AwardTape / Contracts / N69450-25-F-1363
N69450-25-F-1363: $39K Department of the Navy Award to Rymark-S&s Joint Venture LLC
B1250 bay 3 vets office-contractor shall provide all necessary to remove floor tile and cove base install epoxy flooring @ building 1250 bay 3 vets office mclb albany, complete and ready for use.. Contracting activity: NAVFACSYSCOM SOUTHEAST. Estimated completion: 2026-03-30.
$39K contract action / $39K cumulative ceiling / COMPETITION NOT STATED / 2026-03-30 completion / N69450 NAVFACSYSCOM SOUTHEAST
1. Contract Summary & Primary Sources
| Contract Number (PIID) | N69450-25-F-1363 (unhyphenated: N6945025F1363) · Parent Vehicle: N69450-24-D-0053 |
|---|---|
| Prime Contractor (Awardee) |
Rymark-S&s Joint Venture LLC
(Georgia)
FY2024-FY2026 Federal Defense Portfolio: $7.5M obligated across 31 contracts
|
| Obligated Amount | $39,195 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $39,195 |
| USAspending / FPDS Obligation History | Base Record Obligated: $39,195 (signed 2025-09-24, latest FPDS action 2025-09-24) · 15 Issued Delivery/Task Order(s) totaling $1,921,384 |
| Awarding Branch / Agency | Department of the Navy |
| Contracting Command & DoDAAC | N69450: NAVFACSYSCOM SOUTHEAST |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings) · NAICS 236220 (Commercial And Institutional Building Construction) |
| Work Locations & Funding | Primary Place of Performance: Georgia |
| Estimated Completion Date | 2026-03-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
B1250 bay 3 vets office-contractor shall provide all necessary to remove floor tile and cove base install epoxy flooring @ building 1250 bay 3 vets office mclb albany, complete and ready for use.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Rymark-S&s Joint Venture LLC
- Delivery Runway: Active through 2026-03-30
- Requirement Scope: B1250 bay 3 vets office-contractor shall provide all necessary to remove floor tile and cove base install epoxy flooring @ building 1250 bay 3 vets office mclb albany, complete and ready for use.
- Federal Supply Class: PSC Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
- BD Action: Reference Prime Contract N69450-25-F-1363 when contacting Rymark-S&s Joint Venture LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: N69450 (NAVFACSYSCOM SOUTHEAST)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Navy FOIA (route via DON portal) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under N69450-25-F-1363 (15 shown, $1.9M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| N6945025F1266 | $445K | Rymark-S&s Joint Venture LLC | 2025-09-16 / 2025-09-16 | 2026-09-29 | Convert tennis ball court to pickleball court-mclb, albany ga; contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary to convert tennis court into pickleball ... |
| N6945025F1228 | $320K | Rymark-S&s Joint Venture LLC | 2025-08-27 / 2025-08-27 | 2025-12-01 | B5500 replace ac units-contractor shall provide all that is necessary to replace one 20-ton gas heat packaged rooftop unit and one 15-ton gas heat package rooftop unit at building 5500 mclb albany, complete and ready for use. |
| N6945025F1143 | $299K | Rymark-S&s Joint Venture LLC | 2025-08-07 / 2025-08-07 | 2025-12-31 | Contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary for replacing water treatment system at b2210, mclb albany, ga complete and ready for use. |
| N6945025F1230 | $150K | Rymark-S&s Joint Venture LLC | 2025-08-27 / 2025-08-27 | 2026-05-05 | Wo 3161476, demolish splash pad at b7380, replace w/new deck |
| N6945025F0448 | $135K | Rymark-S&s Joint Venture LLC | 2025-05-15 / 2025-05-15 | 2025-08-25 | Hap anchor racks b1360 & b1361 |
| N6945025F1182 | $103K | Rymark-S&s Joint Venture LLC | 2025-08-13 / 2025-08-13 | 2026-02-26 | Contractor shall provide all that is necessary to remove asbestos, patch and paint walls, replace carpet in three offices (301-1,301-2, and 301-3) in room 301and in room 307 at b3500, mclb albany, complete and ready for use. |
| N6945025F1383 | $77K | Rymark-S&s Joint Venture LLC | 2025-09-24 / 2025-09-24 | 2026-03-30 | B5580 replace flooring - contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary to replace the floor coverings at b5580 at mclb albany, complete and ready for ... |
