N69450-25-F-1148

Routed to Department of the Navy FOIA (route via DON portal) · Official Agency FOIA Portal ↗

Open Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.