FA4803-25-F-0019: $26K Department of the Air Force Award to Digital Plaza LLC
The contractor shall provide all materials and labor to replace the uninterrupted power supply (ups), located in building 2000, shaw afb, sc, and perform manufacturer recommended preventative maintenance inspections iaw with the statement .... Contracting activity: FA4803 20 CONS LGCA. Estimated completion: 2025-05-20.
$26K contract action / $26K cumulative ceiling / COMPETITION NOT STATED / 2025-05-20 completion / FA4803 FA4803 20 CONS LGCA
1. Contract Summary & Primary Sources
| Contract Number (PIID) | FA4803-25-F-0019 (unhyphenated: FA480325F0019) · Parent Vehicle: GS03F011DA |
|---|---|
| Prime Contractor (Awardee) |
Digital Plaza LLC
(South Carolina)
FY2024-FY2026 Federal Defense Portfolio: $927K obligated across 23 contracts
|
| Obligated Amount | $25,895 |
| Cumulative Face Value / Ceiling | USAspending Base IDV Ceiling: $25,895 |
| USAspending / FPDS Obligation History | Base Record Obligated: $25,895 (signed 2025-04-21, latest FPDS action 2025-04-21) · 12 Issued Delivery/Task Order(s) totaling $534,146 |
| Awarding Branch / Agency | Department of the Air Force |
| Contracting Command & DoDAAC | FA4803: FA4803 20 CONS LGCA |
| Competition & Contract Structure | COMPETITION NOT STATED · Delivery Order / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC 5999 (Miscellaneous Electrical And Electronic Components) · NAICS 333318 (Other Commercial And Service Industry Machinery Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: South Carolina |
| Estimated Completion Date | 2025-05-20 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
The contractor shall provide all materials and labor to replace the uninterrupted power supply (ups), located in building 2000, shaw afb, sc, and perform manufacturer recommended preventative maintenance inspections iaw with the statement ...
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Digital Plaza LLC
- Delivery Runway: Active through 2025-05-20
- Requirement Scope: The contractor shall provide all materials and labor to replace the uninterrupted power supply (ups), located in building 2000, shaw afb, sc, and perform manufacturer recommended preventative maintenance inspections iaw with the statement ...
- Federal Supply Class: PSC 5999 (Miscellaneous Electrical And Electronic Components)
- BD Action: Reference Prime Contract FA4803-25-F-0019 when contacting Digital Plaza LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: FA4803 (FA4803 20 CONS LGCA)
- Acquisition Method: COMPETITION NOT STATED
- FOIA Jurisdiction: Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) (Official Portal)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under FA4803-25-F-0019 (12 shown, $534K obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| N6426725F4106 | $139K | Digital Plaza LLC | 2025-05-01 / 2025-05-01 | 2025-06-02 | Uninterruptible power supply equipment |
| FA487725F0021 | $109K | Digital Plaza LLC | 2024-10-30 / 2024-10-30 | 2024-12-11 | Uninterrupted power supply (ups) unit and battery cabinet with installation, removal and disposal services. |
| FA481424F0154 | $93K | Digital Plaza LLC | 2024-08-22 / 2024-08-22 | 2024-11-12 | Pka - ups - 6 cs |
| W50S6N24FA033 | $68K | Digital Plaza LLC | 2024-09-27 / 2024-09-27 | 2024-12-31 | 187 comm squadron has a requirement for ups, replacement batteries, and sfps from comm infrastructure. |
| N0018925FG084 | $39K | Digital Plaza LLC | 2025-09-26 / 2025-09-26 | 2025-10-25 | Belkin kvm switches |
| N0018925FR155 | $22K | Digital Plaza LLC | 2025-09-26 / 2026-01-30 | 2025-10-26 | Eaton 9355 10-30kva uninterrupted power supply |
| 70FA2025F00000029 | $22K | Digital Plaza LLC | 2025-04-14 / 2025-04-14 | 2025-05-14 | Public safety section 2d exclusion of executive order implementing the presidents doge cost efficiency initiative - battery backup replacements for the center for domestic preparedness |
| N6308225F3040 | $17K | Digital Plaza LLC | 2025-09-26 / 2025-09-26 | 2025-10-26 | 100ea headset & 60ea kvm switches |
| N6308225F3017 | $13K | Digital Plaza LLC | 2025-08-04 / 2025-08-04 | 2025-09-04 | 50ea uninterrupted power supply taa compliant purchased under GSA contract. |
| N6308225F6004 | $11K | Digital Plaza LLC | 2025-04-28 / 2025-04-28 | 2025-05-28 | Rack mounted pro smart ups |
| 70FA3023F00000495 | $0 | Digital Plaza LLC | 2023-12-01 / 2024-05-08 | 2025-04-02 | National hurricane center a/v design |
| FA466423F0008 | $0 | Digital Plaza LLC | 2023-12-18 / 2024-02-16 | 2024-03-31 | This is a requirement to remove and replace an uninterruptible power supply (ups). a new ups system is critical for the efficient and continuous operation of the data center, room 11, building 2404 on march arb, ca. |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for FA4803-25-F-0019
Routed to Department of the Air Force FOIA (AFLCMC / AFRL / AFSC) · Official Agency FOIA Portal ↗