| N6945025F1278 | $75K | Rymark-S&s Joint Venture LLC | 2025-09-17 / 2025-09-23 | 2025-10-30 | B1331 bay 3 breakroom refurbishment - contractor shall provide all necessary to replace b1331 bay 3 breakroom cabinet, flooring, and ahu at mclb albany, complete and ready for use. |
| N6945026F0303 | $69K | Rymark-S&s Joint Venture LLC | 2026-06-01 / 2026-06-01 | 2026-10-02 | B5410 install 1 ada push button door ramp acqr: 6161900 wo#3382097-contractor shall provide all necessary to install one americans with disabilities act (ada) of 2010, pushbutton door opener and one ada door closer and ramp at b5410, mclb ... |
| N6945025F1148 | $51K | Rymark-S&s Joint Venture LLC | 2025-08-07 / 2025-09-11 | 2025-10-10 | Mclb_renovate room 66 @ b3500 for hro gtc a2201-017-017-018833 |
| N6945026F0320 | $48K | Rymark-S&s Joint Venture LLC | 2026-06-04 / 2026-06-04 | 2026-10-02 | B3500 replace water damaged floor in vault acqr: 6161908 wo# 2701357-contractor shall provide all necessary to remove existing vct flooring and install new tile flooring at b3500, mclb albany, complete and ready for use. |
| N6945025F1217 | $44K | Rymark-S&s Joint Venture LLC | 2025-08-21 / 2025-08-21 | 2026-02-25 | Install 20x20 sunshade-contractor shall provide all necessary to install 20x20x12 open structure at mclb albany, complete and ready for use. |
| N6945025F1392 | $42K | Rymark-S&s Joint Venture LLC | 2025-09-23 / 2025-09-23 | 2026-12-30 | B7520 renovate flooring (room 221) |
| N6945025F1206 | $34K | Rymark-S&s Joint Venture LLC | 2025-08-20 / 2025-08-20 | 2026-01-09 | Extend wall to ceiling-contractor shall provide all necessary to secure room 105 ceiling at b10050. drop ceiling shall be removed and sheetrock ceiling installed-mclb albany, |
| N6945025F1302 | $30K | Rymark-S&s Joint Venture LLC | 2025-09-09 / 2025-09-22 | 2025-11-17 | Dla b 1221 5 ton hvac for bay 5-contractor shall provide all labor, management, supervision, tools, supplies, incidental work, materials, and transportation necessary to replace a 5-ton system for building 1221 bay 5 traffic office mclb ... |
Recent Contract Actions from Buying Office N69450 (NAVFACSYSCOM SOUTHEAST)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-28 | N69450-26-C-0040 | Orion Government Services | $31.5M | - | Orion Government Services wins $31.5M contract for repair and recapitalization of Wharf Bravo. Naval Facilities Engineering Systems Command ... |
| 2026-09-22 | N69450-26-D-0034 | Centerra Integrated Services | $49.5M | - | Centerra Integrated Services wins $49.5M order for small to medium, multi-traded maintenance, repair. Naval Facilities Engineering Systems C... |
| 2026-06-29 | N69450-26-D-0024 | KTH Services JV | $35.0M | - | KTH Services JV wins $35.0M contract for base operations support services at Naval Station Mayport, Jacksonville, Florida. Naval Facilities ... |
| 2026-05-27 | N69450-20-D-0045 | Amentum Technology | $50.2M | - | Amentum Technology gets $50.2M modification for base operations support services at Naval Submarine Base Kings Bay and outlying areas. Naval... |
| 2026-03-31 | N69450-19-D-1740 | NCS/EML SB JV | $14.0M | - | NCS/EML SB JV gets $14.0M modification for base operations support services. Naval Facilities Engineering Systems Command. |
| 2026-03-26 | N69450-26-D-0015 | Excelerate Gas Marketing Ltd. Partnership | $69.5M | - | Excelerate Gas Marketing Ltd. Partnership wins $69.5M contract for and delivery of liquefied natural gas (LNG). Naval Facilities Engineering... |
| 2026-03-17 | N69450-22-D-0002 | Ashford Leebcor Enterprises IV LLC | $93.0M | - | Ashford Leebcor Enterprises IV and 7 others share $93.0M modification for general building type projects. Naval Facilities Engineering Syste... |
| 2026-03-13 | N69450-22-D-0043 | J&J and ALMS Mission Support Solutions | $31.2M | - | J&J and ALMS Mission Support Solutions gets $31.2M modification for base operation support services. Naval Facilities Engineering Systems Co... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for N69450-25-F-1363
Routed to Department of the Navy FOIA (route via DON portal) · Official Agency FOIA Portal ↗